A2 - Performance Work Statement - COMM TDM Circuit.pdf
PDF 368 KB Posted
- Attached to
- 120 AW Local Telephone Services & LSTDM to SIP Conversion Federal contract opportunity
- Solicitation number
- W50S7L25QA001
- Issued by
- Department of the Army National Guard
About this file
This is a Performance Work Statement (PWS) for Local Telecommunication Services (LTS) conversion from LSTDM to SIP Trunking at the 120AW Montana Air National Guard. The contractor must provide all personnel, equipment, tools, materials, supervision, and quality control necessary to replace the current Local Telecommunication Services and Long-Distance services that are provided on a low-speed time-division multiplexed circuit with emulated session initiation protocol to TDM circuit.
The key requirements include providing and installing transmission equipment and cables for local exchange access, maintaining 24/7/365 service availability with 99.9% uptime, coordinating with Government POC for installations and outages, and following specific outage notification and restoration procedures based on priority levels (catastrophic, emergency, serious, and routine). The contractor must provide 800 Direct-Inward-Dialing directory numbers in the 406-791 range, support Government Emergency Telecommunications Service (GETS), and ensure E911 compatibility. The period of performance includes 1 base year with four option years, plus a 1-month installation period. The work will be performed at Building 63, MTANG, 2800 Airport Ave B, Great Falls, MT 59404.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W50S7L25QA001 - Provisions and Clauses.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
FOR
Local Telecommunication Services (LTS) Conversion from LSTDM to SIP Trunking
120AW Montana Air National Guard
1.0 General:
1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform Local Telecommunication Services (LTS) Conversion from LSTDM to SIP Trunking, as defined in this PWS.
These services shall include any equipment, wiring, or infrastructure to ensure the Contractor’s proposed solution is compatible with the Government’s current infrastructure without additional Government expense. Access to the local exchange shall also include operator assistance functions. These services shall not include residential or business services for non-Government entities or Government contractors. The Contractor shall follow all Federal Communications Commission (FCC), Public Utility Commission (PUC), Department of Defense (DoD), AF, and industry standards for this requirement.
The Contractor shall provide and install transmission equipment and cables for local exchange access and transport service circuits to the Government-provided floor space at the Government demarcation location(s) identified in Appendix 1. The Contractor shall connect to Government-provided power connection points and termination frames.
The Contractor shall coordinate with the Government Point of Contact (POC) (primary and alternate names, emails, and telephone numbers shall be provided by the Government No Later Than (NLT) five days after contract award) prior to any installation. The Government does not authorize aerial cable installations.
1.1.1 Objectives: This requirement will replace Local Telecommunication Services
(LTS) and Long-Distance (LD) services that are currently provided on a low-speed time-division multiplexed (LSTDM) circuit with emulated session initiation protocol (SIP) to TDM circuit. All connectivity requirements and features currently transported over the existing LSTDM must be migrated to an emulated SIP path without loss of capabilities. This PWS is for managed SIP circuit. This LTS will support the installation 24 hours a day/seven days a week/365 days a year (24/7/365).
1.1.2 Scheduled Outages: The Contractor shall notify the Government POC of any scheduled outage that will affect any telecommunication service. The Contractor shall inform the Government POC NLT 48 hours prior to the scheduled outage. The Contractor shall provide a detailed explanation for the outage to include the amount of downtime and end users affected. The Contractor shall notify the Government POC via email of the need for any scheduled service outages. Such outages shall be scheduled to minimize inconvenience to users. The Government POC must release all affected equipment and circuits prior to any service disruption. The Contractor shall follow procedures identified below for outages.
1.1.3 Unscheduled Outages. If multiple facilities, areas, primary trunks, or cables/fibers are impacted, the Government POC shall assign the category of the outage and establish the repair priority. The Contractor shall notify the Government POC verbally of problem(s) and follow-up with documentation via email within time specified for each outage type.
1.1.4 Outage Procedures. The Contractor shall follow procedures identified below for outages. In all cases, notification shall include:
• Reason for interruption;
• Duration;
• Start and stop times;
• Affected equipment, lines, and buildings; and
• Restoration action (what service was impacted and how service was restored)
1.1.5. Outage Priority, Restoration of Service, and Maintenance. The Contractor shall respond and restore service outages. From the time of receipt of the notification, the Contractor shall respond and coordinate with the Government POC within the time limits indicated below. For mission-essential functions, the Government POC shall identify and prioritize the essential contractor services. The Contractor shall prioritize and perform restorations IAW the Telecommunications Services Priority (TSP) and Restoration Priority List (RPL), which are provided by the Government POC. In the event that the Contractor anticipates not being able to perform any of the essential contractor services (i.e. beyond the Contractor’s control) IAW the TSP and RPL during a crisis situation, the Contractor shall notify the Government POC as expeditiously as possible and use its best efforts to cooperate with the Government in the Government’s efforts to maintain the continuity of operations. If the Government POC determines that the outage restoration time frames cannot be met for other non-mission essential functions, the Government POC can declare any outage restoration priority level as catastrophic to emergency to serious to routine if the outage significantly affects the mission of the Government.
1.1.6. Catastrophic Outage. A catastrophic outages demands immediate attention, such as a total loss of service, loss of network control, and loss of call processing capability to 95% or more of equipped lines and/or trunks. The Government POC can declare any outage as a catastrophic outage if the outage significantly affects the mission of the Government. A catastrophic outage is normally a sudden and widespread disaster stemming from the result of a man made or natural disaster in which property and site network infrastructure are completely destroyed. Restore service time will be determined from the time the Contractor responds to the Government’s notification IAW the local TSP and RPL requirements. The Contractor must advise the Government POC of their restoration procedures for the base in a catastrophic situation. The Contractor shall respond to the outage NLT one hour of receipt of notification by the Government POC and advise the Government POC of its restoration procedures for a catastrophic situation. The Contractor shall provide the Government POC with updates NLT every four hours on the status of restoration actions.
1.1.7. Emergency Outage. An emergency outage demands rapid action. The Government POC can declare any outage as an emergency outage if an outage significantly affects the mission of the Government. Emergency is defined by the Government as any outage that severely hampers the Air Force mission and can be restored within the restoration parameters. The Contractor shall respond to the outage NLT one hour of receipt of notification by the Government POC. The Contractor shall restore service NLT eight hours from the time the Contractor responds to the Government notification.
1.1.8. Serious Outage. A serious outage demands timely action, as such as degraded service or a fault condition that makes the system perform at a level less than that for which it is designed; condition discovered in automatic routing which has not shown in the operation of the equipment, but requires attention. The Government POC can declare any outage as a serious outage if an outage significantly affects the mission of the Government. The Contractor shall respond to the outage NLT one hour of receipt of notification by the Government POC. The Contractor shall restore service NLT 24 hours from the time the Contractor responds to the Government notification.
1.1.9. Routine Outage. A routine outage minimally disrupts service to property, equipment, and site infrastructure. The Government POC can declare any outage as a routine outage if an outage does not seriously affect the mission, but does hamper day-to-day operation of the Government installation. The Contractor shall respond to the outage NLT one hour of receipt of notification by the Government POC. The Contractor shall restore service NLT two calendar days from the time the Contractor responds to the Government’s notification.
Performance Element Number
Performance Objective
PWS
Paragraph
Performance Threshold
1 Perform and provide local access at the designated circuit demarcation points identified in Appendix 1 to this PWS.
1 Continuous operation local phone service 24/7/365 with 99.9% availability
2 Inform the Government POC NLT 30 days in advance of scheduled outage providing a detailed explanation for the outage.
1.1.2 Timely and detailed
notification provided 100% of time
3 Responds and restores Catastrophic Priority service outages IAW PWS, TSP, and RPL as coordinated with the Government POC.
1.1.5 and 1.1.6
Timely response to notification and timely restoration of services provided 100% of the time
4 Respond and restore Emergency Priority service outages IAW PWS, TSP, and RPL as coordinated with the Government POC.
1.1.5 and 1.1.7
Timely response to notification and timely restoration of services provided 100% of the time
5 Respond and restore Serious Priority service outages IAW PWS, TSP, and RPL as coordinated with the Government POC.
1.1.5 and 1.1.8
Timely response to notification and timely restoration of services provided 100% of the time
6 Respond and restore Routine service outages IAW PWS, TSP, and RPL as coordinated with the Government POC.
1.1.5 and 1.1.9
Timely response to notification and timely restoration of services provided 100% of the time
1.1.10. Inspection. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. The Government has the right to inspect all services identified within the contract (SS and Non-SS items), to the extent practicable at all times and places during the term of the contract.
1.1.11. Grade of Service. Locations carrying contracted voice grade which is packetized for transport across an IP, MPLS, or other IXC system require grade of service (GoS), implemented as quality of service (QoS), to ensure that end-to-end per-call latency and packet jitter remain within ITU standards. This requirement is applicable to VoIP traffic, video traffic, or other real-time traffic that has been identified and contracted for an elevated GoS. Vendor will ensure QoS end to end including through sub-contracted external LEC/CLEC facilities; implementation strategies that may include Committed
Access Rates (CAR), Expedited Forwarding (EF), and traffic shaping determined by customer marked DSCP packets or pre-contracted data flows.
1.2 Background: The Department of Defense (DoD) Chief Information Officer (CIO) has mandated all LSTDM transport technologies used for mission-related tasks be retired and replaced with IP based technologies. This is due to commercial support and hardware for LSTDM equipment being more difficult to find or phased out entirely. Due to changes in technology, equipment, and processes, it has become evident that the Government should acquire these services in a performance-based manner, consistent with the principles contained in Air Force Instruction (AFI) 63-138 “Acquisition of Services.” These services are considered Information Technology (IT) In Accordance With (IAW) Defense Federal Acquisition Regulation Supplement (DFARS) 239.74 “Telecommunications Services.” The requirement herein represents the site’s performance-based requirements for local, long-distance “dial-tone” and ancillary services as defined herein. As a part of the new process, the Air Force (AF) encourages the Contractor to identify or suggest improvements to existing LTS processes, operating procedures, systems, or applications to the Contracting Officer (CO).
1.3 Period of Performance (PoP): The Period of Performance shall be 1 Base Year of 1 month for the install. Then one year period of performance for the Base Year and Four Option Years.
1.4 General Information:
1.4.1 Place and Performance of Services: The contractor shall provide services between the hours of 0700-1630) on Monday through Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Performance shall be at THE MOTNANA AIR NATIONAL GUARD, Building
63. The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential.
1.4.1.1 Telework: The Government does not permit the contractor to telework in support of this requirement. In furtherance of Continuity of Operations Planning (COOP), a telework program may be enacted to ensure that the Government's mission-critical operations stay operational during times of national emergency or incidents of national significance. Telework shall be at no additional cost to the Government.
1.4.1.2 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.
1.4.1.3 The contractor’s employees shall become familiar with and obey the regulations of the installation; including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times, and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation, which may affect performance. The Government reserves the right to direct the removal of an employee from Government property or revoke access to Government systems for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.
1.4.2 Recognized Holidays: The following are recognized United States (US) holidays.
The contractor shall not perform services on these days:
1.4.2.1 New Year’s Day: January 1st
1.4.2.2 Martin Luther King, Jr.’s Birthday
1.4.2.3 President’s Day
1.4.2.4 Memorial Day
1.4.2.5 Juneteenth National Independence Day: June 19th
1.4.2.6 Independence Day: July 4th
1.4.2.7 Labor Day
1.4.2.8 Columbus Day
1.4.2.9 Veteran’s Day: November 11th
1.4.2.10 Thanksgiving Day
1.4.2.11 Christmas Day: December 25th
1.4.4 Quality Assurance (QA): The Government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government will do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) or defect rate(s).
1.4.5 Access and General Protection/Security Policy and Procedures. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, Headquarters Air Force (HAF) and/or local policy.
Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
1. The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation.
2. The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The letter will also specify the individual(s) authorized to sign for a request for base identification credentials or vehicle passes. The contracting officer will endorse the request and forward it to the issuing base pass and registration office or Security Forces for processing. When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver s license, current vehicle registration, valid vehicle insurance certificate, and [insert any additional requirements to comply with local security procedures] to obtain a vehicle pass.
3. During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.
4. When work under this contract requires unescorted entry to controlled or restricted areas, the contractor shall comply with
5. Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.
6. Failure to comply with these requirements may result in withholding of final payment.
7. For Contractors that do not require CAC, but require access to a DoD Facility and/or Installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (AFI 10-245, AFI 31-101 and AFMAN 31-113), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
1.4.5.3 Antiterrorism Awareness Level I Training (AT Level I). All contractor employees, to include subcontractor employees, requiring access to US Government installations, facilities and controlled access areas shall complete AT Level I training within 15 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. AT Level I may be accomplished by a Level I qualified instructor; completing the Force Protection computer-based training (CBT) course on the Advanced Distributed Learning System (ADLS) or Joint
Knowledge Online at http://jko.jten.mil. Tracking for each contractor or subcontractor employee is the responsibility of the COR or unit AT Representative. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee to KO (MSgt Anthony Barille) within 15 calendar days after completion of training by each employee or subcontractor personnel.
1.4.5.5 Communications Security/Information Technology (COMSEC/IT) Security.
All communications with DoD organizations are subject to COMSEC review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DoD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations. Therefore, the contractor is advised that any time contractor personnel place or receive a call they are subject to COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DoD information. The contractor shall abide by all Government regulations concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit Government personnel or advertise job openings.
1.4.5.6 Use of Government Information Systems (IS) and access to Government networks is a revocable privilege, not a right. Users are the foundation of the DoD strategy and their actions affect the most vulnerable portion of the Air Force Infostructure. Contractor employees shall have a favorable background investigation or hold a security clearance and access approvals commensurate with the level of information processed or available on the system. Contractor employees shall:
1.4.5.6.1 Comply with the command's Acceptable Use Policy (AUP) for Government owned IS and sign an AUP prior to or upon account activation.
1.4.5.6.2 Complete initial and/or annual Information Assurance (IA) training as required by applicable Air Force/ANG policy.
1.4.5.6.3 Mark and safeguard files, output products, and storage media per classification level and disseminate them only to individuals authorized to receive them with a valid need to know.
1.4.5.6.4 Protect IS and IS peripherals located in their respective areas in accordance with physical security and data protection requirements.
1.4.5.6.5 Practice safe network and Internet operating principles and take no actions that threaten the integrity of the system or network.
1.4.6 Physical Security. The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.
http://jko.jten.mil/
1.4.9 Contract Manager (CM): The contactor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO.
The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM shall work through the KO, to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.
1.4.11. Combating Trafficking in Persons: The United States Government has adopted a zero tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at FAR 22.17.
1.4.12 Contractor Travel
The contractor shall travel to Great Falls, MT IAP during the performance of this contract to change over the current telecommunications infrastructure.
The contractor will be authorized travel expenses consistent with the substantive provisions of the Joint Travel Regulation (JTR) and the limitation of funds specified in this contract. All travel requires COR recommendation for approval and/or authorization by the KO prior to travel arrangements being made.
1.4.14 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5. The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO. In the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may impose other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.
2.0 Definitions and Acronyms:
2.1 Definitions:
2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
2.1.2 Defective Service: A service output that does not meet the standard of performance associated with the PWS.
2.1.3 Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.
2.1.4 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.5 Physical Security: Actions that prevent the loss or damage of Government property.
2.1.6 Quality Assurance: The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.7 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.8 Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.
2.1.9 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.2 Acronyms:
See Appendix 2
3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S): The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract:
3.1. Securing and Safeguarding
The Contractor shall secure Government facilities, equipment, and materials before leaving a facility. The Contractor shall safeguard the Government provided facilities and material contained therein.
3.2. Rack Space
The Government will provide 3U of standard 19” of rack space for the installation of the Contractor’s provided transmission equipment. The floor space shall be coordinated with the Government POC to accommodate Contractor-provided relay rack(s), at each demarcation point. Space is available for relay rack(s) for Contractor equipment in the demarcation point.
3.3. Environmental Controls
The Government will provide sufficient environmental controls to maintain humidity and temperature within the Contractor’s equipment operating specifications. In addition, the Government will provide primary and emergency conditioned power sources to operate the Contractor’s equipment within manufacturer’s specifications.
3.4. Wall Space
The Government will also provide 30 sq ft of wall space.
3.5 Property: The Government will furnish the necessary workspace for the contractor to perform services outlined in this PWS to include desk space, telephones, computers and other items necessary to maintain an office environment.
3.6 Utilities: All utilities in the facility will be available for the contactor’s use in the performance of this contract. The contractor shall instruct employees in utilities conservation practices. The contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.
4.0 Requirements: The contractor shall:
4.1. Personnel
The Contractor is solely responsible for ensuring sufficient personnel are assigned to this requirement. Appropriate personnel shall possess the qualifications and certifications to perform the requirements listed herein. These qualifications and certifications shall include those required by the Original Equipment Manufacturer (OEM) to maintain, install, and/or operate the equipment covered by this contract.
4.2. Government Emergency Telecommunications Service (GETS)
GETS will be used in an emergency or crisis situation when the Public Switched Telephone Network (PSTN) is congested and the probability of completing a call over normal telecommunication means has significantly decreased. The Contractor must have NPA (710) in the switch to allow access to the GETS line assigned to a specific site. Authorized users are provided access to an emergency service by dialing 0/1+710-
NXX-XXXX. The 710 NPA provides access to a tariffed service of the GETS interexchange carriers and the call is billed to the United States Government.
4.3. Interconnection Agreements, and Cutover Plans
In the event the award is made to a non-incumbent contractor, the incoming Contractor shall submit all Interconnection Agreements (IAs) via link, or as an addendum, to the Government with their quote. The addendum is not included in the technical quote and no page limitations apply to this submittal. Additionally, if providing a quote as a Competitive Local Exchange Carrier (CLEC) for any and/or all services, provide documented evidence of IAs and/or leasing agreements relevant to this effort.
For Government planning and funding purposes, the Contractor, as industry experts, is required to inform the Government of their anticipated cutover time frame. The Contractor shall develop and submit an Initial Cutover Plan to the Government with their technical quote. A Final Cutover Plan is required to be submitted NLT ten (10) working days after contract award. This plan shall include installation of the initial required services for cutover of LTS requirements, along with the recommended time frame to complete each phase of the cutover process. The Contractor shall coordinate deviations from the finalized Cutover Plan with the Government POC prior to any work commencing in the affected area. The Contractor shall ensure that all circuits, equipment, and service provided by the incumbent, under the prior contract, are disconnected/discontinued upon successful cutover. At this point, the Contractor shall inform the Government POC that the previous provider’s equipment is no longer needed and may be removed by the previous provider. Any omissions or discrepancies in the Cutover Plan does not relieve the Contractor of its responsibility to install, cutover, and perform all services identified in this requirement. It is the Contractor’s responsibility to resolve any issues associated with these efforts within a time agreed upon by the Government POC and the Contractor.
4.3.1. Cutover Plan Content. The Cutover Plan shall contain, at a minimum, the following site specific information:
a) Overview/Scope of plan, indicating proposed timeframe to complete cutover.
b) A detailed Implementation Plan in working days to complete requirements listed in PWS as site-specific (see Appendix 1). The use of a Gantt or Milestone chart to illustrate your plan is suggested.
c) Conditions/Support required prior to the start of cutover;
d) A listing of Offeror responsibilities;
e) A listing of proposed Government responsibilities;
f) Key Departments essential to the Offeror’s Installation and Cutover Plan available to participate in routine progress meetings with the Government on a weekly or bi-weekly basis.
g) Key POC List for Contractor, Customer Site and Government Contracting Office must be included in the Final Cutover Plan.
4.4. Safety, Health and Fire Protection Requirements
The Contractor shall follow local procedures established by the local safety and health offices. Reference the instructions in Code of Federal Regulations (CFR) 29, Part
1926.58, Appendix G for proximate to asbestos containing materials. The Contractor shall record and report to the CSO all available facts relating to each instance of accidental damage to Government property or injury to either Contractor or Government personnel.
4.5. Security
For Contractors that do not require CAC, but require access to a DoD Facility and/or Installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (AFI 10-245, AFI 31-101 and AFMAN 31-113), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
Service Contract Reporting:
5.1 The contractor shall completely fill in all required data fields using the following web address: https://sam.gov. Log in and select Entity Registrations and then select Service Contract Reporting.
The Contractor shall report the required information annually by October 31, for services performed under this contract during the preceding Government fiscal year (October 1- September 30).
The DoD Guidebook for Service Contract Reporting in SAM, available on the DoD Procurement Toolbox at https://dodprocurementtoolbox.com/site-pages/service-contract-reporting-scr. The General Services Administration (GSA) has also posted additional guidance such as quick start guides, informational videos, and frequently asked questions, that can be accessed by going to https://sam.gov and searching the “HELP” section. The SAM Federal User Guide is also available in the “HELP” section for comprehensive instructions on navigating SAM. Contractors requiring assistance using SAM should contact the Federal Service Desk at https://www.fsd.gov.
https://dodprocurementtoolbox.com/site-pages/service-contract-reporting-scr https://dodprocurementtoolbox.com/site-pages/service-contract-reporting-scr https://www.fsd.gov/
5. APPENDICES
APPENDIX 1 – SITE SPECIFIC REQUIREMENTS
5.1. Required Services and Features
The Contractor shall provide the following Government line of local and Long-Distance commercial communications services for 120AW at cutover. Innovative technical solutions are encouraged but must be compatible with the current requirement that is listed in the remainder of this Appendix. The quantity of these initial service requirements will be incorporated into the Pricing Schedule. The installation service requirement will be identified here in Appendix 1 and in the Pricing Schedule.
The Government telephone switching system is identified as a Avaya S8810 with the CM 7.0, and the switching system is located in Building 25, MTANG, 2800 Airport Ave B, Great Falls, MT 59404.
The Government Communication Services Officer (CSO) and Technical Representative shall be identified at the post award conference and updates provided to the contractor as required by the CO.
5.2. Direct-Inward-Dialing (DID) Directory Numbers.
NPA- NXX-XXXX DID Directory Numbers 406-791-0100 to 0900 800
TOTAL 800
5.3. Exchange and Access Lines. N/A
5.3.1. Commercial Subscriber Lines. N/A
5.3.2. Hot Lines. N/A
5.4. Local Exchange and Access Trunks. N/A
5.4.1. Local Exchange Access Analog Trunks. N/A
5.4.2. Local Exchange Access Digital Trunks. N/A
5.4.3. Local Exchange Digital (ISDN Primary Rate Interface (PRI) Trunks.
ISDN PRI Circuit
ID
D- Channel Quantity
B-Channel
Demarcation
IC
B-Channel Quantity & Signaling
(PRI Q.931)
OG
B-Channel Quantity & Signaling
(PRI Q.931)
2 Way Channel
B-Channel Quantity & Signaling
(PRI Q.931)
44ISDA000006/MS
1 Qty: 23 Signal: NI2
Qty: 23 Signal: NI2
Qty: 23 Signal: NI2
Building 25, 120AW MTANG, 2800 Airport Ave B, Great Falls, MT 59404
5.5. Foreign Exchange (FX) Lines/Trunks. N/A
5.5.1. Analog FX Line/Trunks. N/A
5.5.2. Foreign Exchange Digital Trunks. N/A
5.6. Transport Channels. N/A
5.7. Data Point-to-Point Circuits. N/A
5.8. Circuit Extension. N/A
5.9. Public Listings. N/A
5.10. Telephone Directories.
Contractor shall provide an electronic telephone directory annually at award, and each subsequent year at the exercise of the option, in .pdf format (Adobe®).
5.11. Diversity/Diverse Routing. N/A
5.12. E911 Compatibility
Contractor shall include a description of how 911 calls are routed through their telephone system to ensure we remain compliant with 911 telecommunications laws in accordance with Kari’s Law. Kari's Law states all 911 calls dialed from a MLTS (Multi-Line Telephone System) need to reach an FCC registered PSAP (Public Service Answering Point).
5.13. Special Services
Examples of vendor circuit/trunk routing supporting Appendix 1 requirements are provided in the below diagrams 1 and 2. These examples apply to ANG and Government sites with switches and/or PBX configuration, for Traditional Legacy or SIP trunking delivery. The Carrier, if providing a CPE installed digital loop carrier system or other IP based CPE gateway system, will provide the customer with IP, VLAN, routing protocols or other pertinent information to allow the customer to logically interface with the carrier system. The customer owned demarcation device will in most cases consist of an Edge Boundary Controller providing isolation and firewall services. The vendor shall provide a 24/7 capability to monitor the IP connection to the customer gateway equipment, and alert the customer to a link failure; the customer must also have the ability to reach the vendor’s network operations center on a 24/7 basis.
5.14. Service Routing.
Contractor shall submit a service routing diagram (reference Appendix Diagrams 1 and 2 for examples) and/or service routing description in their technical quote. Contractor may provide the requested diagram and legend using these formats or a similar format to be in compliance with paragraph 4.3.1. Submission of a generic diagram or not explaining the service routing may be determined technically unacceptable.
Pump House
Off Govt Quarters
Apple
Medical Facility
Vendor / Incumbent Local Exchange Carrier (ILEC) / Competitive Local Exchange
Carrier (CLEC) Dial Central Office (DCO)
Police Dept
Remote Switch/PBX
Foreign City DCO 583 Claire Blvd
# of BRI and CSL
Off Premise
Voice Grade
Hotline
4 - Wired Data
2 - Wired Alarm
# of PRIs and DIDs
Main Site DCO 1234 AF Road, Any Base, USA
GOVT
SWITCH
GOVT
MDF
# of BRI and CSL
# of PRIs and DIDs
Foreign Exchange
Trunk
Outside Local LATA
Diagram 1
TRADITIONAL LEGACY
VENDOR/LEC/ILEC
NETWORK
PRI
LEC Provided BRI
CPE (SIP)
GIG
Ether
Govt Provided
Unified
Communications
IP Network
Note: The vendor controlled Customer Premise Equipment (CPE) shall be vendor provided. The EBC, if available, shall be Government provided.
Legacy Services & Equipment
Diagram 2
UTILIZING SIP TRUNKING
Multifunction Edge Router
Edge Boundary Controller (if available)
Ver. October 2022
APPENDIX 2 - DEFINITIONS & ACRONYMS
Table A. Definitions
TERM DEFINITION
Appendix 1 Defines the 120AW requirements detailing locations on circuit delivery.
Call Setup Success Rate (CSSR)
The fractionalized amount of calls that make a successful connection to a dialed number, this is divided by the total number of calls placed. (As defined by International Telecommunication Union).
Circuit Termination Circuit termination at the Government installation includes the Main Distribution Frame (MDF) for analog signals, metallic cable pairs, Digital Signal Cross-Connect (DSX)-1 patch, cross connect panel(s) for T-1 and/or T-3 circuits, fiber optic patch and cross connect panels for optical interface equipment such as the optical carrier or SONET or MPLS systems, optical multiplexer equipment, and may extend to Cat 3/5/6 RJ-45 jack fields if directed by the Government POC to ensure adequate hand off of the circuit to the Government. Other wall-mounted, punch-down, terminal blocks are used for isolation and termination of Contractor metallic facilities.
Communications Focal Point (CFP)
A 24/7 Focal Point located on an Air Force Facility that provides one stop notification services and provides reporting and tracking of communications outages to Government users of the communication systems.
Commercial Subscriber lines
(CSL)
A CSL is defined by Government standards as a voice grade subscriber line serving directly from the Contractor’s central office switch to customer’s location.
Competitive Local Exchange Carrier
(CLEC)
A telephone company that competes with the already established local telephone business by providing its own network and switching.
Contractor A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
TERM DEFINITION
Customer Premise Equipment (CPE)
Also known as Customer-Provided Equipment is any equipment located at a subscriber's premises and connected with a carrier's telecommunication network at the contractually established demarcation point. The demarcation point contractually separates the customer equipment from the equipment located in either the distribution infrastructure or central office of the communications service provider. Vendor installed CPE devices are fully vendor owned, maintained, and monitored by the Vendor’s management platform. CPE equipment can be powered from the customer source electrical system, but a sufficient emergency power source must be available during periods of customer power interruption for any services contractually requiring a high level of reliability.
Customer Service Record (CSR)
Report that details the fixed monthly charges billed by the local telephone company. The CSR is composed of computer codes called USOCs, which in turn correspond to a particular tariffed service.
Defective Service A service output that does not meet the standard of performance associated with the PWS.
Deliverable Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
Dropped Call Rate
(DCR)
The fractionalized amount of calls that experience a lost connection after a successful initial call establishment. (As defined by International Telecommunication Union).
DS-1 A DS level and framing specification for synchronous digital streams, over circuits in the North American digital transmission hierarchy, at the DS1 transmission rate of 1,544,000 bits per second. DS1 is commonly used to multiplex 24 DS0 channels.
Each DS0 channel, originally a digitized voice-grade telephone signal, carries 8000 bytes per second (64,000 bits per second). A DS1 frame includes one byte from each of the 24 DS0 channels and adds one framing bit, making a total of 193 bits per frame at 8000 frames per second. The result is 193*8000 = 1,544,000 bits per second.
Edge Boundary Controller (EBC)
A customer provided network node device that provides firewall, intrusion detection, routing, QoS, and packet equalization between the Vendors IP Wide Area Network and the interior customer IP network. The EBC will provide the logical demarcation point between IP SIP delivered services when applicable and will physically interface to the vendor’s CPE Gateway Router device.
TERM DEFINITION
Extended Area Calling Service
A geographic area beyond the local service area to which traffic is classified as local for selected customers, i.e., telephone service that allows subscribers in one exchange to call subscribers of another exchange without a toll charge or for a negotiated fixed rate.
Flat Rate A non-fluctuating monthly rate for telephone service in which an unlimited number of local calls can be made without further charge the extent of the contract. The monthly rate is established in the contract.
Government Emergency Telecommunications Service (GETS)
A White House-directed emergency phone service provided by the National Communications System (NCS) in the Cyber Security & Communications Division, National Protection and Programs of the Department of Homeland Security. GETS supports Federal, State, local, and tribal Government, industry, and non-Governmental organization (NGO) personnel in performing their National Security and Emergency Preparedness (NS/EP) missions. GETS provides emergency access and priority processing in the local and long distance segments of the Public Switched Telephone Network (PSTN). It is used in an emergency or crisis situation when the PSTN is congested and the probability of completing a call over normal or other alternate tele-communication means has significantly decreased. The servicing LEC must have NPA (710) in the switch to allow access to the GETS line assigned to a specific site. Dialing 0/1+710-NXX-XXXX provides access to an emergency service for authorized users. The 710 NPA provides access to a tariffed service of the GETS interexchange carriers (AT&T, MCI WorldCom, and Sprint) and the call is billed to the U.S.
Government. Web link:
http://gets.ncs.gov/
Incumbent Local Exchange Carrier
(ILEC)
The dominant phone carrier within a geographic area as determined by the FCC Section 252 of the Telecommunications Act of 1996 provided local exchange service to specific area.
Interconnection Agreement
A business contract between telecommunication organizations for interconnecting their networks and exchanging telecommunication traffic. These agreements are present in both public switched telephone networks and the Internet.
Intra LATA Local toll service (also called intra-Local Access and Transport Area (LATA), local long distance, or regional toll service) provides calling within a geographic area known as a LATA. Per-minute toll charges usually apply to these calls.
TERM DEFINITION
Local Exchange Access and Service Areas
Areas shall include the areas/zones coverage as currently defined by the incumbent local service provider(s) and/or the State PUC for the Site and shall be applied under the scope of this contract and provide a list of these local exchange access service areas and any updates as they accrue. When the Contractor provides services to a Government installation, the LATA boundary shall not be limited or restricted to a Contractor’s service area. Connection to intra-LATA exchange areas and with inter-LATA exchange carriers is required.
Measured Rate A message rate structure in which the monthly phone line rental includes a fixed rate on calls within a defined area. Measured services are often charged on the number of calls, the time of day, the distance traveled and/or the length of the call.
Non-Recurring Charges
A one-time fee IAW the established tariff rates at time of award that is associated with adding a local exchange service, including installment, activation and/or equipment.
Physical Security Actions that prevent the loss or damage of Government property.
Quality Assurance The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
Quality Control All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
Reliability The probability that a system will not fail during a specified period of time.
Resilience The ability of a system to recover to its normal operating form after a failure or an outage.
Session Initiation Protocol (SIP)
A communications protocol for signaling, call setup/teardown, and communication of telephone and Video Real-Time Systems over an IP Based Unified Communication System. (As defined by Internet Assigned Numbers Authority & Request for Comments).
Session Initiation Protocol (SIP) Trunking
A Voice over Internet Protocol (VoIP) and streaming media service Based on the SIP by which Internet telephone service providers (ITSPs).
TERM DEFINITION
SIP Trunk An IP Based virtual connector between Unified Communication
Systems designed to transport high-density unicast & multicast telephone/video traffic channels.
Traffic Analysis Inference of information from observable characteristics of data flow(s), such as the identities and locations of the source(s) and destinations(s), and the presence, amount, frequency and duration of occurrence.
TABLE B ACRONYMS:
ACRONYM EXTENDED
AF Air Force AFI Air Force Instruction BRI Basic Rate Interface BS Basic Services BTN Billing Telephone Number CSSR Call Setup Success Rate CFP Communications Focal Point CLEC Competitive Local Exchange Carrier CO Contracting Officer CPE Customer Premise Equipment CSL Commercial Subscriber Lines CSO Communications Services Officer DCO Dial Central Office DCR Dropped Call Rate DFARS Defense Federal Acquisition Regulation Supplement DID Direct In Dial DOD Department of Defense DP Dial Pulse DSN Defense Switching Network DSX Digital Signal Cross-Connect DTMF Dual Tone Multi-Frequency EBC Edge Boundary Controller FCC Federal Communications Commission FD Full Duplex FR Flat Rate FX Foreign Exchange GETS Government Emergency Telecommunications Service GS Ground Start HD Half Duplex IAW In Accordance With IC Incoming
ACRONYM EXTENDED
ILEC Incumbent Local Exchange Carrier ISDN Integrated Services Digital Network IT Information Technology LATA Local Access Transport Area LS Loop Start LTS Local Telecommunications Services MF Multi-Frequency MDF Main…