A21 ATTACHMENT 1-CHECK LIST FOR PM.pdf
PDF 110 KB Posted
- Attached to
- PM and On-Call Repair of SCADA System
- Solicitation number
- W91QVN-21-R-0023
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A21 W91QVN-21-R-0023.pdf | ||
| A21 ATTACHMENT 2-LOCATION OF MAP.ppt | PPT presentation |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITEM No EQUIPMENT CHECK POINT
1. Ehternet communication check
2. HMI operation check
1. Tx, Rx LED check
2. Functional test for RDLB
3. Connection status check
4. Power voltage check
5. Signal DB check
6. Tightness connection of Terminal Block
1. Power voltage check
2. Controller LED check
3. Communication Module check
4. Program operation check
1. Power voltage check
2. Controller LED check
3. Communication Module check
4. Program operation check
5. Analog signal check
6. Digital signal check
7. Tightness connection of Terminal Block
1. Valve operation check
2. Tightness connection of Terminal Block
1. Visual examination
2. Level calibration
3. Tightness connection of Terminal Block
1. Power voltage check
2. Controller LED check
3. Communication Module check
4. Program operation check
5. Analog signal check
6. Digital signal check
7. Tightness connection of Terminal Block
CHECK ITEMS FOR INSPECTION, TESTING, PREVENTIVE MAINTENANCE OF SCADA SYSTEM
BY QUARTERLY
FOR THE WATER TREATMENT PLANT AT CAMP CASEY
Remote Terminal Units (RTU) at 4ea Pump Houses
Water Level for Storage Tank, Sand Filter, Clear Well Tank & Raw Water Tank
Master Terminal
Electric Actuator Valve for Sand Filter
Filter Control Console (FCC) - 4ea
Server
Modem
TECHNICAL EXHIBIT #1-1
1. Power voltage check
2. Controller LED check
3. Communication Module check
4. Program operation check
5. Analog signal check
6. Tightness connection of Terminal Block
Remote Terminal Units (RTU) at 4ea Storage Tanks
ITEM No EQUIPMENT CHECK POINT
1. Ehternet communication check
2. HMI operation check
1. Ehternet communication check
2. HMI operation check
1. Power voltage check
2. Controller LED check
3. Communication Module check
4. Pump operation check
5. Program operation check
6. Analog signal check
7. Tightness connection of Terminal Block
1. Valve operation check
2. Tightness connection of Terminal Block
1. Visual examination
2. Level calibration
3. Tightness connection of Terminal Block
1. Power voltage check
2. Controller LED check
3. Communication Module check
4. Program operation check
5. Analog signal check
6. Digital signal check
7. Tightness connection of Terminal Block
1. Power voltage check
2. Controller LED check
3. Communication Module check
4. Program operation check
5. Analog signal check
6. Tightness connection of Terminal Block
1. Power voltage check
2. Controller LED check
3. Communication Module check
1 Server for Membrane + Sand Filter System
TECHNICAL EXHIBIT #1-1
CHECK ITEMS FOR INSPECTION, TESTING, PREVENTIVE MAINTENANCE OF SCADA SYSTEM
BY QUARTERLY
FOR THE WATER TREATMENT PLANT AT RODRIGUEZ AREA
2 Server for Sand Filter System
Remote Terminal Unit (RTU) for Membrane
Filtering System
4 Neumatic Valve
Remote Terminal Units (RTU) for 1ea City
Water Level for Storage Tank & Clear Well
Tank
Remote Terminal Units (RTU) for 3ea Pump
Rooms & 1ea Storage Tank
Remote Terminal Units (RTU) for 5ea Water
Wells
4. Program operation check
5. Analog signal check
6. Tightness connection of Terminal Block
1. Power voltage check
2. Controller LED check
3. Communication Module check
4. Program operation check
5. Analog signal check
6. Tightness connection of Terminal Block
Water Valve)
Remote Terminal Units (RTU) for 1ea Sand
Filter