This document is a Performance Work Statement (PWS) for a federal contract for Hazardous Waste Disposal services at the Occupational Safety and Health Administration's (OSHA) Salt Lake Technical Center (SLTC) facility. The contractor shall provide all necessary personnel, equipment, and services to dispose of hazardous waste, including transportation, packaging, labeling, and disposal. Key services include removal of hazardous waste such as acids, batteries, electronics, and respirators 2-4 times per year. The contract will be a one-year base period with four 12-month option periods. The government will evaluate quotes using the Best Value Trade-off Process, with questions due by September 16, 2024 and quotes due by September 18, 2024. The contracting agency is the Department of Labor Office of the Assistant Secretary for Administration and Management.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A19-Attachment 02 - QA Log - Responses 9-18-24.xlsx | XLSX spreadsheet | |
| 1605C1-24-Q-00133-0001.pdf | ||
| A-19-Attachment 06 - OSHA WASTE DISPOSAL LIST - 09-18-2024.xlsx | XLSX spreadsheet | |
| 1605C1-24-Q-00133.pdf | ||
| A19-Attachment 04 - Subcontracting Plan Template - Hazardous Material.docx | DOCX document | |
| A-19-Attachment 05 - Wage Determination 2015-5489 Rev 24.pdf | ||
| A19-Attachment 03 - Evaluation Criteria - Hazardous Material.docx | DOCX document | |
| A19-Attachment 02 - QA Log.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement (PWS)
Performance Work Statement (PWS) For Hazardous Waste Disposal base plus four (4) option periods
SLTC
PART 1
General Information
SLTC seeks Hazardous Waste removal services with capacity to cover removal from OSHA’s Salt Lake Technical Center (SLTC).
Description of Services/Introduction:
The contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and non-personal services necessary to Hazardous Waste disposal including shipping, packaging, labeling and disposal services for OSHA as defined in this Performance Work Statement, except as Specified in section C-3 as government furnished property and services. The contractor shall perform to the standards in this contract action.
Background:
OSHA’s Salt Lake Facility in Utah qualifies for a Very Small Quantity Generators (VSQG) status for hazardous waste. OSHA has purchased hazardous waste disposal services in the past by contract and by direct purchase when within purchase limits for these facilities.
The Hazardous Waste Disposal services will allow OSHA to dispose of hazardous materials The selected vendor(s) shall provide services to the OSHA SLTC.
Objectives:
Provide a Hazardous Waste Disposal at SLTC to dispose of hazardous waste requirements to include:
• Hazardous Waste checks against provided inventory or inventoried to ensure that all waste designated for removal is accounted for.
•All Hazardous Waste will be removed in a timely manner (30 days from request) to ensure that Very Small Quantity Generator (VSQG) status is secure.
•Ability to remove and dispose of hazardous waste from SLTC on an on-call basis •Ability to dispose of batteries and electronics.
•Ability to dispose of old escape respirators (KO2 for example) •Package and hazardous waste properly for shipment and disposal •Ensure proper chain of custody is met for removal and disposal of hazardous waste for analysis for legal purposes.
• Package and Ship the Dangerous Goods from the Salt Lake Technical Center (SLTC)
• Package and label the dangerous good properly for shipment
• Prepare the proper shipping papers for shipment of the dangerous goods
• Ensure proper chain of custody is met for shipments of dangerous goods for analysis for legal purposes.
Scope:
Provide the following services or equivalent 2-3 times per year at OSHA SLTC
Services include Transportation of Hazardous Waste Materials from VSQG to disposal sites Chemist Time and Services Manifest Fees State and Federal Hazardous Waste transportation and disposal fees.
Labpack Acid & Acid Compatibles for Incineration Labpack Basic & Basic Compatibles for Incineration Labpack Mercury Salts And Solutions For Incineration Labpack Organics for Incineration Labpack Required To Be Packaged Alone Per DOT Labpack Boxes various sizes packing and disposal services Polymer and metal drums of various sizes packing and disposal services Vermiculite and other sorbents Utilized and exhausted electrochemical Dragersonsors ™ Utilized and exhausted sealed oxygen sensors that contain lead and metal acetates Lithium-Ion Batteries Mercury containing bulbs D-List Waste removal P-List Waste removal U-List Waste removal Package and ship Dangerous Goods to include excepted quantities to regulated limits of the Dangerous Goods as prescribed the DOT and IATA for the material being shipped.
Properly package Dangerous Goods for shipment Properly label Dangerous Goods for shipment Prepare proper shipping papers for Dangerous Goods shipments
Period of Performance:
The period of performance shall be for one (1) Base Period of 12 months and four (4) 12-month option periods. The Period of Performance reads as follows:
| Base Period: | 30 Sep 2024 – 30 June 2025 |
| Option Period I: | 01 July 2025 – 30 June 2026 |
| Option Period II: | 01 July 2026 – 30 June 2027 |
| Option Period III: | 01 July 2027 – 30 June 2028 |
| Option Period IV: | 01 July 2028 – 30 June 2029 |
The government reserves the right to extend the term of this contract action at the prices set forth in Section B in accordance with the terms and conditions contained in clause 52.217-9 entitled, “Option to Extend the Term of the Contract”.
General Information Quality Control:
The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract. As a minimum, the contractor shall develop quality control procedures that address the areas identified in Technical Exhibit 1, “Performance Requirements Summary”. After acceptance of the quality control plan, the contractor shall receive the Contracting Officer’s acceptance in writing of any proposed change to his QC system.
Quality Assurance:
The government shall evaluate the contractor’s performance under this contract action in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s). Quality Control Plan is for waste to be removed within 60 days’ notice of identification of waste starting 60 days after contract award. For dangerous goods shipping the plan is for goods to be shipped within 5 days’ notice of identification starting 60 days after contract award.
Government Remedies:
The Contracting Officer shall follow FAR 52.212-4, “Contract Terms and Conditions-Commercial Items” or 52.246-4, “Inspection of Services-Fixed Price” for contractor’s failure to perform satisfactory services or failure to correct non-conforming services.
Recognized Holidays:
Contractor is not required to perform services on holidays.
| New Year’s Day | Labor Day | |
| Martin Luther King Jr.’s Birthday | Columbus Day | |
| President’s Day | Veteran’s Day | |
| Memorial Day | Thanksgiving Day | |
| Juneteenth Day | Christmas Day |
Independence Day Hours of Operation:
The contractor is responsible for conducting performance between the hours of 8:00 AM - 4:30 PM MST. Monday thru Friday, except Federal holidays or when the government facility is closed due to local or national emergencies, administrative closings, or similar government directed facility closings. The contractor must at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this statement of work when the government facility is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential. Telecommuting or “work at home” is not authorized under this contract action unless under emergency situations as determined by the Contracting Officer’s Representative (COR).
Place of Performance:
The work to be performed under this contract action will be performed at OSHA’s Salt Lake Technical Center (SLTC).
Type of Contract:
The government anticipates award of a fixed price contract.
Security Requirements:
Not applicable
Physical Security.
The contractor shall be responsible for safeguarding all government property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.
Key Control.
N/A
Lost Keys N/A
Key Use N/A Lock Combinations.
N/A Conservation of Utilities.
The contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.
Special Qualifications:
Contractors shall meet the requirements of DOT and IATA training and shall ensure the transporters of Dangerous Goods are qualified to ship Dangerous Goods and further ensure the transporters of Hazardous Waste are qualified to dispose of such following all guidance of the Environmental Protection Agency Post Award Conference/Periodic Progress Meetings:
The contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The Contracting Officer, Contracting Officer’s Representative (COR), and other government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings, the Contracting Officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.
Contracting Officer’s Representative:
A COR will be delegated separately.
Key Personnel:
The follow personnel are considered key personnel by the government: Contract Manager and Alternate, The Contract Manager and Alternate. The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the Contracting Officer.
The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract action. The contract manager or alternate shall be available between 8:00 a.m. to 4:30p.m., Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons. Qualifications for all key personnel are listed below: Contract Manager and Alternate, The Contract Manager and Alternate must have familiarity of hazardous waste removal and documentation – following all regulations and guidance of the Environmental Protection Agency, and Department of Transportation (DOT) and are Certified to dispose of hazardous material and meet International Air Transportation Association (IATA) currently used to ship dangerous goods. Certified to ship dangerous goods and hazardous materials. A Field Chemist must be present to oversee the collections and packaging of hazardous waste for disposal.
Identification of Contractor Employees:
All contract personnel attending meetings, answering government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed. Contractor personnel may be required to obtain and wear badges in the performance of this service.
Organizational Conflict of Interest:
Contractor and subcontractor personnel performing work under this contract action may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI), as defined in FAR Subpart 9.5. The contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.
Phase In/Phase Out Period N/A
Part 2 Definition & Acronyms
CCR. Central Contractor Registration (CCR) database
Contracting Officer’s Representative. A representative from the requiring activity assigned by the Contracting Officer to perform surveillance and to act as liaison to the contractor
Defective Service. A service output that does not meet the standard of performance associated with it in the Performance Work Statement.
DOL. Department of Labor
OSHA. Occupational Safety and Health Agency
PWS. Performance Work Statement
Quality Assurance. Those actions taken by the government to assure services meet the requirements of the Performance Work Statement.
Quality Assurance Surveillance Plan. An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
Quality Control. Those actions taken by a contractor to control the performance of services so that they meet the requirements of the PWS.
SLTC. Salt Lake Technical Center – A laboratory located at 8660 S Sandy Parkway, Sandy UT 84070
VSQG. Very Small Quantity Generator
Part 3 Government Furnished Property, Equipment, And Services
0. General:
The government will provide, the facilities, equipment, materials, and/or services listed.
below.
N/A
0. Equipment:
N/A
0. Services:
3.3.1 Utilities:
N/A.
0. Facilities:
Onsite. The government will furnish all necessary workspace required for the contractor to support the effort(s) outlined in this PWS, to include desk space, telephones, computers and other items necessary to maintain an office environment.
Part 4 Contractor Furnish Items and Services
4.1 General:
Except for those items specifically stated to be government furnished in Part 3, the contractor shall furnish all other items required to perform the services in this PWS.
4.2 Clearance:
(Not Applicable)
Part 5 Specific Tasks
5.1 Services:
The contractor shall provide services for [Insert a detailed description of the services and/or tasks to be provided that describes the required results in clear, specific, and objective terms with measurable outcomes.]
The contractor shall provide the following services up to 4 times per year at OSHA SLTC:
Description Transportation of Hazardous Waste Materials from VSQG to disposal sites (2-4 times per year at OSHA SLTC) Chemist Time and Services Manifest Fees State and Federal Hazardous Waste transportation and disposal fees.
Labpack Acid & Acid Compatibles for Incineration (2-4 times per year at OSHA SLTC) Labpack Basic & Basic Compatibles for Incineration (2-4 times per year at OSHA SLTC) Labpack Mercury Salts And Solutions For Incineration (2-4 times per year at OSHA SLTC) Labpack Organics for Incineration (2-4 times per year at OSHA SLTC) Labpack Required To Be Packaged Alone Per DOT (2-4 times per year at OSHA SLTC) Labpack Boxes various sizes packing and disposal services (2-4 times per year at OSHA SLTC) Polymer and metal drums of various sizes packing and disposal services Vermiculite and other sorbents Utilized and exhausted electrochemical Dragersonsors ™ Utilized and exhausted sealed oxygen sensors that contain lead and metal acetates Lithium-Ion Batteries Mercury containing bulbs (2-4 times per year at OSHA SLTC) D-List Waste removal (2-4 times per year at OSHA SLTC) P-List Waste removal (2-4 times per year at OSHA SLTC) U-List Waste removal (2-4 times per year at OSHA SLTC) Dispose of batteries and electronics. (2-4 times per year at OSHA SLTC) Dispose of old escape respirators (KO2 for example) (2-4 times per year at OSHA SLTC)
The contractor shall provide services:
• Package and ship Dangerous Goods to include excepted quantities to regulated limits of the Dangerous Goods as prescribed the DOT and IATA for the material being shipped.
•Properly package Dangerous Goods for shipment •Properly label Dangerous Goods for shipment •Prepare proper shipping papers for Dangerous Goods shipments
Part 6 Applicable Publications
6.1 Publications Applicable to This PWS:
N/A
Part 7 Technical Exhibit Index
1. Technical Exhibit 1 – Performance Requirements Summary
2. Technical Exhibit 2 – Deliverables Schedule
Technical Exhibit 1
Performance Requirements Summary The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objective Documentation of all waste removed from all locations.
Standard 100 % inspection Performance Threshold Zero deviation from standard
Method of Surveillance 100% inspection by COR
Technical Exhibit 2
Deliverables Schedule
| Deliverable |
| Frequency |
| # Of Copies |
| Medium/Format |
| Submit To |
| Report of waste removed, and final storage and destruction locations provided. |
| Within 30 days of any waste removed |
| 3 originals and 3 copies if the originals are not electronic. |
| May be paper or USB drive in MS Word or PDF |
1 original to the director of SLTC.
| Report of shipping of dangerous goods |
| Within 30 days of any waste removed |
| 3 originals and 3 copies if the originals are not electronic. |