This document includes a bid schedule for construction services for emergency repairs at Cameron Prairie National Wildlife Refuge in Bell City, Louisiana. The schedule lists one lump sum item for construction of a heavy equipment storage building at the refuge. Bidders are instructed to provide pricing and cost element break downs for the listed item and any related sub items in enough detail to allow for adequate price analysis, including labor, materials, equipment, subcontractor quotes, overhead, bonding and profit.

The related federal contract opportunity is a solicitation issued by the Department of the Interior Fish and Wildlife Service for repairs and maintenance work at the Cameron Prairie National Wildlife Refuge maintenance shop in Louisiana. No further details are provided on required products or services, response dates, or other bid requirements.

View the file

Other files

File Type Posted
Sol_140F0121R0034.pdf PDF
General_Decision.pdf PDF
A04_Statement_of_Work_(SOW).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION B -- SUPPLIES OR SERVICES AND PRICES

B.1 SECTION B - BID SCHEDULE MARCH 2021

SCHEDULE OF ITEMS

Construction Services for Emergency Repairs Project at Cameron Prairie National Wildlife Refuge, Bell City, LA.

Item Number Description Unit Amount

001 (Bid Item 1) Lump Sum $ Heavy Equipment Storage Bldg Cameron Prairie NWR

Note: Instructions for submission of cost or pricing data or information other than cost or pricing data (Reference Solicitation Section L., 52.215-20)

Note: Provide pricing and cost element break downs for each of the items listed, down to the sub item level in the Scope of Work, in enough detail to allow adequate price analysis. This could include, but is not limited to, labor, materials, equipment, competitive subcontractor quotes, overhead, bonding and profit.