A2 Appendix D.pdf

PDF 163 KB Posted

Attached to
Janitorial Services at Clarence Cannon Dam & Mark Twain Lake
Solicitation number
W912P922R0030
Issued by

About this file

This document contains an inventory of facilities at the Clarence Cannon Dam and Mark Twain Lake project sites. The inventory lists various structures and amenities located across both sites, including the total numbers of comfort stations, bathhouses, showers, vault toilets, picnic shelters, grills, boat docks, waste receptacles, and fish cleaning stations. For the Clarence Cannon Dam facilities, the inventory catalogs items such as waste receptacles, light fixtures, stairways, floors, restrooms, generators, ventilation systems, and control rooms across eight floors of the dam as well as other exterior areas including the south abutment, intake gates, pier nose, and re-regulation dam. This appendix provides a comprehensive listing of pre-existing facilities at the dam and lake sites but does not specify any products or services required for the federal contract opportunity.

The related federal contract opportunity is a solicitation from the Department of the Army Corps of Engineers seeking proposals for janitorial services at the Clarence Cannon Dam and Mark Twain Lake locations. The solicitation number is W912P922R0030 and proposals are due by the specified response date. The opportunity is for janitorial services across the facilities inventoried in the appendix for the dam and lake sites.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Mark Twain Lake Project Facilities

Item M W

B

BG

U

W G

SS

ou th

W G

SN

or th

FR

En te r

FR

D

U

FR

J

FR

FR

FR

C

V

JS

D

U

JS

Be ac h

JS

BR

R

BD

U

R

BB

R an dG A

R

BD

R

R

BL

BS

R

BC

R

IC

En te r

IC

G

U

IC

BR

IC

Am p

IC

SR

IC

N

H

IC

F

IC

EP

IC

EB

R an dB ea ch

IC

H

I

IC

G

Aa nd

TD

R A

SF St ou t

BV H

F7

H F1

Pr oj ec t O ffi ce

Vi si to r C en te r

To ta l

Comfort Station 1 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1 2 20 Shower Building 1 1 1 2 1 1 2 1 1 1 12 Bathhouse 1 1 Vault Toilet 1 1 1 1 1 1 6 Picnic Shelter 1 1 1 3 1 1 1 1 10 Trailer Dump Station 1 1 1 3 Grills/Brazier 4 16 22 34 9 10 8 8 53 69 42 37 1 6 70 33 28 60 20 1 1 1 1 534 Fountains/Hydrants 2 1 1 1 2 1 1 9 Boat Docks 2 1 2 2 2 2 1 12 55 gal Barrels 2 2 3 15 2 2 7 2 1 36 Waste Receptacles 21 14 35 Fish Cleaning Stations 1 3

Clarence Cannon Dam and Re-Regulation Dam Facilities

Item W as te R ec ep ta cl es /T ra sh

B ar re l

Li gh t F ix tu re s

St ai rw ay s/ H an dr ai ls

/L an di ng s

In te rio r F lo or

G ut te rs

/D ra in s

Fl oo rs

R es tro om s

Ki tc he n/

Lu nc hr oo m

G en er at or S ur fa ce s

El ev at or

D ie se l S to ra ge /C on du it R oo m

Tr an sf or m er

D ec k

Ve nt ila tio n G ril ls a nd

D uc ts

D og

H ou se

Pi er

N os e

G at e H ou se

C on tro l R oo m

G en er at or R oo m

/B ot to m

F lo or

D am

E xt er io r

To ta l

First Floor 1 1 1 1 1 5 Second Floor 1 1 1 1 4 Third Floor 1 1 1 1 1 1 6 Fourth Floor 1 1 1 1 1 1 1 7 Fiftth Floor 1 1 1 3 Sixth Floor 1 1 Seventh Floor 1 1 2 Eighth Floor 1 1 1 1 1 5 South Abutment 1 1 1 3 Intake Gates & HPB#9 1 1 1 3 Dog Houses & Catwalk 1 1 2 4 Pier Nose Area 1 1 Re-Regulation Dam 1 1 1 1 1 5

In C on tra ct

Appendix D Facility Inventory

Appendix D

1 1

FacilityInventory

File details come from the government source that posted it. Updated .