A21 - FY22_CFR_LD3_Repairs_RTA_Plans.pdf

PDF 3 MB Posted

Attached to
William O. Huske Lock and Dam Esplanade Repair, Bladen County, North Carolina
Solicitation number
W912pm22B0016
Issued by

About this file

This package includes contract drawings and specifications for the William O. Huske Lock and Dam Esplanade Repair project in Bladen County, North Carolina. The U.S. Army Corps of Engineers, Wilmington District is soliciting a fixed-price contract to remove, regrade, and replace a portion of the existing concrete esplanade. Additional work includes grout injecting joints between the retaining wall and lock wall, and placing riprap downstream of the lock. The solicitation will be issued on or about June 3, 2022. The bid opening date will be specified in the solicitation. The NAICS code is 237990 and size standard is $39.5 million. Offerors must register in SAM to be eligible for award. Interested parties should monitor http://sam.gov for solicitation details and amendments. The magnitude of construction is estimated between $500,000 and $1 million. The point of contact for additional information is the listed contract specialist.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C O

VE

R

S H

EE

T

ISSUE DATE: MAY 2022

US Army Corps of Engineers ®

Wilmington District

Approval Recommended: *

Approved: *

DATE

DATECHIEF, ENGINEERING BRANCH

* THIS PROJECT WAS DESIGNED BY THE U.S. ARMY CORPS OF ENGINEERS,

WILMINGTON DISTRICT. INDIVIDUALS WHOSE SIGNATURES AND REGISTRATION

DESIGNATIONS APPEAR ON THESE DOCUMENTS ARE OPERATING WITHIN THE

SCOPE OF THEIR EMPLOYMENT. SIGNATURES ARE REQUIRED BY ER 1110-1-8152.

CHIEF, DESIGN and GENERAL ENGINEERING SECTION

IN BLADEN COUNTY, NORTH CAROLINA

G-000

WILLIAM O. HUSKE LOCK AND DAM ESPLANADE REPAIR

SIGNATURES AFFIXED BELOW INDICATE OFFICIAL RECOMMENDATION

AND APPROVAL OF ALL DRAWINGS IN THIS SET AS INDEXED ON SHEET G-001-O.

AMENDMENTS:

IFB NO.:

CONTRACT NO.: W912PM22XXXXX

G -0

.d w g

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

W

IL

LI

AM

O . H

U

SK

E

LO

C K

D

AM

E

SP

LA

N

AD

E R

EP

AI

R

IN

B

LA

D

EN

C O

U N

TY

, N

O R

TH

C

AR

O

LI

N

A

SHEET ID

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

W

IL

M

IN

G

TO

N D

IS

TR

IC

T

D

AR

LI

N G

TO

N

A

VE

N U

E W

IL

M

IN

G

TO

N

, N O

R

TH

C

AR

O

LI

N A

D R

AW

IN

G C

O D

E:

US Army Corps of Engineers

FI

LE

N

AM

E:

LD

-0 5-

W

2P M

B0

TB

D

AP

R

IL

"x

R

TA

S

ET

J.

C

AR

TE

R

E.

D

U N

LO

P

J.

M

AN

N

IN

G

J.

C

AR

TE

R

W912PM22B0016 24 MAY 2022

24 MAY 2022

PLATE TITLE

0 0.5 1

SCALE IN MILES

PROJECT LOCATION

HYDEBEAUFORTPITT

EDGECOMBE

WASHINGTON TYRREL

DARE

PAMLICO

CRAVEN

JONES

ONSLOW

DUPLIN

PENDER

NEW

HA

NO

VE

R

BRUNSWICK

COLUMBUS

BLADEN

ROBESON

HOKE

M O

O R

E

LEE

CHATHAM

AL

AM

AN

C

E C

AS

W

EL

L

PERSON

ORANGE

DURHAM

WAKE

JOHNSTON

FRANKLIN

VANCE

WARREN

HALIFAX

NORTHAMPTON

HERTFORD

GATES

NASH

WILSON

SAMPSON

CUMBERLAND

CARTERET

G R

AN

VI

LL

E

PERQUIMANS

PASQUOTANK

CAMDEN

CURRITUCK

MARTIN

BERTIE

PAMLICO SOUND

ATLANTIC O

CEAN

GREENE

LENOIR

WAYNE

V I R G I N I A

S O U T H C A R O L I N A

HARNETT

NOT TO SCALE

Wilmington

Manteo

Elizabeth City

Cape Hatteras

Cape Lookout

Rodanthe

PROJECT

Morehead City

PROJECT OVERVIEW

DRAWING INDEX

G-001

G

1.

D

W G

COVER SHEET

DRAWING INDEX

EXISTING CONDITIONS

DEMOLITION PLAN

FINAL SITE PLAN

TYPICAL DETAILS

EROSION AND SEDIMENT CONTROL DETAILS

TEMPORARY STOCKPILE DETAIL

REFERENCE DRAWING

REFERENCE DRAWING

REFERENCE DRAWING

G-000 G-101 V-101 C-001 C-101 C-301

CE501

CE502

R-001 R-002 R-003

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

W

IL

LI

AM

O . H

U

SK

E

LO

C K

D

AM

E

SP

LA

N

AD

E R

EP

AI

R

IN

B

LA

D

EN

C O

U N

TY

, N

O R

TH

C

AR

O

LI

N

A

SHEET ID

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

W

IL

M

IN

G

TO

N D

IS

TR

IC

T

D

AR

LI

N G

TO

N

A

VE

N U

E W

IL

M

IN

G

TO

N

, N O

R

TH

C

AR

O

LI

N A

D R

AW

IN

G C

O D

E:

US Army Corps of Engineers

FI

LE

N

AM

E:

LD

-0 5-

W

2P M

B0

TB

D

AP

R

IL

"x

R

TA

S

ET

J.

C

AR

TE

R

J.

C

AR

TE

R

E.

D

U N

LO

P

J.

M

AN

N

IN

G

WILLIAM O. HUSKE LOCK AND DAM

HWY. 87

COUNTY LINE RD.

HWY. 1303

G

LEN

G

ER

Y R D

CRITTER CREEK RD.

C

APE FEAR

R

IVER

FLO

W

AutoCAD SHX Text

DRAWING INDEX

AutoCAD SHX Text

ROANOKE

AutoCAD SHX Text

RIVER

AutoCAD SHX Text

NEUSE

AutoCAD SHX Text

RIVER

AutoCAD SHX Text

CHOWAN

AutoCAD SHX Text

CAPE

AutoCAD SHX Text

FEAR

AutoCAD SHX Text

RIVER

AutoCAD SHX Text N

40 40

E E

E E

E

E

E

E

E

E

E X

X

XXXXXXXXXXXX

X X

E E

E

E E E E E E E E E E

E E

E E

E E

E E

E

E E

E E E

E

E E

E E

E

PP

PP

PP

D I

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

W

IL

LI

AM

O . H

U

SK

E

LO

C K

D

AM

E

SP

LA

N

AD

E R

EP

AI

R

IN

B

LA

D

EN

C O

U N

TY

, N

O R

TH

C

AR

O

LI

N

A

SHEET ID

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

W

IL

M

IN

G

TO

N D

IS

TR

IC

T

D

AR

LI

N G

TO

N

A

VE

N U

E W

IL

M

IN

G

TO

N

, N O

R

TH

C

AR

O

LI

N A

D R

AW

IN

G C

O D

E:

US Army Corps of Engineers

FI

LE

N

AM

E:

LD

-0 5-

W

2P M

B0

TB

D

AP

R

IL

"x

R

TA

S

ET

Feet 0 60 120

NOTES:

1. Survey performed by:

James D. Jacaruso, NC PLS L-3706 USACE, Wilmington District 910-251-4780 (Office) 910-409-8875 ( Cell)

2. Horizontal Control:

The Local Project Control Points (LPCP) are JLD3 - MON C, a concrete monument (COE PID: AHV623), and LD3 - MON D, a concrete monument (COE PID: AHV625). The NAD 1983 NC State Plane coordinates, in U.S. Survey Feet for each LPCP are as follows:

LD3 - MON C:

N: 394660.25 E: 2052864.27

LD3 - MON D:

N: 395018.85 E: 2052814.72

The field survey was performed using a combination of GNSS with the NC VRS and total station.

3. No determination has been made by the surveyor as to the following:

A. 100-year flood limits;

B. Wetlands;

C. Underground Storage Facilities;

D. Graves, Cemeteries, or Burial Grounds;

E. Hazardous Waste F. Underground Utilities

4. Date of Field Survey: 10 February - 15 March 2021

SURVEY MARKER TABLE

PIN NO. USMART PID MATERIAL NORTHING EASTING

NGS GAUGE AHV626 BRASS DISK 395040.42 2052972.04

41 AHV627 BRASS DISK 394986.37 2052980.89

42 AHV628 BRASS DISK 394986.37 2052986.30

43 AHV629 BRASS DISK 394985.02 2052986.45

LD-MON-3-5 AHV630 BRASS DISK 394959.71 2052975.21

44 AHV631 BRASS DISK 394946.56 2052990.60

45 AHV632 BRASS DISK 394945.25 2052990.75

46 AHV633 BRASS DISK 394906.79 2052994.90

47 AHV634 BRASS DISK 394905.48 2052995.02

48 AHV635 BRASS DISK 394867.06 2052999.17

49 AHV636 BRASS DISK 394865.67 2052999.32

50 AHV637 BRASS DISK 394827.25 2053003.44

51 AHV638 BRASS DISK 394825.87 2053003.60

52 AHV639 BRASS DISK 394787.08 2053007.78

53 AHV640 BRASS DISK 394785.70 2053007.90

LD-MON-3-1 AHV641 BRASS DISK 394746.44 2052952.85

LD-MON-3-2 AHV642 BRASS DISK 394750.89 2052997.61

54 AHV643 BRASS DISK 394747.49 2053012.02

55 AHV644 BRASS DISK 394746.15 2053012.14

56 AHV645 BRASS DISK 394677.05 2053019.56

LD-RATIO AHV624 ECM 394818.33 2052857.41

LD-MON D AHV625 ECM 395018.85 2052814.72

EDGE OF LOCKWALL

CAPE FEAR RIVER

RETAINING WALL

RETAINING WALL

ENTRANCE ROAD

CENTERLINE

EDGE OF ENTRANCE ROAD

ESPLANADE ENTRANCE

POWERLINE

BOAT LAUNCH

PARKING AREA

EX

IS

TI

N

G C

O N

D

IT

IO

N

S

V-101

LD

3_

EX

IS

TI

N

G _C

O N

D

IT

IO

N

S.

dw g

J.

C

AR

TE

R

E.

D

U N

LO

P

J.

M

AN

N

IN

G

J.

C

AR

TE

R

BORING WOH-FY21-SPT-04

N 395,006.00 E 2,052,956.00

BORING WOH-FY21-SPT-02

N 394,781.00

E 2,052,974.00

BORINGWOH-FY21-SPT-03

N 394,742.00 E 2,052,989.00

BORING WOH-FY21-SPT-01

N 394,737.00 E 2,052,956.00

EXISTING CHAIN LINK FENCE

TO BE REMOVED BY GOVERNMENT

PRIOR TO CONSTRUCTION

DROP INLET (TO BE REMOVED)

TREE

LEGEND

E E POWERLINE

CHAIN LINK FENCE

BORING

X X

POWER POLE

EXISTING CONCRETE DITCH C/L

EDGE OF CONCRETE ESPLANADE

40 40

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

XXX

XX

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E

E E

E

E E

E E

E

E E

E E

E

E E

E E

E

E E

E E

E

E

E

E E

E E

E

E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E E

E E E

E E

E E

E E E

E E

E E

E E E

E E

E E

E E E

E E

E E

E E E

E E

E E

E E E

E E

E E

E E E

E E

E E

E E E

E E

E E E

E E

E E

E E E

E E

E E

E E E

E E

E E

E E E

E E

E E

E E E

E E

E E

E E E

E E

E E

E E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E

PP

PP

PP

E E

E E

E E

E E

EE

EE

EE

E E

E E

EE

EE

E E

E E

D I

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

W

IL

LI

AM

O . H

U

SK

E

LO

C K

D

AM

E

SP

LA

N

AD

E R

EP

AI

R

IN

B

LA

D

EN

C O

U N

TY

, N

O R

TH

C

AR

O

LI

N

A

SHEET ID

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

W

IL

M

IN

G

TO

N D

IS

TR

IC

T

D

AR

LI

N G

TO

N

A

VE

N U

E W

IL

M

IN

G

TO

N

, N O

R

TH

C

AR

O

LI

N A

D R

AW

IN

G C

O D

E:

US Army Corps of Engineers

FI

LE

N

AM

E:

LD

-0 5-

W

2P M

B0

TB

D

AP

R

IL

"x

R

TA

S

ET

Feet 0 60 120

NOTES:

1. CONCRETE REPLACEMENT LIMITS SHALL BE FIELD VERIFIED BY THE

CONTRACTOR PRIOR TO SAW CUT OPERATIONS.

2. 5' X 5' CONCRETE PANELS SHALL BE REPLACED IN FULL SECTIONS NO

PARTIAL PANEL REMOVAL SHALL BE ALLOWED.

3. THE DROP INLET SHALL BE REMOVED A MINIMUM OF 5'-0" BELOW

FINISHED GRADE ELEVATION.

4. EXISTING 10" CMP AND REMAINING DROP INLET SHALL BE GROUTED

FULL AND ABANDONED IN-PLACE.

5. POWER LINES ON THE ESPLANADE SHALL BE REMOVED PRIOR TO

CONSTRUCTION BY THE GOVERNMENT WHERE REQUIRED.

6. SEE SHEET C-101 FOR FINAL SITE PLAN

CONCRETE REPLACEMENT LIMITS

POINT NORTHING EASTING

1 394914.34 2052945.29 2 394736.23 2052964.07 3 394734.53 2052947.97 4 394668.48 2052953.06 5 394672.73 2052955.90 6 394917.02 2052970.14

3 4

D

EM

O

LI

TI

O

N P

LA

N

C-001

LD

3_

D

EM

O

LI

TI

O

N _P

LA

N

.d w g

J.

C

AR

TE

R

E.

D

U N

LO

P

J.

M

AN

N

IN

G

J.

C

AR

TE

R

DROP INLET TO BE REMOVED

(SEE NOTES)2 PAN

EL M

IN

IM

U

M

2 PAN

EL M

IN

IM

U M

AREA TO BE REMOVED

AREA TO BE REMOVED

LEGEND

EDGE OF LOCKWALL

RETAINING WALL

RETAINING WALL

ENTRANCE ROAD

CENTERLINE

EDGE OF ENTRANCE ROAD

ESPLANADE ENTRANCE

POWERLINE

BOAT LAUNCH

PARKING AREA

EDGE OF CONCRETE ESPLANADE

EXISTING CONCRETE

DITCH CENTERLINE

40 40

E E

E E

E

E

E

E

E

E

E

E

E

X X

XXXXXXXXXXXXXXX

X X

E E

E

E

E E E E E E E E E E

E E

E E

E E

E E

E E

E

E

E

E E E

E E E

E E

E E

E E

E

PP

PP

PP

3 4

SF

SF

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

W

IL

LI

AM

O . H

U

SK

E

LO

C K

D

AM

E

SP

LA

N

AD

E R

EP

AI

R

IN

B

LA

D

EN

C O

U N

TY

, N

O R

TH

C

AR

O

LI

N

A

SHEET ID

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

W

IL

M

IN

G

TO

N D

IS

TR

IC

T

D

AR

LI

N G

TO

N

A

VE

N U

E W

IL

M

IN

G

TO

N

, N O

R

TH

C

AR

O

LI

N A

D R

AW

IN

G C

O D

E:

US Army Corps of Engineers

FI

LE

N

AM

E:

LD

-0 5-

W

2P M

B0

TB

D

AP

R

IL

"x

R

TA

S

ET

Feet 0 60 120

CONCRETE REPLACEMENT LIMITS

POINT NORTHING EASTING

1 394914.34 2052945.29 2 394736.23 2052964.07 3 394734.53 2052947.97 4 394668.48 2052953.06 5 394672.73 2052955.90 6 394917.02 2052970.14

NEW CONCRETE DITCH C/L POINTS

POINT NORTHING EASTING

START/CONNECTION 394915.68 2052957.71

PC 394732.28 2052977.05

PT 394725.24 2052975.36

PC 394704.26 2052963.17

PT 394695.35 2052960.47

END/OUTFALL 394669.45 2052962.85

NEW CONCRETE LIMTS

NEW CONCRETE DITCH C/L

NOTES:

1. CONCRETE REPLACEMENT LIMITS SHALL BE FIELD VERIFIED BY THE

CONTRACTOR PRIOR TO CONSTRUCTION TO ACHIEVE THE REQUIRED

SLOPES.

2. 5' X 5' CONCRETE PANELS SHALL BE REPLACED IN FULL SECTIONS. NO

PARTIAL PANEL REMOVAL SHALL BE ALLOWED.

3. MAXIMUM ALLOWABLE PANEL SIZE SHALL BE 5' X 5'.

4. NEW CONCRETE PANELS SHALL SLOPE TO DRAIN TO THE NEW

CONCRETE DITCH, SEE DETAIL 1 ON SHEET C-301.

5. SUBGRADE MATERIAL BELOW THE CONCRETE SHALL BE REMOVED

AND REPLACED WITH SATISFACTORY MATERIAL A MINIMUM OF 5'-0"

BELOW FINISHED GRADE.

NOTES:

1. CONCRETE DITCH C/L POINTS SHALL BE FIELD VERIFIED BY THE

CONTRACTOR PRIOR TO CONSTRUCTION TO ACHIEVE THE REQUIRED

SLOPES.

2. CONCRETE DITCH SHALL SLOPE AT A CONSTANT RATE TO DRAIN

TOWARDS THE EXISTING CONCRETE SPILLWAY.

3. NEW CONCRETE DITCH DIMENSIONS SHALL MATCH THE EXISTING

CONCRETE DITCH DIMENSIONS WITH REGARDS TO WIDTH, BOTTOM

RADIUS, THICKNESS, AND DEPTH.

GROUT INJECTION AREA,

SEE DETAIL 2/C-301

GROUT INJECTION AREA,

SEE DETAIL 2/C-301

FI

N

AL

S

IT

E

PL

AN

C-101

LD

3_

FI

N

AL

_S

IT

E_

PL

AN

.d w g

J.

C

AR

TE

R

E.

D

U N

LO

P

J.

M

AN

N

IN

G

J.

C

AR

TE

R

2 PAN

EL M

IN

IM

U M

2 PAN

EL M

IN

IM

U M

PA

N

EL

M

IN

IM

U

M

STOCKPILE AREA LIMITS

TEMPORARY SILT FENCE

GENERAL NOTES:

1. THERE ARE NO VEHICLE WEIGHT RESTRICTIONS FOR THE SITE.

2. SEE SHEET CE502 FOR STOCKPILE DETAILS.

3. SEE SHEET CE501 FOR TEMPORARY SILT FENCE DETAILS.

4. CHAIN LINK FENCING SHALL BE REMOVED BY THE GOVERNMENT PRIOR TO

CONSTRUCTION.

5. INSTALL SIGN 'BOAT RAMP CLOSED TO PUBLIC'

EDGE OF LOCKWALL

RETAINING WALL

RETAINING WALL

ENTRANCE ROAD

CENTERLINE

EDGE OF ENTRANCE ROAD

ESPLANADE ENTRANCE

POWERLINE

BOAT LAUNCH

PARKING AREA

TO BE USED

AS CONTRACTOR

STAGING AREA

EDGE OF CONCRETE ESPLANADE

EXISTING CONCRETE

DITCH CENTERLINE

SEE NOTE 5 OF

GENERAL NOTES

EXISTING CONCRETE

AND DITCHNEW CONCRETE

AND DITCH

NOTES:

1. CONCRETE PANELS ARE 5' X 5' AND SHALL BE REMOVED AND REPLACED WHERE REQUIRED.

2. CONCRETE ESPLANADE PANELS TO BE REMOVED SHALL BE SAWCUT ALONG THE PERIMETER OF THE CONCRETE REPLACEMENT LIMITS AT PANEL INTERFACES.

3. CONCRETE SHALL BE REPLACED WITH 6" THICK UN-REINFORCED 4500PSI CONCRETE, TO MATCH EXISTING.

4. CONCRETE SHALL BE FINISHED TO MATCH EXISTING SURFACE.

5. CONSTRUCTION JOINTS SHALL BE USED BETWEEN PANELS, NEW AND EXISTING PER THE SPECIFICATIONS.

6. CONCRETE ESPLANADE SHALL SLOPE TO THE NEW CONCRETE DITCH AT A CONSTANT RATE.

7. CONCRETE DITCH SHALL SLOPE TO THE EXISTING SPILLWAY AT A CONSTANT RATE.

8. FOUNDATION MATERIAL SHALL BE REMOVED, REPLACED, AND ADDED AT A MINIMUM OF 5'-0" TO MEET THE REQUIRED ELEVATIONS.

9. DRAWING IS NOT TO SCALE.

TYPICAL CONCRETE PANEL AND DITCH SECTION

SLOPE TO DITCHSLOPE TO DITCH

MATCH TO EXISTING PANEL

MATCH TO EXISTING PANEL

NEW 6" CONCRETE PAVING

EXISTING 6" CONCRETE PAVING

NOTES:

1. GROUT INJECTION HOLES SHALL BE SPACED 18" APART VERTICALLY OR PER THE MANUFACTURERS

RECOMMENDATIONS. CURRENT GOVERNMENT TOTAL GROUT VOLUME ESTIMATE IS 18 CUBIC FEET, THIS VOLUME

DOES NOT REFLECT THE VOLUME THAT MAY BE REQUIRED DURING GROUTING OPERATIONS.

2. GROUT INJECTION HOLES SHALL BE PLACED FROM THE TOP OF WALL TO THE WATER LINE. WATER ELEVATIONS VARY SIGNIFICANTLY WITH RAINFALL EVENTS. WATER ELEVATIONS SHALL BE REQUIRED TO RETURN TO NORMAL POOL ELEVATIONS BEFORE THE GROUT INJECTION DRILLING PROCESS BEGINS. NORMAL POOL ELEVATIONS ON THE

UPSTREAM SIDE ARE 30.1 (NAVD88) AND FOR THE DOWNSTREAM SIDE ARE 22.1 (NAVD88).

3. GROUT INJECTION HOLES SHALL BE DRILLED AT A 45 DEGREE ANGLE TO INTERSECT THE JOINT BEING GROUTED OR

PER MANUFACTURERS RECOMMENDATIONS.

4. SHALL THE GROUT INJECTION HOLE CONTACT REINFORCING STEEL DURING DRILLING, THE GROUT INJECTION HOLE SHALL BE RELOCATED NO MORE THAN 6" IN THE VERTICAL DIRECTION AND 3" IN THE HORIZONTAL DIRECTION

UNLESS OTHERWISE DIRECTED BY THE CONTRACTING OFFICER.

5. THE NUMBER OF GROUT INJECTION HOLES REQUIRED SHALL BE BASED ON THE NUMBER OF HOLES REQUIRED FOR THE SPACING REQUIRED FROM THE TOP OF WALL TO THE NORMAL POOL ELEVATIONS PROVIDED. THE DRAWING IS NOT TO SCALE AND THE NUMBER OF GROUT HOLES SHOWN ON THE DRAWING IS NOT REFLECTIVE OF THE ACTUAL

AMOUNT OF GROUT HOLES REQUIRED.

1.50'

3.

1.

WATER ELEVATION

CONCRETE RETAINING WALL

TO LOCK WALL JOINT CENTERLINE

GROUT INJECTION HOLE

CENTERLINE

GROUT INJECTION HOLE

CENTERLINE

TYPICAL GROUT INJECTION HOLE LAYOUT

REMOVE AND REPLACE

WITH SATISFACTORY MATERIAL

TO A DEPTH OF 5'-0"

EXISTING SUBGRADE

MATERIAL

C-301

C-301

TYP.

1.00'

TYP.

EXISTING REINFORCED

CONCRETE LOCK WALL

EXISTING REINFORCED

CONCRETE RETAINING WALL

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

W

IL

LI

AM

O . H

U

SK

E

LO

C K

D

AM

E

SP

LA

N

AD

E R

EP

AI

R

IN

B

LA

D

EN

C O

U N

TY

, N

O R

TH

C

AR

O

LI

N

A

SHEET ID

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

W

IL

M

IN

G

TO

N D

IS

TR

IC

T

D

AR

LI

N G

TO

N

A

VE

N U

E W

IL

M

IN

G

TO

N

, N O

R

TH

C

AR

O

LI

N A

D R

AW

IN

G C

O D

E:

US Army Corps of Engineers

FI

LE

N

AM

E:

LD

-0 5-

W

2P M

B0

TB

D

AP

R

IL

"x

R

TA

S

ET

TY

PI

C

AL

D

ET

AI

LS

C-301

C

1.

dw g

J.

C

AR

TE

R

E.

D

U N

LO

P

J.

M

AN

N

IN

G

J.

C

AR

TE

R

SEEDING AND MULCHING

IMMEDIATELY AFTER SEEDING, FIRM ENTIRE AREA EXCEPT FOR SLOPES IN EXCESS OF

3 TO 1 WITH ROLLER NOT EXCEEDING 90 POUNDS FOR EACH FOOT OF ROLLER WIDTH.

IF SEEDING IS PERFORMED WITH CULTIPACKER-TYPE SEEDER OR HYDROSEEDING,

ROLLING MAY BE ELIMINATED.

TEMPORARY SEED SPECIES FOR SURFACE EROSION CONTROL OR OVER SEEDING SHALL

BE AS FOLLOWS:

PLANTING PERIOD COMMON NAME

15 MAR - 14 SEP BROWNTOP, PROSO OR GERMAN

(FOXTAIL) MILLET 50

15 SEP - 14 JAN RYE GRAIN 112

15 JAN - 14 MAR SPRING OATS 128

PERMANENT SEED MIXTURE SHALL BE AS FOLLOWS:

PLANTING PERIOD COMMON NAME

1 FEB - 30 APR PENSACOLA BAHIAGRASS

COMMON OR KOBE LESPEDEZA 25

SPRING OATS 32

1 MAY - 31 AUG COMMON OR KOBE LESPEDEZA 25

BROWNTOP PROSO OR GERMAN

(FOXTAIL) MILLET 30

1 SEP - 31 JAN COMMON OR KOBE LESPEDEZA 40

RYE (GRAIN) 56

ADDITIONAL PERMANENT SEED SPECIES SHALL BE PLACED AS FOLLOWS:

PLANTING PERIOD COMMON NAME

1 NOV - 28 FEB COMMON BERMUDAGRASS 20

(UNHULLED)

1 MAR - 31 JUL COMMON BERMUDAGRASS 12

(HULLED)

FERTILIZER SHALL BE COMMERCIAL GRADE, FREE FLOWING, UNIFORMLY COMPOSED.

FERTILIZER SHALL BE BALANCED WITH THE INCLUSION OF TRACE MINERALS AND

MICRO NUTRIENTS.

SYNTHETIC, GRANULAR CONTROLLED RELEASE FERTILIZER CONTAINING

THE FOLLOWING MINIMUM PERCENTAGES, BY WEIGHT OF PLANT FOOD NUTRIENTS:

10 PERCENT AVAILABLE NITROGEN

10 PERCENT AVAILABLE PHOSPHORUS

10 PERCENT AVAILABLE POTASSIUM

CONTROLLED RELEASE FERTILIZER, TO USE WITH HYDROSEEDING AND COMPOSED OF PILLS

COATED WITH PLASTIC RESIN TO PROVIDE A CONTINUOUS RELEASE OF NUTRIENTS FOR AT

LEAST 6 MONTHS AND CONTAINING THE FOLLOWING MINIMUM PERCENTAGES, BY WEIGHT, OF

PLANT FOOD NUTRIENTS:

10 PERCENT AVAILABLE NITROGEN

10 PERCENT AVAILABLE PHOSPHORUS

10 PERCENT AVAILABLE POTASSIUM

MINIMUM LBS

PER ACRE

MINIMUM LBS

PER ACRE

MINIMUM LBS

PER ACRE

VEGETATIVE STABILIZATION - SEEDING

TEMPORARY SEED

PERMANENT SEED

FERTILIZER

HAY OR STRAW MULCH

STRAW

HAY

MECHANICAL ANCHOR

WOOD CELLULOSE FIBER

SOIL PREPARATION

SEED PERMANENT GROUND COVER FOR ALL DISTURBED AREAS WITH 3H : 1V SLOPES OR

FLATTER WITHIN 14 CALENDAR DAYS AFTER COMPLETION OF CONSTRUCTION AND ALL

DISTURBED AREAS WITH SLOPES STEEPER THAN 3H : 1V WITHIN 7 CALENDAR DAYS AFTER

COMPLETION OF CONSTRUCTION.

TEMPORARY SILT FENCE (TSF) DETAIL

WIRE FABRIC

GROUND LINE

3' -0

" M

AX

2' -0

" M

IN

4"

8"

COMPACTED FILL

2' MIN' (TYP)

STEEL POST

MIN. 12.5 GA.

INTERMEDIATE

WIRES

MIN. 10 GA.

TOP & BOTTOM

WIRES

FILTER

FABRIC

" F

IL

TE

R

FA

BR

IC

36" MIN WIDTH

FILTER FABRIC

(8' MAX. STANDARD STRENGTH FABRIC WITH WIRE FENCE)

MIN. 12.5 GA.

VERTICAL WIRES

STEEL

POST

(TYP)

N.T.S.

VARIES AS DIRECTED BY THE CONTRACTING OFFICER

OR HIS/HER DESIGNATED REPRESENTATIVE

MULCH SHALL BE FREE FROM NOXIOUS WEEDS, MOLD, AND OTHER

DELETERIOUS MATERIALS. MULCH MATERIALS SHALL BE NATIVE TO

THE REGION. HAY OR STRAW MULCH SHALL BE SPREAD UNIFORMLY

AT THE RATE OF 2 TONS PER ACRE. MULCH SHALL BE SPREAD BY

HAND, BLOWER-TYPE MULCH SPREADER, OR OTHER APPROVED

METHOD. MULCHING SHALL BE STARTED ON THE WINDWARD SIDE

OF RELATIVELY FLAT AREAS OR ON THE UPPER PART OF STEEP

SLOPES, AND CONTINUED UNIFORMLY UNTIL THE AREA IS COVERED.

THE MULCH SHALL NOT BE BUNCHED OR CLUMPED. SUNLIGHT SHALL

NOT BE COMPLETELY EXCLUDED FROM PENETRATING TO THE GROUND

SURFACE. ALL AREAS INSTALLED WITH SEED SHALL BE MULCHED ON

THE SAME DAY AS THE SEEDING. MULCH SHALL BE ANCHORED

IMMEDIATELY FOLLOWING SPREADING.

STALKS FROM OATS, WHEAT, RYE, BARLEY, OR RICE. FURNISH IN

AIR-DRY CONDITION AND OF PROPER CONSISTENCY FOR PLACING

WITH COMMERCIAL MULCH BLOWING EQUIPMENT. STRAW SHALL

CONTAIN NO FERTILE SEED.

HAY SHALL BE NATIVE HAY, SUDAN-GRASS HAY, BROOMSEDGE HAY,

OR OTHER HERBACEOUS MOWING. AIR-DRY CONDITION AND OF

PROPER CONSISTENCY FOR PLACING WITH COMMERCIAL MULCH

BLOWING EQUIPMENT. HAY SHALL BE STERILE, CONTAINING NO

FERTILE SEED.

MECHANICAL ANCHOR SHALL BE A V-TYPE-WHEEL LAND PACKER;

A SCALLOPED-DISK LAND PACKER DESIGNED TO FORCE MULCH INTO

THE SOIL SURFACE; OR OTHER SUITABLE EQUIPMENT.

WOOD CELLULOSE FIBER SHALL BE APPLIED AS PART OF THE

HYDROSEEDING OPERATION. THE MULCH SHALL BE MIXED AND

APPLIED IN ACCORDANCE WITH THE MANUFACTURER'S

RECOMMENDATIONS.

SOIL ON SLOPES UP TO A MAXIMUM 3-HORIZONTAL-TO-1-VERTICAL

SHALL BE TILLED TO A MINIMUM 4 INCH DEPTH. ON SLOPES BETWEEN

3-HORIZONTAL-TO-1-VERTICAL AND 1-HORIZONTAL-TO-1-, THE SOIL

SHALL BE TILLED TO A MINIMUM 2 INCH DEPTH BY SCARIFYING

WITH HEAVY RAKES, SPIKED TOOTH HARROW, CHISEL PLOWS, OR

SIMILAR IMPLEMENTS, OR OTHER SIMILAR METHOD. ROTOTILLERS

SHALL BE USED WHERE SOIL CONDITIONS AND LENGTH OF SLOPE

PERMIT. AREAS COMPACTED BY CONSTRUCTION OPERATIONS SHALL

BE COMPLETELY PULVERIZED BY TILLAGE. THE FERTILIZER MAY BE

APPLIED DURING THIS PROCEDURE.

SOIL EROSION AND SEDIMENT CONTROL MEASURES

1. ALL EROSION AND SEDIMENTATION CONTROL MEASURES NOTED SHALL BE INSTALLED PRIOR TO START OF CONSTRUCTION AND

SHALL REMAIN IN EFFECT AND BE MAINTAINED THROUGHOUT THE PERIOD OF CONSTRUCTION.

2. SEDIMENTATION FROM WORK ON THIS SITE SHALL BE CONTAINED ON THE SITE AND SHALL NOT BE ALLOWED TO COLLECT ON ANY

OFFSITE AREA OR IN WATERWAYS.

3. CONTRACTOR SHALL APPLY TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES AS SHOWN ON THESE PLANS OR AS DIRECTED BY THE CONTRACTING OFFICER OR HIS/HER DESIGNATED REPRESENTATIVE. CONTRACTOR SHALL REMOVE TEMPORARY MEASURES AS SOON AS PERMANENT STABILIZATION OF SLOPES, DITCHES, AND OTHER EARTH CHANGES HAVE BEEN ACCOMPLISHED.

4. DAILY INSPECTION SHALL BE MADE BY THE CONTRACTOR TO DETERMINE THE EFFECTIVENESS OF EROSION CONTROL MEASURES, AND

ANY NECESSARY REPAIRS SHALL BE MADE WITHOUT DELAY.

5. PERMANENT SOIL EROSION CONTROL MEASURES FOR ANY DISTURBED LAND AREA SHALL BE STABLIZIED AS SOON AS POSSIBLE. WHEN IT IS NOT POSSIBLE TO PERMANENTLY STABILIZE A DISTURBED AREA IMMEDIATELY AFTER COMPLETION OF GRADING WORK, TEMPORARY SOIL EROSION CONTROL MEASURES SHALL BE IMPLEMENTED IMMEDIATELY. ALL TEMPORARY SOIL EROSION CONTROL MEASURES SHALL

BE MAINTAINED UNTIL PERMANENT SOIL EROSION CONTROL MEASURES ARE IMPLEMENTED.

6. CONTRACTOR SHALL PROVIDE PERMANENT GROUND COVER FOR ALL DISTURBED AREAS WITH 3H:1V SLOPES OR FLATTER WITHIN 14 CALENDAR DAYS FOLLOWING THE COMPLETION OF CONSTRUCTION AND ALL DISTURBED AREAS WITH SLOPES STEEPER THAN 3H:1V WITHIN 7 CALENDAR DAYS

AFTER COMPLETION OF CONSTRUCTION.

TEMPORARY SILT FENCE NOTES:

1. NEW TEMPORARY SILT FENCE SHALL BE INSTALLED AT LOCATIONS SHOWN ON THE

PLANS.

2. WIRE FABRIC SHALL BE A MINIMUM OF 32" IN WIDTH AND SHALL HAVE A MINIMUM OF 6 LINE WIRES

WITH 12" STAY SPACING.

3. FILTER FABRIC SHALL HAVE A MINIMUM OF 36" WIDTH. FILTER FABRIC SHALL BE FASTENED

ADEQUATELY TO THE FENCE FABRIC AS DIRECTED BY THE CONTRACTING OFFICER.

4. STEEL POSTS SHALL BE 5 FEET (MIN) IN HEIGHT AND SHALL BE OF THE SELF-FASTENER ANGLE

STEEL TYPE.

5. THE CONTRACTOR SHALL INSPECT TEMPORARY SILT FENCE AT LEAST ONCE EVERY 7 DAYS AND AFTER ANY SIGNIFICANT STORM THAT PRODUCES 0.5 INCHES OR MORE RAINFALL AT THE SITE

AND MAKE ANY REQUIRED REPAIRS IMMEDIATELY. REMOVE SEDIMENT DEPOSITS AS NECESSARY

TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON

THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT.

6. THE CONTRACTOR SHALL PERFORM ALL WORK IN SUCH A MANNER THAT STATE WATER QUALITY

STANDARDS OUTSIDE OF THE CONSTRUCTION AREA ARE NOT VIOLATED. ALL EROSION AND

SEDIMENT CONTROL MEASURES SHALL BE IN ACCORDANCE WITH THE NORTH CAROLINA EROSION

AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL.

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

W

IL

LI

AM

O . H

U

SK

E

LO

C K

D

AM

E

SP

LA

N

AD

E R

EP

AI

R

IN

B

LA

D

EN

C O

U N

TY

, N

O R

TH

C

AR

O

LI

N

A

SHEET ID

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

W

IL

M

IN

G

TO

N D

IS

TR

IC

T

D

AR

LI

N G

TO

N

A

VE

N U

E W

IL

M

IN

G

TO

N

, N O

R

TH

C

AR

O

LI

N A

D R

AW

IN

G C

O D

E:

US Army Corps of Engineers

FI

LE

N

AM

E:

LD

-0 5-

W

2P M

B0

TB

D

AP

R

IL

"x

R

TA

S

ET

ER

O

SI

O

N

S

ED

IM

EN

T C

O N

TR

O

L D

ET

AI

LS

CE501

FY

_C ap eF ea r_ C

E5

_S

EC

P_ D et ai ls 1.

dw g

J.

C

AR

TE

R

E.

D

U N

LO

P

J.

M

AN

N

IN

G

J.

C

AR

NTSCE502

TEMPORARY STOCKPILE AREA

3:1

3:1

SOIL/SEDIMENT

STOCKPILE AREA

ORIGINAL GROUND SURFACE

10"

(TYP.) SILT FENCE

(SEE DETAIL 1

SHEET CE501)

TEMPORARY STOCKPILE DETAIL

TEMPORARY STOCKPILE - GENERAL NOTES

1. SILT FENCE TO EXTEND AROUND ENTIRE PERIMETER OF STOCKPILE, OR IF STOCKPILE AREA IS LOCATED ON/NEAR A SLOPE THE SILT FENCE

IS TO EXTEND ALONG CONTOURS OF THE DOWN-GRADIENT AREA.

2. IF STOCKPILE IS TO REMAIN FOR MORE THAN 14 DAYS, TEMPORARY STABILIZATION MEASURES MUST BE IMPLEMENTED.

3. SILT FENCE SHALL BE MAINTAINED UNTIL STOCKPILE AREA HAS EITHER BEEN REMOVED OR PERMANENTLY STABILIZED.

4. THE KEY TO FUNCTIONAL TEMPORARY STOCKPILE AREAS IS WEEKLY INSPECTIONS, ROUTINE MAINTENANCE, AND REGULAR SEDIMENT

REMOVAL.

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

W

IL

LI

AM

O . H

U

SK

E

LO

C K

D

AM

E

SP

LA

N

AD

E R

EP

AI

R

IN

B

LA

D

EN

C O

U N

TY

, N

O R

TH

C

AR

O

LI

N

A

SHEET ID

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

W

IL

M

IN

G

TO

N D

IS

TR

IC

T

D

AR

LI

N G

TO

N

A

VE

N U

E W

IL

M

IN

G

TO

N

, N O

R

TH

C

AR

O

LI

N A

D R

AW

IN

G C

O D

E:

US Army Corps of Engineers

FI

LE

N

AM

E:

LD

-0 5-

W

2P M

B0

TB

D

AP

R

IL

"x

R

TA

S

ET

TE

M

PO

R

AR

Y

ST

O

C

KP

IL

E

D

ET

AI

L

CE502

EI

_C ap eF ea r_ C

E5

_S

EC

P_ D et ai ls 2.

dw g

J.

C

AR

TE

R

E.

D

U N

LO

P

J.

M

AN

N

IN

G

J.

C

AR

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

W

IL

LI

AM

O . H

U

SK

E

LO

C K

D

AM

E

SP

LA

N

AD

E R

EP

AI

R

IN

B

LA

D

EN

C O

U N

TY

, N

O R

TH

C

AR

O

LI

N

A

SHEET ID

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

W

IL

M

IN

G

TO

N D

IS

TR

IC

T

D

AR

LI

N G

TO

N

A

VE

N U

E W

IL

M

IN

G

TO

N

, N O

R

TH

C

AR

O

LI

N A

D R

AW

IN

G C

O D

E:

US Army Corps of Engineers

FI

LE

N

AM

E:

LD

-0 5-

W

2P M

B0

TB

D

AP

R

IL

"x

R

TA

S

ET

R

EF

ER

EN

C E

D R

AW

IN

G

R-001

R

1.

dw g

J.

C

AR

TE

R

E.

D

U N

LO

P

J.

M

AN

N

IN

G

J.

C

AR

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

W

IL

LI

AM

O . H

U

SK

E

LO

C K

D

AM

E

SP

LA

N

AD

E R

EP

AI

R

IN

B

LA

D

EN

C O

U N

TY

, N

O R

TH

C

AR

O

LI

N

A

SHEET ID

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

W

IL

M

IN

G

TO

N D

IS

TR

IC

T

D

AR

LI

N G

TO

N

A

VE

N U

E W

IL

M

IN

G

TO

N

, N O

R

TH

C

AR

O

LI

N A

D R

AW

IN

G C

O D

E:

US Army Corps of Engineers

FI

LE

N

AM

E:

LD

-0 5-

W

2P M

B0

TB

D

AP

R

IL

"x

R

TA

S

ET

R

EF

ER

EN

C E

D R

AW

IN

G

R-002

R

1.

dw g

J.

C

AR

TE

R

E.

D

U N

LO

P

J.

M

AN

N

IN

G

J.

C

AR

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

W

IL

LI

AM

O . H

U

SK

E

LO

C K

D

AM

E

SP

LA

N

AD

E R

EP

AI

R

IN

B

LA

D

EN

C O

U N

TY

, N

O R

TH

C

AR

O

LI

N

A

SHEET ID

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

W

IL

M

IN

G

TO

N D

IS

TR

IC

T

D

AR

LI

N G

TO

N

A

VE

N U

E W

IL

M

IN

G

TO

N

, N O

R

TH

C

AR

O

LI

N A

D R

AW

IN

G C

O D

E:

US Army Corps of Engineers

FI

LE

N

AM

E:

LD

-0 5-

W

2P M

B0

TB

D

AP

R

IL

"x

R

TA

S

ET

R

EF

ER

EN

C E

D R

AW

IN

G

R-003

R

1.

dw g

J.

C

AR

TE

R

E.

D

U N

LO

P

J.

M

AN

N

IN

G

J.

C

AR

G-000 COVER SHEET
G-001 DRAWING INDEX
V-101 EXISTING CONDITIONS
C-001 DEMOLITION PLAN
C-101 FINAL SITE PLAN
C-301 TYPICAL SECTIONS
CE501 EROSION & SEDIMENT CONTROL DETAILS
CE502 TEMPORARY STOCKPILE DETAIL
Reference Drawings
R001 Detail At Lock Site
R002 W.O. Huske Lock and Dam Stability Analysis
R003 W.O. Huske Lock and Dam Miscellaneous Measurements

File details come from the government source that posted it. Updated .