A14-Bid_Schedule.pdf
PDF 171 KB Posted
- Attached to
- IL-CRAB ORCHARD NWR-ROAD SPEED TABLES
- Solicitation number
- 140FC224Q0031
About this file
This document is a Bid Schedule for a federal contract opportunity related to road construction and improvements at the Crab Orchard National Wildlife Refuge in Illinois. The Bid Schedule lists various line items and corresponding quantities, unit prices, and total amounts for the required work, including mobilization, contractor staking, testing, pavement milling, asphalt paving, topsoil, erosion control, restoration, pavement markings, and traffic signs. The total bid amount for the Route 200 - Campground Road project is requested. The contract will be awarded based on the evaluation criteria in Section M of the solicitation. Incomplete bids will be considered non-responsive, and payment will be made for the actual work performed based on the listed unit or lump sum prices.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| clausesx_0003.pdf | ||
| Sol_140FC224Q0031_Amd_0003.pdf | ||
| Sol_140FC224Q0031_Amd_0002.pdf | ||
| Sol_140FC224Q0031_Amd_0001.pdf | ||
| A06-Maps.pdf | ||
| Construction_Contract_Administration.docx | DOCX document | |
| Sol_140FC224Q0031.pdf | ||
| A04-Specifications.pdf | ||
| Wage_Determination_gov.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Name of Offeror or Contractor
Bid Form
Item No. Supplies/Services Quantity Unit Unit Price Total Amount
Furnish all labor, tools, equipment, materials, superintendence and transportation necessary to construct the project described in Block 10 of Page A1, Solicitation, Offer, and Award, Standard Form 1442 in accordance with the Technical Specifications, Drawings, and terms and conditions contained herein as follows:
Basic Contract
Route 200 – Campground Road
Item 45 Mobilization and Demobilization 1 L.S. $_________ $________
Item 46 Contractor Staking 1 L.S. $_________ $________
Item 47 Testing and Inspection 1 L.S. $_________ $________
Item 48 Pavement Milling 1 L.S. $_________ $________
Item 49 Hot-Mix Asphalt Surface 27 TON $_________ $________
Item 50 Hot-Mix Asphalt Binder 64 TON $_________ $________
Item 51 Topsoil 1 L.S. $_________ $________
Item 52 Erosion Control 1 L.S. $_________ $________
Item 53 Restoration 1 L.S. $_________ $________
Item 54 Pavement Markings 1 L.S. $_________ $________
Item 55 Traffic Signs 1 L.S. $_________ $________
TOTAL BID AMOUNT (Route 200 – Campground Road):
BID SCHED_Revised Nov2023.docx
BID SCHED_Revised Nov2023.docx Page 2 of
Award of contract will be made in accordance with Section M, Clause M-1 “Evaluation and Award.” Incomplete bids will be considered non-responsive. If estimated quantities are listed, Bidders must only bid estimated quantities listed. These quantities indicated are the Government’s best estimate of actual quantities needed to complete the work. Payment will be made for actual amount of work done on the basis of unit or lump sum prices listed.
Basic Contract
File details come from the government source that posted it. Updated .