A2_-_Statement_of_Work_-_Option_1_-_Replace_septic_sys_Ft__Raleigh_Q1445.pdf
PDF 3 MB Posted
- Attached to
- SEPTIC SYS. Q1443, Q1445, Q1447 Federal contract opportunity
- Solicitation number
- 140P5324R0046
About this file
This document is a Statement of Work (SOW) for replacing the septic tank and drainfield at Fort Raleigh Quarters 1445 at Cape Hatteras National Seashore in Manteo, North Carolina.
The SOW details the requirement to replace the existing septic system, including the 750-gallon concrete septic tank and drainfield. The new system must meet the current North Carolina Administrative Code requirements and include a 1,000-gallon concrete septic tank, a distribution tank, and a minimum of 150 linear feet of new infiltrator drain lines. Key tasks include demolishing the existing system, removing tree roots, installing the new system components, and seeding the disturbed areas. The contractor is responsible for submitting a work schedule, safety plan, product data, and qualifications prior to the pre-construction conference. No government-furnished property will be provided, but the contractor can use the site's existing utilities. The work must be completed within the hours of 7 AM to 5 PM, Monday through Friday.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sign_in_Sheet_0002.pdf | ||
| CAHA_326609B_SOW_Q1445_Revised_8_28_24_0002.pdf | ||
| CAHA_326609A_SOW_Q1443_REV_-_8_28_24_0002.pdf | ||
| Sol_140P5324R0046_Amd_0002.pdf | ||
| CAHA_326609C_SOW_Q1447_Revised_8_28_2024_0002.pdf | ||
| Questions_and_Answers_0002.pdf | ||
| DOL_Wage_Determination_0001.pdf | ||
| Sol_140P5324R0046_Amd_0001.pdf | ||
| DOL_Wage_Determination.pdf | ||
| A1_-_Statement_of_Work_-_Replace_septic_sys_Ft__Raleigh_Q1443.pdf | ||
| Construction_Contract_Administration.docx | DOCX document | |
| Sol_140P5324R0046.pdf | ||
| A3_-_Statement_of_Work_-_Option_2_-_Replace_septic_sys_Ft__Raleigh_Q1447.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Replace Septic Tank and Drainfield at Ft Raleigh Quarters 1445 Page 1
CAPE HATTERAS NATIONAL SEASHORE
Fort Raleigh
Manteo, North Carolina
STATEMENT OF WORK:
Replace Septic Tank and Drainfield at Ft Raleigh Quarters 1445
NATIONAL PARK SERVICE
Region 2
Replace Septic Tank and Drainfield at Ft Raleigh Quarters 1445 Page 2
CAPE HATTERAS NATIONAL SEASHORE
Outer Banks Group
Statement of Work
Replace Septic Tank and Drainfield at Ft Raleigh Quarters 1445
1.0 INTRODUCTION
The National Park Service (NPS) Cape Hatteras National Seashore (CAHA) has a requirement to replace the septic tank and drainfield at Quarters 1445 on Fort Raleigh National Historic Site
(FORA).
2.0 CONSTRUCTION SITE LOCATION
The address for the project site is 1445 Pear Pad Rd Manteo, NC 29754.
3.0 BACKGROUND AND EXISTING CONDITIONS
The quarters at 1445 Pear Pad Rd in Manteo, NC is a 3 bedroom, single family house. The existing wastewater system consists of a tank approximately 750 gal and drainfield measuring approximately 20 ft wide and 35 ft long. The tank is located approx. 50 ft from the house. The drain line between the house and the tank is expected to be cast iron pipe in portions and PVC pipe in recently repaired sections. The drainfield in a traditional gravity system with gravel trench and perforated plastic pipe. The system is past its useful life, does not properly drain, and has been encroached by tree and other vegetation roots. Sewage is being pumped periodically from the septic tank to allow limited usage of the quarters.
The water service is on the east side of the house near Pear Pad Rd. The electrical and telecommunications services for the house are located on the west side behind the house and is buried below ground. The electrical distribution and service to the house are within the project site.
The site was examined according to North Carolina Administrative Code Title 15A Chapter 18
Environmental Health Subchapter 18E Sanitation - Sewage Treatment and Disposal Systems
(15A NCAC 18E). Specifically, the topography, landscape, soil characteristics, soil wetness condition and water table depth, soil depth and restrictive horizons, daily flow rate, and setbacks for the location of tank and drainfield.
Consultation with the Dare County Public Health On Site Water Protection Branch provided helpful information on the soil type in the Housing area as a Sandy Loan. A percolation test was not conducted on site due to the sandy nature of the soil. A maximum Long Term Acceptance
Rate of 0.8 is allowable for the drainfield sizing calculations, depending on the type of drainfield installed.
Replace Septic Tank and Drainfield at Ft Raleigh Quarters 1445 Page 3
Figure 1: Vicinity map of housing along Pear Pad Rd on Fort Raleigh.
4.0 SCOPE OF WORK
Replace the septic system with a new septic system meeting the most current version of 15A
NCAC Subchapter 18E and International Building Code for North Carolina. A qualified installer with a State approved license shall install the new system.
1. Task 1: Submit Product Data for materials to be used on this project.
2. Task 2: Locate and mark existing utilities within the limits of construction and access route including at a minimum:
a. Electrical
b. Communications
c. Septic
3. Task 3: Demo existing septic system
a. Demo 750 gal concrete septic tank and distribution tank.
b. Demo existing drainfield
c. Cut and remove the existing drain line from the house to the septic tank approximately 10 ft from the house (see attached drawings). Avoid the underground electric line.
d. Protect existing drainline for reconnection to the new tank.
4. Completely remove one existing full size oak tree (approx 60 ft tall) including the stump and roots extending into the new drainfield location. Roots from other trees which are identified on the attached sketch to remain but which extend into the footprint of the drainfield shall be cut within the perimeter of the proposed drainfield.
Replace Septic Tank and Drainfield at Ft Raleigh Quarters 1445 Page 4
5. Install construction fence around the project site and tree protection fence around existing trees within the project area which are to remain after work is complete. Tree protection fence shall be installed at the drip line of the branches.
6. Provide new 1,000 gallon concrete septic tank. Locate new tank approximately 10 ft from the house. (See attached sketch of proposed layout of new drainfield).
a. Connect the existing drain line from the house to the new septic tank with waterproof connection.
b. Provide properly sealed joints and connections from the existing drain pipes to new sections of pipe which seal to the new septic tank. Use schedule 40 PVC or approved equal material.
7. The new 1,000 gal septic tank include at a minimum:
a. Water tight joints
b. Concrete baffles
c. Effluent filter
d. Access opening less than 18 inches from the end of the tank to visually see the inflow pipe.
e. Adequate opening less than 12 inches from the effluent filter to be able to visually see and physically reach the effluent filter without entering the tank.
f. Access opening to visually see the concrete baffle.
g. Provide Concrete lids on the concrete septic tank with type 316 stainless steel handles.
h. HDPE risers and riser lids which extend a minimum of 12 inches above grade.
Riser lids shall be locking or mechanically sealed.
8. Provide new distribution tank and infiltrator drainfield. Drainfield shall be a minimum of
150 LF of new drain lines.
a. Remove roots within the drainfield trench footprint. Roots larger than 1 inch in diameter shall be pulled back to 5 ft away from the trench and cut and removed.
b. Remove unsuitable soil from new trenches (approximately 10 cy). Unsuitable soil may be reused to backfill existing tank excavation, or spread on site to smooth out ruts. Replace unsuitable soil with new suitable soil within the drainfield trenches.
c. Provide 36 in wide infiltrator type septic drainfield sections similar to Infiltrator
Water Technologies Quick4 Equalizer 36 which provide a minimum overall length of 150 LF of infiltration drain lines. Low profile sections with lower capacity are not acceptable.
d. Install chambers according to manufacturer’s installation instructions. Provide filter cloth above infiltrator sections according to the manufacturer’s instructions for the brand name utilized.
9. Provide seeding to the disturbed area, including demolished drainfield, new drainfield, and ruts or other disturbance created by construction. Continue to water the grass until
75% of the area has seeded and growing.
i. Seed shall be suitable for the following:
1. Mostly shade location
2. Residential lawn
3. Mowing operations with hand operated push or riding mowers
4. Sandy soils
5. Septic Field coverage (roots that do not grow deeper than 24 inches)
Replace Septic Tank and Drainfield at Ft Raleigh Quarters 1445 Page 5
6. No weeds (dandelion, bahai, pennywort)
7. No exotic species.
ii. Broadcast or Hydroseed. Add a cover crop of grain rye at 30 lbs/acre.
Rake broadcasted seed mix into the soil and saturate with water 2 – 3 times per day for 7 days, or until 75% of the area has seeds germinated and growing at least 1 inch high. Hydroseeded area may be observed for 7 days or until 75% of the area has growing seeds. If after 7 days, the area is less than 75% covered with new growth, overseed again and water 2-3 times per day until 75% of the ground is covered with growth.
NOTES:
1. The Contractor is responsible for marking all utilities in the affected area of ground disturbance for the project. The contractor will be responsible for repair or replacement of any damage to marked and unmarked utilities.
2. The Contractor must track demolition debris which are removed/recycled and provide NPS with receipts showing the weight and volume and type of material removed/recycled as part of this project.
3. No construction debris will be allowed to be left on premises. All public areas will remain clean and passible during normal business hours. During business hours, the contractor will ensure that no music is playing in the work areas and no foul language will be tolerated during or after business hours. Work on this project will be accomplished within the hours of 7:00 AM to 5:00 PM Monday thru Friday.
5.0 GOVERNMENT FURNISHED PROPERTY
1. No Government property, materials, or equipment will be provided. Water and electricity on the exterior of the existing house is available for Contractor use during this project. Contractor is responsible for lockout/tagout. Contractor is responsible for cleaning up site daily, and for repairing ruts created in grass areas.
Ruts shall be filled in or raked smooth before final acceptance of the project.
6.0 SUBMITTALS
1. Work schedule: delineating the various stages of work by phase (milestones) prior to the preconstruction conference.
2. Safety Plan/Accident Prevention Plan prior to the preconstruction conference.
3. Product Samples. The Contractor shall submit written documentation or color/product samples for materials identified in the Scope of Work.
3.1 Qualification information for Installer.
3.2 Septic Tank product data
3.3 Septic Drain Field Infiltrator product data
3.4 Manhole/Riser data
Replace Septic Tank and Drainfield at Ft Raleigh Quarters 1445 Page 6
3.5 Seed Mix
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S
S S
S S
S S
S S
S S
S S
S
S S
S S
S S
S S
S S
S S
S
SSSSS
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
Q 1447
EEEEE
EEEEE
E E
E E
E
E E
E E
E
EE
E E
E E
E E
E E
E E
E E
E E
E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
TC
TCTCTCTC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
E E
E
E E E E E E
E E
E
E
E
E
E
E E
E E
E E
E E
E
E E
E E
E
E
E
E
E E
E
EEEEEEEEEEEEEE
E E
E E
E E
E E
E E
E
EEEEE
EEEEE
LO
C
LO
C
LOC
LOC
LO
C
LO
C
LO
C
LO
C
LO
C
LOC
LOC
LO
C
LO
C
LO
C
LO
C
LOC LOC
LOC
LOC
Q 1445
LO
C
LO
C
LOC
LOC
LOC
LOC
LOC
LO
C
LO
C
LO
C
LOC
LO
C
LO
C
LO
C
LOC
LOC
LOC
LOC
LOC
LOC
LO
C
LO
C
LO
C
LO
C
LO
C
LOC LOC LOC
LOC
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
S S
S
SSSSSSSSSSSSS
S
SSSSSSSSSSSSS S
S
TC
TCTCTCTC
TC
TC
TC
TC
TC
E E
E
E E E E E E
E E
E E
E E
E
EEEEEEEEEEEEEE
E E
E E
E E
E
SSSSSSSSSSSSS
S S
LO
C
LO
C
LOC
LOC
LOC
LOC
LOC
LO
C
LO
C
LO
C
LOC
LO
C
LO
C
LO
C
LOC
LOC
LOC
LOC
LOC
S S
S S
S S
S S
S S
S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
E E
E
TC
TCTCTCTC
TC
TC
TC
TC
E E
E
E E E E E E
E E
E
E
E
E
E
E E
E E
E E
E E
E
E E
E E
E
E
E
E
E E
E
EEEEEEEEEEEEEE
E E
E E
E E
LO
C
LO
C
LOC
LOC
LOC
LOC
LOC
LO
C
LO
C
LO
C
LOC
LO
C
LO
C
LO
C
LOC
LOC
LOC
LOC
LOC
DISCONNECT EXISTING
SEPTIC DRAIN LINE
APPROX 10 FT FROM
HOUSE
20" Ø OAK TO
REMAIN. REMOVE
ROOTS WHICH
EXTEND INTO NEW
DRAINFIELD
SCALE:
EXISTING FORT RALEIGH Q1445 SEPTIC SYSTEM2 1:100
SCALE:
PROPOSED FT RALEIGH Q1445 SEPTIC SYSTEM3 1:100
SCALE:
AERIAL PHOTO FORT RALEIGH Q14451 1:400
EXISTING TREELINE
Q1445
DEMO EXISTING
750 GAL SEPTIC
TANK
LIMITS OF
CONSTRUCTION
PROVIDE 3 DRAINFIELD
TRENCHES AND INFILTRATION
CHAMBERS, 50 FT LONG, 3 FT
WIDE, AND 9 FT ON CENTER
13" Ø OAK TO
REMAIN
EXISTING HVAC
HEAT PUMP TO
REMAIN
21" Ø OAK TO
REMAIN
PROVIDE 1000 GAL
SEPTIC TANK AND
DISTRIBUTION BOX
CONNECT EX DRAINLINE
TO NEW SEPTIC TANK
APPROX 15 FT FROM
THE HOUSE TO AVOID
ELECTRICAL LINE
0 10 20 40 60 100
GRAPHIC SCALE
DEMO
EXISTING
DRAINFIELD
REMOVE 15" Ø OAK
Q1445
INSTALLATION NOTES:
1. INSTALL NEW SEPTIC DRAINLINES WITH POSITIVE SLOPE
TOWARD SEPTIC TANK (MINIMUM 18 INCH PER FOOT),
DISTRIBUTION BOX, AND DRAINFIELD TRENCHES. DO NOT
INSTALL DRAINLINES AT 0 PERCENT OR UPHILL SLOPE. SET
TANK, DISTRIBUTION BOX, AND TRENCHES AT ELEVATION TO
ENSURE DOWNHILL SLOPE OF ALL DRAINLINES.
2. SANITARY TEE CONNECTIONS SHALL NOT BE PERMITTED FOR
HORIZONTAL TO HORIZONTAL PIPE FITTING CONNECTIONS.
3. BACKFILL, RAKE SMOOTH, AND GRADE RUTS, EXCAVATIONS,
AND DISTURBANCE PRIOR TO SEEDING.
TOTAL NEW DISTURBANCE: 1,700 SF
TOTAL AREA WITHIN LOC: 2,450 SF
TREES TO BE REMOVED: ONE
DEMOLITION NOTES:
1. PRIOR TO DIGGING, LOCATE EXISTING UTILITIES
IN THE PROJECT AREA.
2. DIG UP AND TURN SOIL IN THE NEW DRAINFIELD
AREAS, REMOVING ALL ROOTS OR UNSUITABLE
SOIL.
3. CAREFULLY EXCAVATE SOIL OR HAND DIG TO
AVOID DAMAGE TO THE EXISTING ELECTRIC,
WATER, SEPTIC, AND COMMUNICATIONS LINES.
4. DO NOT TRAVERSE OVER UTILITY LINES WITH
HEAVY MACHINERY OR VEHICLES WHICH
WOULD DAMAGE EXISTING UTILITY LINES
WITHOUT SPREADER PLATES.
5. TREE REMOVALS INCLUDE THE TAP ROOT,
STUMP, AND ROOTS TO AT LEAST 5 FT OUTSIDE
THE EDGE OF THE NEW DRAINFIELD.
3' -0
50'-0"
9' -0
AutoCAD SHX Text Sheet
AutoCAD SHX Text Scale
AutoCAD SHX Text Project
AutoCAD SHX Text Date
AutoCAD SHX Text Revision/Issue
AutoCAD SHX Text Project Name and Address
AutoCAD SHX Text Firm Name and Address
AutoCAD SHX Text No.
AutoCAD SHX Text Date
AutoCAD SHX Text General Notes
AutoCAD SHX Text
REPLACE SEPTIC SYSTEM
AutoCAD SHX Text
AT FT RALEIGH HOUSING
AutoCAD SHX Text
1445 PEAR PAD ROAD
AutoCAD SHX Text
MANTEO, NC 27954
AutoCAD SHX Text
PMIS 326609
AutoCAD SHX Text 3/22/2024
AutoCAD SHX Text As Noted
AutoCAD SHX Text C2
RISER AND LATERAL LINE
SHALL BE SCHED 40 PVC
THREADED SLOTTED PLUG
GRADE
THREADED CAP ASSEMBLY
6" ABOVEGROUND
6"
NOTES:
1. THIS DETAIL SHOWS TYPICAL CLEAN OUT INSTALLATION. THIS DOES
NOT INDICATE SLOPE OF LATERAL LINES. INSTALL CLEANOUTS IN
LOCATIONS AND IN THE DIRECTION OF THE FLOW AS INDICATED IN
THE SCOPE OF WORK AND SITE PLANS.
NOTES:
1. TANKS SHALL BE PROVIDED BY A VENDOR APPROVED BY THE ON SITE
WATER PROTECTION BRANCH OF NC DEPT OF PUBLIC HEALTH AND
HUMNAN SERVICES (NCDHHS) TO MANUFACTURE SEPTIC TANKS.
OTHER VENDORS' TANKS SHALL OBTAIN APPROVAL ACCORDING TO
NORTH CARONLINA GENERAL STATUE CHAPTER 90A ARTICLE 5.
HTTPS://EHS.DPH.NCDHHS.GOV/OSWP/DOCS/RULES/SEWAGELAWS.PDF
2. TANKS FROM OUTSIDE OF NORTH CAROLINA SHALL SHOW PROOF OF
APPROVAL BY EQUIVALENT STATE AGENCY.
3. THIS DETAIL IS TYPICAL. EXACT DIMENSIONS MAY VARY.
SPECIFICATIONS IN THE SCOPE OF WORK SHALL BE FOLLOWED:
STAINLESS STEEL HANDLES, RISERS, ETC PER THE SCOPE OF WORK
4. THE CONTRACTOR SHALL FILL TANK WITH CLEAN WATER AFTER
INSTALLATION TO SHOW WATER TIGHT SEAL. WATER SHALL BE LEFT
IN TANK 24 HOURS TO CHECK FOR LEAKS.
SCALE:
TYPICAL CLEANOUT1 1" = 1'-0"
SCALE:
TYPICAL 1,000 GALLON CONCRETE SEPTIC TANK3 NOT TO SCALE
SCALE:
BASIS OF DESIGN FOR SEPTIC DRAINFIELD INFILTRATION CHAMBERS2 NTS
NOTES:
1. THIS DETAIL IS ONLY TO SHOW THE BASIS OF DESIGN. TRENCHES FOR
THE SEPTIC SYSTEM SHALL BE 36 INCHES WIDE. ACTUAL PRODUCTS
FOR THE INFILTRATION CHAMBERS SHALL BE AT THE DISCRETION OF
THE CONTRACTOR. PRODUCTS SHALL MEET THE REQUIREMENTS OF
NORTH CAROLINA ADMINISTRATIVE CODE FOR SEPTIC SYSTEM
PRODUCTS AS APPROVED BY NCDHHS.
HTTPS://EHS.DPH.NCDHHS.GOV/OSWP/APPROVEDPRODUCTS.HTM
AutoCAD SHX Text Sheet
AutoCAD SHX Text Scale
AutoCAD SHX Text Project
AutoCAD SHX Text Date
AutoCAD SHX Text Revision/Issue
AutoCAD SHX Text Project Name and Address
AutoCAD SHX Text Firm Name and Address
AutoCAD SHX Text No.
AutoCAD SHX Text Date
AutoCAD SHX Text General Notes
AutoCAD SHX Text
REPLACE SEPTIC SYSTEM
AutoCAD SHX Text
AT FT RALEIGH HOUSING
AutoCAD SHX Text
1443-1447 PEAR PAD RD
AutoCAD SHX Text
MANTEO, NC 27954
AutoCAD SHX Text
PMIS 326609
AutoCAD SHX Text 3/22/2024
AutoCAD SHX Text As Noted
AutoCAD SHX Text C4
| CAHA_326609B_SOW_Q1445 Septic |
| CAHA_326609B_SOW_Attch1 |
| Sheets and Views |
| Q 1443 design septic-Q1445 |
| CAHA_326609B_SOW_Attch2 |
| Sheets and Views |
| Q 1443 design septic-Septic Details |
File details come from the government source that posted it. Updated .