A2 Bid Sheet MT Janitorial Svc.pdf
PDF 225 KB Posted
- Solicitation number
- W912P922R0030
About this file
This document contains a bid sheet and related federal contract opportunity notice. The bid sheet outlines line item pricing requirements for janitorial services at various facilities within the Mark Twain Lake recreation area and Clarence Cannon Dam over a potential five year period, including base and option years. Services required include cleaning project offices, recreation facilities such as restrooms and picnic shelters, the W. Boudreaux Memorial Visitor Center, and the Clarence Cannon Dam and Re-Regulation Dam. The related federal contract opportunity notice provides additional details, with the solicitation seeking proposals for janitorial services at the Clarence Cannon Dam and Mark Twain Lake under solicitation number W912P922R0030 issued by the U.S. Army Corps of Engineers, St. Louis District. The bid sheet and opportunity notice provide pertinent pricing, facility and service location details for a prospective contractor to submit a responsive proposal to the agency.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID SCHEDULE
Mark Twain Janitorial Services
Base Year $ ________________________
Optional Year 1 $________________________
Optional Year 2 $_________________________
Optional Year 3 $_________________________
Optional Year 4 $_________________________
Optional 6 Months $ _________________________
TOTAL CONTRACT AMOUNT $_________________________
PRICE BREAKDOWN
BASE YEAR
Line Item Description Quantity Unit Unit Price
Project Office (CLIN 1) 0001 Project Office 12 MO
Recreation Areas (CLIN 2-13)
M.
0002 Comfort Station Type I 2602 EA
Shower Bldg. Type I
EA
Bathhouse
Vault Toilet
Picnic Shelter
Trailer Dump
Grills/Braziers
Fountains/Hydrants
Adjust Boat Docks
55 Gallon Barrels
Fish Cleaning Stations
Litter Pickup
W. Boudreaux Memorial Visitor Center (CLIN 0014 Floors
14-28)
Seal Tile Floors
Community Room
Walls and Doors (Lower Level)
Walls and Windows (Upper Level)
Windows/Glass Doors (Lower Level)
Office Furniture/Fixtures
Display
Waste Receptacles
Sidewalks and Building Exterior
0024 Restrooms 193 EA
Lights (Lower)
Lights (Upper)
Fire Pits and Fire Place
Kitchen & Lunchroom
Clarence Cannon Dam and Re-Regulation Dam (CLIN 29) Clarence Cannon Dam and Re-
0029 Regulation Dam 12 MO
TOTAL BASE_______________
YEAR 1
Re
1001 Project Office 12 MO creation Areas (CLIN 2-13) 1002 Comfort Station Type I
W. Bou dreaux Memorial Visitor Center (CLIN
Floors
51-64, 67)
1015 Seal Tile Floors 2 EA
Restrooms
1029 Regulation Dam 12 MO
TOTAL OPTION YEAR 1
YEAR 2
2001 Project Office 12 MO
2002 Comfort Station Type I
2029 Regulation Dam 12 MO
TOTAL OPTION YEAR 2
YEAR 3
2007 Trailer Dump 107 EA
3001 Project Office 12 MO
3002 Comfort Station Type I
3025 Lights (Lower) 53 EA
3029 Regulation Dam 12 MO
TOTAL OPTION YEAR 3
YEAR 4
4001 Project Office 12 MO
4002 Comfort Station Type I
4016 Community Room 1 EA
4029 Regulation Dam 12 MO
TOTAL OPTION YEAR 4
CONTRACT TOTAL
6 MONTHS
5001 Project Office 12 MO
Recreation Areas (CLIN 2-13)
5002 Comfort Station Type I 2602 EA
Fountans/Hydrants
W. Boudreaux Memorial Visitor Center (CLIN 5014 Floors
5024 Restrooms 193 EA
5029 Regulation Dam 12 MO
TOTAL
File details come from the government source that posted it. Updated .