A2. PC_PWS_Hearing Booths.pdf
PDF 137 KB Posted
- Attached to
- hearing booth move
- Solicitation number
- FY26-W912K3001
- Issued by
-
Department of the Army National Guard
About this file
This is a Performance Work Statement for the relocation and calibration of eight mission-critical hearing booths from Building 34 to Building 42 during a building renovation project. The primary objectives are to relocate and re-calibrate the hearing booths to support hearing exams for mobilizations and medical readiness operations. The contractor must perform all disassembly, disconnection, calibration, reassembly, and connection work, with the option to subcontract as needed. All work must be completed during regular business hours and comply with current building and fire codes. The contractor is responsible for completing or subcontracting any required electrical work and collaborating with the customer to finalize the relocation to designated areas.
The project timeline requires equipment removal no later than March 28, 2026, to prevent interference with the Building 34 remodel project start date, with specific project schedules to be determined collaboratively between the customer and contractor prior to work commencement. Acceptance criteria include compliance with building and fire codes, functional electrical work and calibration, and proper relocation to agreed-upon designated areas. The customer is responsible for clearing existing items from both buildings to ensure proper spacing, designating booth locations, and providing building access during business hours. The budget will be determined based on the scope of work and agreed upon by both parties before work begins.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement
Relocation and Calibration of Hearing Booths from Building 34 to Building 42
Project Overview:
The purpose of this project is to relocate 8x mission critical Hearing Booths from Building 34 to Building 42 during the renovation project. This is essential for conducting hearing exams for mobilizations and medical readiness operations.
Scope of Work:
The contractor will perform the following tasks:
1. Hearing Booths
a. Relocate 8x Hearing Booths from Building 34 to building 42.
b. Re-calibrate 8x Hearing Booths in Building 42.
c. Collaborate with the customer to ensure relocation to proper location.
d. Perform or subcontract any required disassembly, disconnection, calibration, reassembly, and connection.
e. All work will be performed during regular business hours.
2. Customer Responsibilities:
a. Move all existing items from Building 34 and Building 42 to ensure proper spacing for relocations.
b. Designate locations for Hearing Booth location.
c. Provide access to the buildings during regular business hours.
3. Contractor Responsibilities:
a. Perform all relocation and calibration tasks as outlined in the scope of work.
b. Ensure all relocations and assemblies comply with current building and fire codes.
c. Complete or subcontract any required electrical work for hearing booths.
d. Collaborate with the customer to finalize the relocation.
4. Deliverables:
a. Relocate 8x Hearing Booths from Building 34 to Building 42.
b. Re-calibrate 8x Hearing Booths in Building 42.
5. Timeline:
a. All work will be completed during regular business hours.
b. The project timelines will be determined in collaboration with the customer and contractor prior to the start of the work.
c. Equipment must be removed NLT 28 March 2026 to ensure there are no interferences with the Building 34 remodel project start date.
6. Acceptance Criteria:
a. All relocation, reassembly, and calibration must meet current building and fire codes.
b. Any electrical work is completed and functional.
c. Calibration is functional.
d. All equipment is relocated to designated areas as per the agreed-upon design.
7. Budget:
a. The budget for this project will be determined based on the scope of work and agreed upon by both parties prior to the start of work.