A21 - (C) Contractor Quote Sheet.pdf

PDF 650 KB Posted

Attached to
50 - Ton Truck Mounted Crane Rental
Solicitation number
W912PM22Q0022
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Quote Sheet for Crane Rental Services at Falls Lakes & B. Everett Jordan Dam and Lake

Contractor/Offeror:

Total Price:

Discount Terms:

The Contractor is required to sign this document and return one (1) copy together with your quote and technical package, to the issuing Office. The Contractor agrees to furnish and deliver all items set forth or otherwise identified above and on any addition sheets subject to the Terms and Conditions specified herein.

Signature of Offeror/Contractor:

Name and Title of Signer (Type or Print)

Date Signed:

Contractor Quote Sheet for Crane Rental Services at Falls Lakes & B. Everett Jordan Dam and Lake

ITEM SUPPLIES/SERVICES UNIT UNIT PRICE AMOUNT

Falls Lake & B. Everett Jordan Dam and Lake, Raleigh & Moncure, NC

The Contractor shall furnish all labor, materials, supplies, and services, to provide Crane Rental Services at the Falls Lake Dam for the removal/install/loading/unloading of four (4) dam gates, the removal/install of Cylinders and Stems, and the installation of Stop Logs. Contractor shall also furnish all labor, materials, supplies, and services, to provide Crane Rental Services at the B. Everett Jordan Dam and Lake for the installation of a cylinder and ladders.

THIS ITEM IS NOT PRICED.

CLIN# DESCRIPTION QTY UNIT UNIT COST TOTAL COST

50-TON Truck Mounted Crane Service (Falls

Lake) 29 days

Labor for Crane Operator, Straight Time (Falls

Lake) 168 hours

0003 Labor for Crane Operator, Overtime (Falls Lake) 192 hours

Per Diem (estimate based on GSA per diem daily rates for Lodging & Meals) (Falls Lake) 29 days

0005 50-TON Truck Mounted Crane Service (BEJ) 7 days

0006 Labor for Crane Operator, Straight Time (BEJ) 40 hours

0007 Labor for Crane Operator, Overtime (BEJ) 44 hours

Per Diem (estimate based on GSA per diem daily rates for Lodging & Meals) (BEJ) 7 days

0009 Critical Lift Plan (CLP) (Falls Lake) 2 each

0010 Critical Lift Plan (CLP) (BEJ) 1 each

TOTAL QUOTE =

File details come from the government source that posted it. Updated .