A2+-+Site+Photographs.pdf
PDF 8 MB Posted
- Solicitation number
- 303-23-009
- Issued by
- Renville County, Milton City, North Dakota
About this file
This document contains site photographs related to the universal waste removal project at the former Renville-Bottineau Memorial Hospital located in Mohall, North Dakota. The project is being solicited by the state of North Dakota and involves the removal of various universal waste items, including PCB ballasts, fluorescent light fixtures, refrigerators, CRTs, and ACs, from the hospital's main floor, basement, and second floor. The project site is located at 101 4th Ave SE in Mohall, within Renville County. No specific quantities or response dates are provided in the document.
The site photographs offer a detailed visual inventory of the universal waste items and the current condition of the former hospital facility. The photographs indicate the presence of hazardous materials such as asbestos and PCBs, which will require proper handling and disposal during the waste removal process. The project's scope and requirements are not explicitly stated, but the photographs suggest a comprehensive assessment and cleanup of the hospital's universal waste inventory.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Renville+Bottineau+Hosp+UW+IFB.docx | DOCX document | |
| A1+-+Asbestos+and+Hazardous+Mat+Survey.pdf | ||
| A4+-+PSA.docx | DOCX document | |
| NOI+to+Award.docx | DOCX document | |
| A3+-+Building+Maps.pdf | ||
| Amendment+1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 2 – SITE PHOTOGRAPHS
Former Renville-Bottineau Memorial Hospital Photos
Universal Waste Cleanup
Building West Facing Main Entrance
Building Southwest Facing
Building Southeast Facing
Building East Facing
Building Northeast Facing
Building North Facing
Building Northeast Facing
Leaking PCB Ballast in Fluorescent Light Fixture
Main Floor Room M1
Main Floor Room M1 Adjacent Bathroom
Main Floor Room M25
Main Floor Room M25
Main Floor Room M1 Adjacent Bathroom
Main Floor North-South Hallway
Main Floor Room M4
Main Floor Room M6 Adjacent Bathroom- Fluorescent Light Fixture
Main Floor Room M7- Fluorescent Light Fixtures
Main Floor Room M7
Main Floor Room M8
Main Floor Room M9
Main Floor Room M9- Fluorescent Light Fixtures
Main Floor Room M10
Main Floor East-West Hallway
Main Floor Room M15
Main Floor Room M15- Looking East
Main Floor Room M17
Main Floor East-West Hallway Annex
Main Floor Room M18
Main Floor Room M19
Main Floor Room M20
Main Floor Room M21
Main Floor Room M23- Old X-ray Room
Main Floor Room M23 Adjacent Bathroom- Fluorescent Light Fixture
Main Floor Room M23 Looking West- PCB Transformer Located in Gray Metal Box on Far Right
Main Floor Room M22
Main Floor Room M24
Main Floor Stairwell to Basement
Main Floor Stairwell to 2nd Floor
Basement Hallway by Elevator
Basement Room B7
Basement Room B1- Refrigerator
Basement Room B1- CRT’s and AC’s
Basement Room B1- AC’s
Basement East-West Hallway
Basement Room B6
Basement Room B5
Basement Room B4- Asbestos Linoleum with Asbestos Mastic
Basement Room B2
Basement Room B3- Loose 8 Ft Fluorescent Bulbs in Corner
Second Floor South Stairwell
Second Floor Room S6
Second Floor Room S7
Second Floor Room S4
Second Floor North-South Hallway
Second Floor Room S9
Second Floor Room S8
Second Floor Hallway in Front of Elevator
Second Floor Room S3
Second Floor Room S2
Second Floor Room S4
Second Floor Room S1
Second Floor Room S22
Second Floor East-West Hallway
Second Floor Room S11
Second Floor Room S12
Second Floor Room S20
Second Floor Room S19
Second Floor Room S13
Second Floor Room S14
File details come from the government source that posted it. Updated .