A21 - W912PM20R0028.pdf

PDF 1 MB Posted

Attached to
Environmental Support Services IDIQ Federal contract opportunity
Solicitation number
W912PM20R0028
Issued by
Department of the Army Corps of Engineers Engineering District Wilmington

View the file

Other files for this federal contract opportunity

Other files attached to Environmental Support Services IDIQ, newest first.
File Type Posted
A21 - AMD 3 - Sec L_Attachments.pdf PDF
A21 - AMD 3 - W912PM20R0028.pdf PDF
A21 - AMD 3 - W912PM20R0028 Conformed Copy.pdf PDF
A21 - AMD 3 - L-4_Price_Model.xlsx XLSX spreadsheet
A21 - AMD 2 - W912PM20R0028 Conformed Copy.pdf PDF
A21 - AMD 2 - Sec L_Attachments.pdf PDF
A21 - AMD 2 - W912PM20R0028.pdf PDF
A21 - AMD 2 - L-3_Rate Table.xlsx XLSX spreadsheet
A21 - AMD 1_PPQ.docx DOCX document
A21 - AMD 1_W912PM20R0028 Conformed Copy.pdf PDF
A21 - AMD 1_W912PM20R0028.pdf PDF
A21 - AMD 1 - L-4_Price_Model.xlsx XLSX spreadsheet
A21 - L-4_Price_Model.xlsx XLSX spreadsheet
A21 - Sec L_Attachments.pdf PDF
A21 - L-3_Rate Table.xlsx XLSX spreadsheet
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 02:00 PM local time 09 Mar 2021

X

A X B X C

D

EX

X G F 40 - 52

53 - 71 X H 72 - 80 karri.l.mares@usace.army.mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 80

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

W912PM 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and

N/A conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

KARRI MARES 910-251-4863

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 6

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT

PACKAGING AND MARKING

7 - 16 J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 19 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 20 - 21 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

22 - 39

PART II - CONTRACT CLAUSES

U S ARMY CORPS OF ENGINEERS, WILMINGTON

CONTRACTING - WILMINGTON DISTRICT

69 DARLINGTON AVENUE

WILMINGTON NC 28403

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

05 Feb 2021

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

W912PM20R0028

Section B - Supplies or Services and Prices

RATES

NOTE 1: See Rate tables in Section L Attachments.

NOTE 2: The entire contract minimum guarantee for the base plus all years if options are exercised is $2,500.00 with a maximum for the entire contract of $7,500,000.00. The constraints are listed further in section B of this solicitation.

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0001 1,500,000 Job Base: Environmental Support ServicesFFP

Contractor shall provide the labor, materials, facilities, and equipment necessary to perform all work identified on a task order basis and in accordance with the Performance Work Statement in Section C and the rates established on the Price Schedule.

FOB: Destination

PSC CD: F999

MAX

NET AMT

UNIT UNIT PRICE MAX AMOUNT

1001 1,500,000 Job OPTION OPTION 1: Environmental Support ServicesFFP

UNIT UNIT PRICE MAX AMOUNT

2001 1,500,000 Job OPTION OPTION 2: Environmental Support ServicesFFP

UNIT UNIT PRICE MAX AMOUNT

3001 1,500,000 Job OPTION OPTION 3: Environmental Support ServicesFFP

UNIT UNIT PRICE MAX AMOUNT

4001 1,500,000 Job OPTION OPTION 4: Environmental Support ServicesFFP

CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE

The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

2,500.00 $2,500.00 7,500,000.00 $7,500,000.00

DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND ORDER VALUE

The minimum quantity and order value for each Delivery/Task Order issued shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for each Delivery/Task Order issued shall not exceed the maximum quantity and order value stated in the following table.

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

1.00 $2,500.00 1,500,000.00 $1,500,000.00

CLIN MINIMUM/MAXIMUM QUANTITY AND CLIN VALUE

The minimum quantity(s) and CLIN value(s) for all orders issued against the CLIN(s) on this contract shall not be less than the minimum quantity(s) and CLIN value(s) stated in the following table. The maximum quantity(s) and CLIN value(s) for all orders issued against the CLIN(s) on this contract shall not exceed the maximum quantity(s) and CLIN value(s) stated in the following table.

CLIN

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

0001 $2,500.00 $1,500,000.00 1001 $2,500.00 $1,500,000.00 2001 $2,500.00 $1,500,000.00 3001 $2,500.00 $1,500,000.00 4001 $2,500.00 $1,500,000.00

CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE

The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.

CLIN

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

$2,500.00

$1,500,000.00

1001 2500.00

1,500,000.00

2001 2500.00

3001 2500.00

4001 2500.00

Section C - Descriptions and Specifications

PERFORMANCE WORK STATEMENT

C.1. General. The purpose of this contract is to provide a full range of environmental and related services to the United States Army Corps of Engineers (USACE) and its customers. The environmental services generally consist of environmental compliance, environmental restoration, environmental conservation (to include ecosystem restoration), and pollution prevention.

The Contractor shall furnish all materials, equipment, supplies, personnel, and all other services required to perform the environmental services outlined in this statement of work and as specifically identified in individual task orders.

The services required by this contract will be performed for the USACE and its customers. Work will be performed predominantly in the states of North Carolina and Virginia, but may also include South Carolina, Georgia, Florida, Alabama and Mississippi. However, work may also be performed elsewhere in the United States and its territories at the specific request of the USACE or one of its customers in accordance with ER 5-1-10 (Corps-Wide Areas of Work Responsibility). The Contractor may be required to perform tasks on-site or at their own facilities.

Task orders may use Scopes Of Work (SOW). A SOW structures all aspects of an acquisition around the purpose of the work to be performed and does not dictate how the work is to be accomplished. It is written to ensure that Contractors are given the freedom to determine how to best meet the United States Government’s performance objectives and provides for payment only when the results meet or exceed these objectives. It maximizes Contractor control of work processes and allows for innovation in approaching various work requirements. A SOW emphasizes performance that can be contractually defined so that the results of the Contractor’s effort can be measured in terms of technical and quality achievement, schedule progress, or cost performance. The goal of Performance-Based Acquisition (PBA) is to:

Save money by reducing contract costs through elimination of unnecessary effort, allowing for innovation by the Contractor, and also by reducing Government surveillance.

Enable the Government to shift its emphasis from processes to outputs.

Hold Contractors accountable for the end results.

Ensure that Contractors are given the freedom to determine how to meet the Government’s performance objectives.

C.2 Scope of Work: The time frame and specific requirements for each item of work will be described in individual task orders. The description of work stated herein provides a general understanding of the Contractor functions to be performed. Individual task orders will contain the specific requirements. Technical requirements described herein in no way limit the activities that may be required under the terms of this contract.

C.2.1 Environmental Compliance: The Contractor shall be capable of performing a wide range of environmental compliance work. Examples environmental compliance work that may be required are listed below. These examples are not intended to be all-inclusive.

a. Analyze environmental impacts of project alternatives and prepare documentation required by the National Environmental Policy Act such as Records of Environmental Consideration (REC), Environmental Assessments (EAs), Findings of No Significant Impact (FONSIs), Environmental Impact Statements (EISs), and Records of Decision (RODs).

b. Comply with Federal, State, and/or local hazardous waste handling and disposal regulations. This may include verifying that hazardous wastes are properly labeled, stored, and disposed and that proper transportation to permitted disposal sites is utilized.

c. Comply with Federal, State, and/or local Emergency Planning and Community Right to Know regulations.

d. Comply with Federal, State, and/or local water quality regulations. This includes, but is not limited to, drinking water systems, wastewater treatment plants and systems, and stormwater systems and upgrades.

e. Comply with Federal, State, and/or local air pollution regulations. This includes, but is not limited to, preparation of Clean Air Act permits, monitoring air emissions, maintaining air emissions inventories, inspecting permitted facilities, and implementing corrective actions to reduce or minimize air emissions.

f. Comply with Federal, State, and/or local solid waste handling, disposal regulations, and recycling programs. This includes, but is not limited to, solid waste management plans, solid waste recycling, solid waste landfill inspection and permitting, actual disposal/recycling of solid waste generated by others, activities related to facility upgrades/modernization, and implementing corrective actions in landfills.

g. Prepare Biological Assessments of project impacts on protected (Federal and State) species. Develop management and/or mitigation plans for protected species.

h. Conduct surveys and/or monitoring for protected species. Work may involve, but may not be limited to, conducting red-cockaded woodpecker (RCW) surveys, cavity and cluster activity assessment, censusing and monitoring of populations, capturing and banding of nestlings and adults, habitat management, installing cavity restrictors, constructing artificial cavities, conducting foraging habitat analyses, preparing management plans, Safe Harbor Assessments and Habitat Conservation Plans. Also, preparation of forest stewardship and native plant community restoration plans, and timber harvesting plans (including timber marking and site monitoring) within red-cockaded woodpecker (RCW) habitats in accordance with federal guidelines.

i Establish and/or upgrade GIS (survey, mapping, and remote sensing) and demonstrate capability to represent individual task work products in GIS, as applicable.

j. Establish and/or upgrade environmental databases and GIS (i.e., locations of threatened and/or endangered species, timber stands, burn areas, etc.). Some of these databases will be integrated with GIS systems.

k. Conduct lead-based paint investigations.

l. Conduct asbestos surveys.

m. Conduct radon surveys and testing.

n. Conduct indoor air quality monitoring and take corrective actions. These include, but are not limited to, Industrial Hygiene Services, mold investigations, moisture problems, and remedial actions to reduce or eliminate mold and moisture problems.

o. Execute/Accomplish, or assist in executing/accomplishing, installation sustainability and environmental management system initiatives to include facility maintenance databases, quality assurance, inspection, matrix, and higher reporting of facility readiness.

p. Conduct delineations of wetlands, streams/other surface waters, and areas containing submerged aquatic vegetation.

q. Prepare restoration/mitigation plans for primary nursery habitats, wetlands, and submerged aquatic vegetation. These services may include the planting of vegetation on restoration/mitigation sites. Monitor constructed mitigation sites for compliance with mitigation plan requirements, including hydrology, soils, vegetation, and faunal inhabitants

r. Conduct analyses of the physical and chemical characteristics of soils from terrestrial environments, and of sediments and water from freshwater, estuarine, and marine environments. These services may include design of the sampling and testing program, field collection of samples, timely and appropriate handling and/or transport of samples, physical and chemical analyses, quality assurance and quality control, data compilation and interpretation, and report preparation.

s. Prepare Section 404(b) reports and applications for Section 401 state water quality certification. Prepare project consistency determinations addressing requirements of state coastal management programs and local land use plans

t. Prepare forest management plans

u. Conduct cultural resources studies, data collection, and field investigations addressing archaeological, historic, and historic architectural elements. Prepare associated reports to include National Register of Historic Places (NRHP) status and associated recommendations. Provide data in GIS format to include, but not necessarily be limited to, survey boundaries, shovel test locations, and site locations/boundaries.

v. Conduct environmental audits and prepare summary reports for approval by the USACE and/or applicable Federal, State, and/or local regulatory authorities.

C.2.2 Environmental Restoration: The Contractor shall be capable of conducting site investigations through implementation of traditional methods or innovative technologies. Examples of environmental restoration work that may be required under this contract are listed below. These examples are not intended to be all-inclusive.

a. Develop site-specific work plans with accompanying subplans. These subplans include but are not limited to such documents as sampling and analysis plans and quality control plans.

b. Conduct sampling and testing/analyses of soil (shallow, shallow subsurface, and deep subsurface) and/or other solid matter; sampling and testing/analyses of sediment; sampling and testing/analyses of groundwater; and sampling and testing/analyses of surface water. Soils may require tests/analyses for both chemical and geotechnical parameters and this action may include sampling of contaminated soil to determine hazardous waste characteristics for disposal purposes. Groundwater sampling may involve installation and development of monitoring wells.

c. Conduct topographic surveys.

d. Conduct chemical sampling, treatment, and/or disposal of containerized wastes, such as waste inside tanks, drums, and transformers.

e. Provide National Environmental Laboratory Accreditation Conference (NELAC)-approved laboratory services for chemical and physical testing/analyses of air, soil, groundwater, surface water, and sediment samples that may be required incidental to other work being performed.

f. Participate in community education and public affairs activities.

C.2.3 Environmental Conservation: The Contractor shall be capable of performing a wide range of environmental conservation work. Examples of some of the environmental conservation work that may be required are listed below. These examples are not intended to be all-inclusive.

a. Perform studies and investigations and reviews of environmental/natural resources programs to ensure compliance with Federal, State, and local regulations. Interact with Federal, State, and/or local agencies in relation to environmental/natural resources programs.

b. Provide a full array of cultural resources compliance services including, but not limited to, cultural resources and archaeological studies and investigations, curation of artifacts, Historic Preservation Plans, Historic Properties Management Plans, landscape inventories and evaluations, Integrated Cultural Resources Management Plans, and reviews of cultural resources programs to ensure compliance with Federal, State, and local regulations.

Interact with Federal, State, and/or local agencies in relation to cultural resources programs to ensure compliance.

c. Conduct archaeological reconnaissance and/or Phase I and Phase II surveys and perform Phase III data recovery. Perform archaeological mitigation and restoration.

d. Perform wetlands studies and investigations, reviews of wetlands programs to ensure compliance with Federal, State, and/or local regulations, and prepare wetlands-related permits.

e. Conduct environmental resource studies. These may include biological data collection, field investigations, surveys, mapping, and/or monitoring to address vegetation, fish, and/or wildlife in all habitat types.

C.2.4 Pollution Prevention: The Contractor shall be capable of performing a wide range of pollution prevention work. Examples of some of the pollution prevention work that may be required are listed below. These examples are not intended to be all-inclusive.

a. Perform reviews of pollution prevention programs to ensure compliance with Federal, State, and local regulations, prepare/revise pollution prevention plans, and prepare/revise pollution prevention training programs.

This may include, but may not be limited to, used oil recycling and disposal.

b. Perform reviews of spill prevention control programs to ensure compliance with Federal, State, and/or local regulations and prepare spill prevention control plans.

c. Perform reviews/upgrades of underground storage tank (UST) and aboveground storage tank (AST) programs and systems to ensure compliance with Federal, State, and/or local regulations and prepare UST/AST management plans and UST/AST databases.

d. Perform reviews of stormwater and erosion control programs to ensure compliance with Federal, State, and/or local regulations, prepare stormwater management plans, and perform work to prevent, reduce or eliminate the impacts of stormwater. This may include ensuring compliance with the National Pollutant Discharge Elimination System (NPDES) permit program.

e. Prepare/revise comprehensive environmental management systems. This may include assistance in obtaining ISO 14000 registration.

f. Perform reviews of noise pollution programs to ensure compliance with Federal, State, and/or local regulations and monitoring and mitigation of noise sources.

g. Evaluate facilities for the potential for reducing, substituting, or eliminating processes and materials that generate hazardous wastes or solid, non-hazardous wastes that are not recyclable.

C.3 Administrative Requirements:

a. Permits, Licenses and Approvals: The Contractor, the Contractor’s subcontractors, and the Contractor’s suppliers shall perform all work in full compliance with applicable Federal, State, and/or local environmental laws and regulations including, but not limited to, the following: pertinent Occupational Safety and Health Administration (OSHA) and Department of Transportation (DOT) requirements, the National Environmental Policy Act (NEPA), the Clean Water Act, the Clean Air Act, the Endangered Species Act, the National Historic Preservation Act, the Fish and Wildlife Conservation Act, the Federal Insecticide, Fungicide, and Rodenticide Act, the Asbestos Hazard Emergency Response Act, the Noise Control Act, the Pollution Prevention Act, the Toxic Substances Control Act, and the Resource Conservation and Recovery Act, as amended by the Hazardous and Solid Waste Amendments. Nothing in this contract shall relieve the Contractor of his responsibility to comply with these laws and regulations. Further, the Contractor shall obtain all environmental permits, licenses, and/or certificates required by each task order. When required, the Contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to perform the work as defined in each task order’s Scope of Work. Personnel conducting work on endangered and threatened species must have demonstrable knowledge of the biology and current conservation practices for the species in the work area, and they must have, or be able to demonstrate the ability to obtain, all necessary permits required to survey and monitor listed species. The Contractor shall provide necessary labor, supervision, insurance, vehicles, equipment, packing materials, labels, waste analysis, lab packing, weight slips, and manifest forms to safely and legally transport and dispose of, or recycle, solid non-hazardous waste, hazardous waste, and hazardous materials. The Contractor shall perform all work in accordance with 40 CFR Parts 190 through 289 and 49 CFR Parts 100 through 177.

Should it become necessary for the Contractor to secure the right of ingress and egress to perform any of the work required under this contract on properties not owned or controlled by the Government, the Contractor shall, if practicable, secure the consent of the owner, his representative, or agent prior to effecting entry on such property. In the event all efforts by the Contractor fail to gain permission from the property owner(s) for entry to the property for performing the required work, the Contractor shall contact the Contracting Officer (KO) to obtain instructions for further action. In the event that the Contracting Officer must take action to obtain right-of-entry for the Contractor, the Contractor will be entitled to an equitable extension of time for the period required to obtain said right-of-entry.

The Contractor shall assume all responsibility for, and take all precautions to prevent, damage to private and Government-owned property. The Contractor shall be responsible for any claims covering actions not approved by the Contracting Officer.

b. Progress Reports and Payment Requests: A progress report shall be submitted to the Contracting Officer’s Representative (COR) once each month during each task order period. A COR will be assigned for each task order. The report shall describe the work completed during the reporting period and give the project status on a percentage basis of the total amount of work completed. For some task orders, a Gantt chart (in Microsoft Project format) showing all project deliverables, the overall project schedule, and the work accomplished to date may be required. A payment request shall also be submitted to the Wilmington District once each month that work is performed. The percent claimed for payment shall coincide with the progress report. The progress report and payment request should be mailed to the attention of the designated COR at the following:

United States Army Corps of Engineers

Wilmington District

ATTN: CESAW-ECP-PE

69 Darlington Ave Wilmington, NC 28403

Email: To be provided upon award

c. Project Documentation: Required documentation shall include the following:

(1) Meeting Minutes. In accordance with specific instructions contained within each individual task order, the Contractor shall provide a record of all meetings, telephone conferences, and other discussions or verbal directives, in which the Contractor or a representative of the Contractor participated. The records shall be dated and submitted in accordance with specific instructions contained in each individual task order. At a minimum these records shall identify the participating personnel, subjects discussed, conclusions reached, and assigned actions.

(2) Project Records. The Contractor shall assemble and index all records obtained or developed by the Contractor in the performance of each task order. At the completion of the work on the task order, the Contractor shall place all the original records, including the index, into secure boxes for transport to a location as directed by the COR. The Contractor shall retain a copy of all project deliverables and the project record index. The Contractor shall not retain any other records or copies of records except with permission of the KO.

(3) Confidentiality. All documents and information developed or obtained by the Contractor shall be considered privileged information of the Government. The Contractor shall not release or allow access to this information outside of the Government, except as properly approved by the appropriate Government officials. All requests for the release of information shall be referred by the Contractor to the USACE Program Manager (PM). The PM will coordinate the request with the appropriate officials for reply. The obligation to maintain the confidentiality of information does not end with the completion of the contract and/or individual task orders, but continues until released by the KO or as determined by a United States court of competent jurisdiction. See Clause at DFARS 52.204-7000, DISCLOSURE OF INFORMATION, Section I.

d. Contract Deliverables. The Contractor shall submit all deliverables in draft and final format as required within the specific instructions of each task order, including the format, number of copies, and distribution. At a minimum, all final copies of the native e-file documents shall include one copy in PDF format (*.pdf) submitted on CD-ROM disk or otherwise electronically submitted in coordination with the COR.

Currently the USACE standards for software compatibility are ArcGIS Desktop 10.6, Adobe Acrobat Pro DC, MicroStation Version 7.1, Microsoft Office 365, and Microsoft Windows 10. These products are to be considered the default software of choice unless otherwise specified within individual task order scopes of work, as determined by individual customer requirements or as the District incorporates updated versions of its software.

(1) CADD Files: When required and requested in a task order, all CADD files (survey and topographic data, etc.)

shall be digitized into files compatible with Microstation vector format (or other format if directed in the individual task order). Specific design file features will be provided in the individual task orders. CADD files shall also meet any upgrade to all USACE systems throughout the duration of the contract.

(2) Electronic Files: All final reports and documents, including laboratory analysis data, shall be submitted electronically or on CD in Adobe PDF, Microsoft Word, and/or Microsoft Excel or other approved format.

e. Contract Manpower Reporting (CMR).

The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the Contractor shall report ALL Contractor manpower (including subcontractor manpower) required for performance of this contract for military projects. The Contractor shall completely fill in all the information in the format using the following web address https://www.sam.gov/SAM/.

The required information includes:

1) Contracting Office, Contracting Officer, Contracting Officers Technical Representative (COTR) or the Contracting Officers Representative (COR);

2) Contract number, including task/delivery order number;

3) Beginning and ending dates covered by reporting period;

4) Contractor's name, address, phone number, e-mail address, identity of Contractor employee entering data;

5) Estimated direct labor hours (including sub-Contractors);

6) Estimated direct labor dollars paid this reporting period (including sub-Contractors);

7) Total payments (including sub-Contractors);

8) Predominant Federal Service Code (FSC) reflecting services provided by Contractor (and separate predominant FSC for each sub-Contractor if different);

9) Estimated data collection cost;

10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring

Activity (the Army Requiring Activity is responsible for providing the Contractor with its UIC for the purposes of reporting this information);

11) Locations where Contractor and sub-Contractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website);

12) Presence of deployment or contingency contract language; and

13) Number of Contractor and sub-Contractor employees deployed in theater this reporting period (by country).

As part of its submission, the Contractor shall provide the estimated total cost (if any) incurred to comply with this reporting requirement. Reporting period shall be the period of performance not to exceed 12 months ending 30 September of each government fiscal year and must be reported by 31 October of each calendar year.

C.4 Government Furnished Information: Specific Government furnished information for each item of work will be described in the task orders. In general, the information will consist of applicable maps (to include GIS), information gathered during previous investigations (e.g., results from environmental compliance audits and surveys, geologic logs from wells or borings, results from any previously conducted soil and groundwater sampling and chemical analyses, etc.), available hydrogeologic information, etc..

C.5 Task Orders:

a. As the needs of the USACE are defined, the KO will notify the Contractor of a need through the issuance of a Request for Proposal (RFP) Letter. A Scope of Work attached to the RFP Letter will provide the Contractor with a description of the services to be provided for the prospective task order. A copy of the wage determination will also be furnished from the area where the work will be performed. The Contractor shall then prepare his proposal for accomplishing the services by preparing and submitting sufficient documentation (including identifying all subcontractors and associated costs) to ensure that the Contractor has provided sufficient planning to accomplish the required task. The proposal provided by the Contractor shall provide a detailed breakdown of the costs, that shall include level of effort (by labor category listed in the Schedule, Section B), identify all subcontractors and their associated costs, and account for any required travel or special equipment or supplies. Cost quotes shall be broken down into distinct equipment costs and installation costs in terms of man-hours, dollars, and skills. In cases where the Contractor intends to hire a discipline to perform work, and the rate for this discipline has not been established under Schedule B of the contract, the rate will be negotiated. The type of discipline required will determine the rate value to be applied. It is recommended that this rate be negotiated before hiring of the discipline takes place. Hiring before a rate has been negotiated will not justify fair and reasonable cost. The proposal will be used to establish the Contractor’s capability to perform the work and as a basis for negotiating the cost of the work. The timeline regarding receipt of the Contractor’s proposal will be identified in each RFP Letter. Upon receipt of the Contractor’s proposal the USACE will review the proposal documents for adequacy and completeness. The USACE will then negotiate the proposed effort with the Contractor, the firm fixed-price cost for performing the work, and the time period for performing the work.

b. In addition to the unit prices specified in the Schedule, Section B, out-of-town travel expenses, which have been negotiated as part of the task order, will be reimbursed. Cost for lodging, meals, and incidental expenses will be in accordance with per diem rates for travel set forth in the Government’s Joint Travel Regulations.

c. Equipment and Special supplies (Other Direct Costs), when required for special tasks, will also be reimbursed under this contract. The requirement and cost for equipment usage and special supplies will be negotiated on an individual task order basis and must be approved as part of each task order. Note: Specialized equipment and supplies are those above and beyond what is typically required for performance of a task.

d. Work will only be ordered through the issuance of individual task orders. All task orders issued will be for the services specified therein and will be in accordance with the fixed rates established in Section B of the Schedule. The cost of work that is not covered by the fixed rates in this contract will be negotiated on an individual task order basis.

e. The Contracting Officer’s Representative named in the task order will be responsible for the administration of task orders placed hereunder. The Contracting Officer’s Representative does not have authority to modify any provision of this contract. Any request for deviation from the terms of this contract or any task orders issued hereunder must be submitted to the Contracting Officer for contractual action.

f. The Contractor shall notify the Contracting Officer’s Representative upon completion of each individual task order. The Contractor shall give advance notice of the date the work will be fully completed and ready for final inspection.

g. A DD Form 1155 will be issued for each task order. Each task order will include:

(1) Date of task order; contract number; task order number; task order price and/or performance data; accounting and appropriation data; and any other pertinent information. Delivery or performance will be specified in each task order issued hereunder.

(2) The specific Scope of Work related to the work covered by the task order and any other special technical requirements, instructions, or clearances.

C.6 Technical Requirements:

a. Safety and Health: This subsection describes, in general terms, the minimum Contractor safety, health, and emergency response requirements associated with this contract. The Contractor shall have an ongoing Safety and Health Program meeting the requirements of the OSHA standard, 29 CFR 1910.20, 29 CFR 1910.21, and 29

CFR 1910.120.

(1) Safety and Health Program: The USACE reserves the right to review the Contractor’s corporate “Safety and Health Program.” The Contractor shall incorporate any additions or revisions required by the Contracting Officer.

(2) Site Safety and Health Plan: For each action at an uncontrolled hazardous waste site (or when directed in the specific task order), the Contractor shall prepare a written Site Safety and Health Plan (SSHP) that complies with the specific task order. Acceptance of the Contractor’s SSHP is required prior to start of field activities. The USACE reserves the right to visit and/or inspect work at any time and reserves the right to require the Contractor to make changes in his SSHP and operations as necessary to assure the safety and health of all persons on or near the site.

(3) Regulations: The Contractor’s Safety and Health Program shall comply with and reflect the following applicable regulations and publications:

(a) OSHA Standards, 29 CFR 1910 and 29 CFR 1926.

(b) U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1.

(c) Federal Acquisition Regulation (FAR) Clause “Accident Prevention” (52.236-13).

(d) Other relevant Federal, State, and local regulations.

b. Chemistry: This subsection identifies required chemical expertise and laboratory support. The capabilities of the in-house or subcontracted stationary lab shall include the whole range of environmental analyses of air, water, soil/sediments, and materials using standard methods. All levels of data quality will be specified by the Contractor and approved by the USACE.

(1) Laboratory Support Services: Contract laboratory services may be used either in combination or individually, depending on the circumstances of the project. The laboratory shall maintain accreditation under the National Environmental Laboratory Accreditation Conference/Program (NELAC/P).

(2) Analysis capabilities shall include, at a minimum, volatile organic compounds (from the United States Environmental Protection Agency’s (USEPA) Target Compound List (TCL)), semi-volatile organic compounds (from TCL), TAL metals, cyanide, explosives compounds, pesticides/PCBs, herbicides, dioxins and furans, major anions and cations, biological and limnological parameters, and radioactivity. Tests/analyses to determine if a material is hazardous waste according to 40 CFR 261 shall also be within the lab’s capability.

(3) Analytical methods used shall be in accordance with USEPA standard methods, unless technically impractical. Methods shall include, but shall not be limited to, those described in EPA SW-846, EPA 600/4-79-020, and EPA 600/4-82-057. Substitution of equivalent USEPA approved methods that can meet required detection limits may be allowed if approved by the COR.

(4) Field testing capability shall include, as a minimum, the standards, equipment, and knowledge to use photo ionizing detectors, flame ionizing instruments, combustible gas/oxygen meters, ionizing radiation meters, and pH and conductivity meters. Other field testing devices (e.g., portable Gas Chromatograph, immunoassay kits, etc.)

shall be readily available for use for meeting project specific needs.

(5) Quality Control

a. The laboratory shall maintain accreditation under the National Environmental Laboratory Accreditation Conference/Program (NELAC/P).

b. Contractors shall have an established quality control program that is based on USEPA’s quality control program as outlined in Handbook for Analytical Quality Control in Water and Wastewater Laboratories, USEPA 600/4-79-019, March 1979, USEPA Office of Research and Development, Cincinnati, Ohio and complies with the requirements of the Department of Defense Quality Systems Manual for Environmental Laboratories, October, 2000.

c. Upon completion of the analyses, the laboratory shall prepare a quality control report which includes the precision and accuracy of data generated on the analyzed samples.

d. Electronic forms (Adobe PDF format) from all Laboratory Instruments analyses shall be kept on file in the event that any problems with the data arise.

e. A quality control plan (QCP) will be submitted with a task order proposal to accomplish work described in the SOW. The QCP should include:

(1) Listings of all analytical equipment and sampling devices to be used in the study, methods for calibrating in the field and lab, precision and accuracy standards, maintenance schedules, record keeping methods, and personnel responsible.

(2) Field survey procedures, including boat to be used, description of field notes to be taken, and sample collection, processing, and storage techniques. Particular attention should be given to field sampling and handling procedures to avoid contamination of water and sediment samples.

(3) Labeling system to be employed to ensure proper tracking of samples from collection through analysis to listing in final report.

(4) Laboratory analytical techniques and quality control procedures.

(5) Personnel responsible for accurately processing samples.

c. Environmental: The expected environmental expertise shall consist of, but not be limited to, wetlands, biology (to include Federal/State-listed threatened and endangered flora/fauna), archaeology, hazardous waste management, risk assessment, environmental compliance, and environmental management.

C.7 Contractor Personnel and Qualifications: The Contractor shall furnish sufficient technical, supervisory, and administrative personnel at all times to ensure performance of the work in accordance with the delivery schedule.

All work under this contract shall be conducted in a professional manner that will provide the highest degree of precision and accuracy obtainable for the task being performed. All quality control limits required in each task order and set in the work plan shall be strictly adhered to. Any deviation shall be reported immediately in writing to the Contracting Officer and either the deviation will be approved or an alternate plan will be agreed upon and approved in writing by the Contracting Officer before the work can continue. If either the quality standards are not met or the Contractor fails to report and receive written approval for all deviations and alternate plans, the work in question shall be repeated in a satisfactory manner on a mutually agreed upon schedule at no additional cost to the Government.

a. Program Manager: The Contractor shall appoint a Program Manager to serve as a single point of contact and liaison between the Contractor and the Contracting Officer and/or Contracting Officer’s Representative for all work required under the contract. Upon award of the contract, the Contractor shall immediately provide the Contracting Officer with the name of the individual so designated, in writing. The Contractor’s Program Manager will be responsible for the complete coordination of all work developed under the contract. All work shall be accomplished with adequate internal controls and review procedures, which shall eliminate conflicts, errors, and omissions, and ensure the technical accuracy of all reports, designs, drawings, and specifications.

b. Project Manager: Unless otherwise required in the individual task order (i.e., some task orders may require different expertise), the Contractor’s Project Manager for each task order shall have a science-based degree from an accredited four year college or university and a minimum of four years’ experience directing and managing environmental projects.

c. Registered Professionals: When required by Federal, State, and/or local regulations and when requested by the USACE, the Contractor shall provide Registered Professionals for various disciplines related to the tasks described above, each having a minimum of two years of environmental project experience as described in paragraph C.2 of this document.

d. Quality Control: Professional level skills and management practices are required in the performance of the contract. Accordingly, the Contractor shall establish an effective quality control program to assure that the end products meet professional standards and comply with the contract requirements. The Contractor’s senior quality control individual shall report to a senior company officer. The quality control and production management chains-of-command shall be mutually exclusive.

C.8 Security: When work is performed at a Federal, State, and/or local installation or facility, the Contractor shall comply with all security requirements of that installation or facility.

C.9 Waste Management: The Contractor shall follow proper waste management procedures. Waste disposal shall fully comply with appropriate Federal, State, and/or local regulations controlling hazardous waste classification/disposal, land disposal restrictions, and CERCLA waste management.

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 1001 Destination Government Destination Government 2001 Destination Government Destination Government 3001 Destination Government Destination Government 4001 Destination Government Destination Government

CLAUSES INCORPORATED BY REFERENCE

52.246-4 Inspection Of Services--Fixed Price AUG 1996

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 POP 01-MAY-2021 TO

30-APR-2022

N/A ENVIRONMENTAL RESOURCE SECTION

JUSTIN BASHAW

USAED WILMINGTON 69 DARLINGTON

AVE.

WILMINGTON NC 28403

910-251-4774

W912PM

1001 POP 01-MAY-2022 TO

30-APR-2023

N/A (SAME AS PREVIOUS LOCATION)

2001 POP 01-MAY-2023 TO

30-APR-2025

N/A (SAME AS PREVIOUS LOCATION)

3001 POP 01-MAY-2024 TO

30-APR-2025

N/A (SAME AS PREVIOUS LOCATION)

4001 POP 01-MAY-2025 TO

30-APR-2026

N/A (SAME AS PREVIOUS LOCATION)

52.242-15 Stop-Work Order AUG 1989 52.242-17 Government Delay Of Work APR 1984

Section G - Contract Administration Data

ADMINSTRATIVE INSTRUCTIONS

1. SUBMISSION OF INVOICES

(a) Original invoices for services performed under the contract will be submitted to the District responsible for the task order, as identified on the individual task order. Payment will be made by:

USACE FINANCE CENTER ATTN: DISBURSING

5722 INTEGRITY DRIVE

MILLINGTON, TN 28054-5005

(b) One copy of all invoices shall be forwarded to the following for review and certification:

Contracting Officer’s Representative (COR) designated at the time of task order award.

2. CONTRACT ADMINISTRATION DATA

(a) This contract will be administered by the District identified in Block 8 of the Standard Form 33.

(b) The COR for this IDIQ will be identified at time of award.

(c) Individual task order CORs and Project Managers will be assigned on a task order basis.

(d) The Primary Contracting Officer (KO) Mr. Ed Boddie, however, any KO holding the appropriate warrant authority in the Wilmington District can serve as the KO for this contract.

(e) The Contracting Office is designated on Block 7 of the SF33:

(f) Other Districts within the South Atlantic Division (SAD) may utilize this contract after approval by the Wilmington District. Only a warranted KO, acting within their delegated limits, has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the KO attempts to make changes to the terms and conditions of this contract, the Contractor shall not proceed with the change and shall immediately notify the KO, as designated on the task order.

(End)

Section H - Special Contract Requirements

AT/OPSEC

ANTITERRORISM/OPERATIONS SECURITY

AT Level I Training. All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, controlled access areas, or require network access, shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Upon request, the contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: http://jko.jten.mil/courses/atl1/launch.html; or it can be provided by the RA ATO in presentation form which will be documented via memorandum.

Access and General Protection/Security Policy and Procedures. All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.

For contractors who do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

Suspicious Activity Reporting Training (e.g. iWATCH, CorpsWatch, or See Something, Say Something). The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .