A04-Specifications.pdf
PDF 711 KB Posted
- Attached to
- IL-CRAB ORCHARD NWR-ROAD SPEED TABLES
- Solicitation number
- 140FC224Q0031
About this file
This document appears to be a project manual for the Crab Orchard National Wildlife Refuge Parking And Roadway Improvements project. The key details are:
The project includes various site work items such as mobilization and demobilization, pavement milling, hot-mix asphalt paving, topsoil placement, erosion control, restoration, pavement markings, and traffic sign installation. Measurement and payment for the hot-mix asphalt paving and aggregate base items will be based on tonnage and weight, respectively. All other work items will be paid on a lump sum basis. The contractor is responsible for obtaining all required permits, developing a traffic control plan, following safety requirements, and coordinating with the refuge staff. The government will not pay for materials placed over the specified quantities in the bid schedule unless agreed to through a formal modification. The project manual also includes general requirements, submittal, and project closeout information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| clausesx_0003.pdf | ||
| Sol_140FC224Q0031_Amd_0003.pdf | ||
| Sol_140FC224Q0031_Amd_0002.pdf | ||
| Sol_140FC224Q0031_Amd_0001.pdf | ||
| A06-Maps.pdf | ||
| A14-Bid_Schedule.pdf | ||
| Construction_Contract_Administration.docx | DOCX document | |
| Sol_140FC224Q0031.pdf | ||
| Wage_Determination_gov.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S.
FISH & WILDLIFE
SERVICE
Station Name/Address:
CRAB ORCHARD NATIONAL WILDLIFE REFUGE
8588 Route 148, Marion, IL 62959
Project Name:
PROADWAY
IMPROVEMENTS
PROJECT MANUAL
Page J - 1
PART III, SECTION J
LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
INDEX
TECHNICAL PROVISIONS/SPECIFICATIONS
DIVISION 1 - GENERAL REQUIREMENTS
SECTION 01100 SUMMARY OF THE WORK
SECTION 01310 PROJECT COORDINATION
SECTION 01330 SUBMITTALS
SECTION 01420 DEFINITIONS AND STANDARDS
SECTION 01770 PROJECT CLOSEOUT
DIVISION 2 – SITE CONSTRUCTION
SECTION 02240 DEWATERING
SECTION 02741 HOT-MIXED ASPHALT PAVEMENT
SECTION 02890 TRAFFIC SIGNAGE
DIVISION 3 THRU 16 – NOT USED
ATTACHMENTS
SUBMITTAL REGISTER
PRECONSTRUCTION SAFETY CHECKLIST
DRAWINGS
Drawing Number Description Sheet
3R-IL-415-1351 COVER SHEET, TITLE, COUNTY MAPS 1 OF 15
3R-IL-415-1352 DRAWING INDEX 2 OF 15
3R-IL-415-1353 GENERAL PLAN 3 OF 15
3R-IL-415-1354 SHEET NOT USED/ISSUED N/A
3R-IL-415-1355 SHEET NOT USED/ISSUED N/A
3R-IL-415-1356 SHEET NOT USED/ISSUED N/A
3R-IL-415-1357 SHEET NOT USED/ISSUED N/A
3R-IL-415-1358 SHEET NOT USED/ISSUED N/A
Page J - 2
3R-IL-415-1359 SHEET NOT USED/ISSUED N/A
3R-IL-415-1360 SHEET NOT USED/ISSUED N/A
3R-IL-415-1361 SHEET NOT USED/ISSUED N/A
3R-IL-415-1362 SHEET NOT USED/ISSUED N/A
3R-IL-415-1363 SPEED TABLE AND SIGNAGE PLAN 13 OF 15
3R-IL-415-1364 SPEED TABLE DETAILS 14 OF 15
3R-IL-415-1365 DETAILS 15 OF 15
DIVISION 1 SECTION 01100
GENERAL REQUIREMENTS SUMMARY OF THE WORK
01100-1
PART 1 - GENERAL
1.1 Project Title: Crab Orchard National Wildlife Refuge
Parking And Roadway Improvements.
1.2 Work Under These Specifications
A. Contractor shall furnish materials, labor and equipment for the work described below. Measurement and payment shall be as defined below and as indicated in the project plans and specifications. All work items that are not specifically called out below for payment are considered incidental and no direct compensation will be provided.
B. Base Bid
Route 200 (CAMPGROUND ROAD)
1. Item 45 – Mobilization and Demobilization. This work includes, but is not limited to, project mobilization and demobilization, project management, oversight, traffic control plans, permitting, and cleanup.
This item will not be measured for separate payment and will be paid for on a lump sum basis.
2. Item 46 – Contractor Staking. This work includes, but is not limited to, any survey work required to execute the construction of this contract.
This item will not be measured for separate payment and will be paid for on a lump sum basis.
3. Item 47 – Testing and Inspection. This work includes, but is not limited to, all testing and inspection work required to execute the construction of this contract.
This item will not be measured for separate payment and will be paid for on a lump sum basis.
01100-2
4. Item 48 – Pavement Milling. This work includes, but is not limited to, milling existing bituminous pavement 1.5” in depth and disposing of the milled pavement off of the refuge property.
This item will not be measured for separate payment and will be paid for on a lump sum basis.
5. Item 49 – Hot-Mix Asphalt Surface. This work includes, but is not limited to, installing hot-mix asphalt surface course pavement on existing, milled and newly constructed pavements, prime coat, and milling of areas where new pavement buts against existing as identified in the drawings, and all traffic control.
Measurement and payment of this work will be made by the tonnage of Hot-Mix Asphalt Surface Course material installed and accepted. The pay weights for pavement will be the scale weight of the material delivered as stated on delivery trucks scale ticket.
Weight tickets shall be provided to the Government at the end of each day’s operations. The Government will not pay for material placed over the unit price quantities provided in the Bid Schedule unless agreed to prior to placement of the material through the formal Modification process.
6. Item 50 – Hot-Mix Asphalt Binder. This work includes, but is not limited to, installing hot-mix asphalt binder pavement on new or existing base material, and prime coat.
Measurement and payment of this work will be made by the tonnage of Hot-Mix Asphalt Binder Course material installed and accepted. The pay weights for pavement will be the scale weight of the material delivered as stated on delivery trucks scale ticket.
Weight tickets shall be provided to the Government at the end of each day’s operations. The Government will not pay for material placed over the unit price quantities provided in the Bid Schedule unless
01100-3 agreed to prior to placement of the material through the formal Modification process.
7. Item 51 – Topsoil. This work includes but is not limited to furnishing, placing and shaping topsoil in areas identified in the drawings and to a depth indicated in the drawings and details.
This item will not be measured for separate payment and will be paid for on a lump sum basis.
8. Item 52 – Erosion Control. This work includes, but is not limited to, providing all erosion control elements for the project, including, silt fence, wildlife friendly temporary erosion control blankets, temporary mulch and seeding, maintaining erosion control measures, and removal of erosion control measures when turf has been established and accepted. The Contractor shall obtain all permits and clearance required to meet all erosion and sediment control requirements including the production and maintenance of the SWPP plans for construction purposes.
This item will not be measured for separate payment and will be paid for on a lump sum basis.
9. Item 53 – Restoration. This work includes, but is not limited, to fine grading topsoil, seed bed preparation, furnishing seed, seeding, fertilizing, mulching, watering and providing warranty work as necessary.
This item will not be measured for separate payment and will be paid for on a lump sum basis.
10. Item 54 – Pavement Markings. This work includes, but is not limited to, installing all epoxy pavement markings, including striping and symbols, as shown in the plans.
01100-4
11. Item 55 – Traffic Signs. This work includes, but is not limited to, furnishing and installing traffic and pedestrian signs, posts, and fasteners within the project limits as indicated in the plans.
1.3 Location and Inspection Of Site
A. The work site is located at Crab Orchard National Wildlife Refuge near Marion, Illinois. The mailing address is shown on the Solicitation, Offer, and Award (Standard Forms 1442 or, 18 block 9) as attached to this Invitation. The Station Manager may be contacted for further information at the above referenced address or by telephone at (618) 997-3344.
B. All prospective bidders/quoters, contractors, subcontractors, and related persons are encouraged to visit the site(s) of the proposed Work and to assess the location(s) and extent of the Work prior to submitting bids/quotes. Persons may inspect the site by contacting the Station Manager.
1.4 Specifications and Drawings for Construction
A. The successful bidder will be provided, upon request, up to 5 sets of additional full size prints of the contract drawings as necessary for execution of this contract. These drawings will be provided at no additional cost to the successful bidder/quoter.
B. Exact location of all affected utilities will be the responsibility of the contractor. Drawings may not completely show all utilities. Site verification is required in addition to contacting any local authorities and utility companies to determine exact locations of utilities.
C. In case of difference between drawings and specifications, the specifications shall govern.
01100-5
1.5 Work Not Included In This Contract
A. All items indicated "NIC" on drawings or in specifications are items not included in this contract.
B. Work in place is generally shown as "Existing" on the
Contract Drawings.
B. Work to be performed under other contracts and not included as part of this contract is generally shown as "By Others" on the Contract Drawings.
1.6 Items Provided By The Government
A. Work to be accomplished by the Government or manufactured items to be provided by the Government are generally shown as "By Government" on the Contract Drawings.
1. Unless specifically provided herein, no materials or equipment shall be furnished by the Government under this Contract.
1.7 Engineering Services:
A. The Government has established a baseline and a benchmark for this project. Prior to mobilization the Contractor shall verify all benchmarks. If benchmarks are damaged, missing, or disturbed notify the COR.
The drawings relate the project to the baseline and benchmark. From this baseline and benchmark the Contractor shall furnish and place all stakes, marks, and templates required for the performance and completion of the work. Any baseline monuments or benchmarks disturbed or removed during construction shall be reset by the Contractor at their expense.
01100-6
1.8 Temporary Facilities
A. Maintain and restore all government roads, service areas and utilities used to pre-construction condition.
B. The Contractor shall provide, and maintain, temporary toilet facilities at the project site for the duration of the project.
1.9 Site Access and Right of Way
A. The construction access limits on Government property will be established by the Government and the Contractor shall be responsible for complying with these limits and governing all work accordingly. All temporary access roads shall be removed following work completion unless directed otherwise by the Contracting Officer.
B. All bidders are reminded that they are responsible for contacting the local entity such as township, county, or state having jurisdiction in the project vicinity to insure bidders/quoters are aware of any requirements of the local entity. These requirements are between the entity and the bidder. Load limits and other restrictions shall be obeyed. If the Contractor proposes to cross private property, permission must be obtained from the owner to use private property or roads in the conduct of the Work.
C. Work scheduled on Saturdays, Sundays, Federal Holidays or other than normal working hours shall be approved in advance by the Government.
D. No work shall be performed between the dates of March 23, 2024 through April 7, 2024 that will require Government oversight/Involvement.
1.10 Safety - In addition to FAR 52.236-13 Accident Prevention
01100-7
A. Contractor shall fill out and submit the “Preconstruction Safety Checklist” to the Contracting Officer (CO) prior to beginning construction. The Contractor shall work with the COR and refuge staff on safety requirements throughout the duration of the Contract.
B. The contractor shall designate a safety officer to ensure a safe work site. The safety officer shall perform daily work site inspections to assure compliance with all safety regulations and standards.
C. The Contractor’s Safety Plan shall be available on-site. The Contractor shall provide Safety Data Sheets (SDS) for all hazardous materials brought on-site.
SDS shall be made available in a conspicuous location.
D. All equipment and work activities shall comply with OSHA Regulations and all accidents incidental to work performed under this contract shall be reported in accordance with OSHA reporting requirements.
Additionally a copy of the accident report shall be provided to the Contracting Officer.
E. The contractor shall provide and install barricades, signs, or other warning devices to delineate the construction area and restrict public access to the construction site. Follow Manual of Uniform Traffic Control Devices (MUTCD).
F. Provide at least one non-freezing-type fire extinguisher in each workshop and shed used for storage of materials on the premises. Place in location readily accessible to workers.
G. Provide at least one non-freezing-type fire extinguisher of the appropriate class for each group of workers performing flammable procedures.
H. Provide and maintain a basic first aid kit for use of workers.
01100-8
(a) Provide first aid supply commensurate with size of project with items necessary for first aid treatment of all injuries. The first aid supply shall include items identified on SDS (see paragraph B of this section) in applicable locations.
(b) Advise all workers of the location of first aid supplies.
(c) Post telephone numbers of nearest hospital or ambulance service and fire station in conspicuous location. Advise all workers of location of telephone numbers.
I. Provide necessary Personnel Protective Equipment (PPE) as identified by SDS and OSHA regulations. Provide documentation, workers have been trained in use of PPE prior to individual use.
J. The contractor shall contact JULIE to locate all utilities prior to performing any excavation operations.
K. There is a possibility of finding unexploded ordinance on the refuge. Should the Contractor find anything suspicious during construction operations, the Contractor shall immediately stop operations and report the suspicious item to the refuge manager for direction.
1.11 Equipment Cleaning
A. The Contractor shall clean all equipment prior to equipment coming on site to prevent the transport and spread of invasive species.
1.13 EXISTING ROADWAYS AND OTHER ITEMS
A. Contractor shall provide equipment of sufficient size/weight to not damage existing infrastructure.
Existing roadways or other infrastructure items that
01100-9 are damaged due to the Contractor’s operations shall be repaired by the Contractor at their expense.
1.14 WASTE REDUCTION PLANS
A. Contractor shall provide a Waste Reduction Plan (FAR Clause 52.223-10) for demolition and construction to divert as much material as feasibly possible to recycling or reuse. The waste diversion goal for the Project shall be 50%. The Contractor shall recycle as much material as possible to reduce the amount of material being sent to landfills.
1.15 Hazardous Materials
A. The Contractor shall not use any products containing asbestos, cadmium, chromium, or lead. If products installed are found to contain any of these items, the Contractor shall be responsible for removing and replacing these items with products not containing asbestos, cadmium, chromium, or lead at the Contractor’s expense.
PART 2 - PRODUCTS (Not Applicable)
PART 3 - EXECUTION (Not Applicable)
(END OF SECTION 01100)
DIVISION 1 SECTION 01310
GENERAL REQUIREMENTS PROJECT COORDINATION
01310-1
1.1 Jobsite Administration - Superintendence, Subcontract
administration and Quality Control, is the responsibility of the Contractor.
A. Final decisions relative to items in conflict shall be made by the Contracting Officer.
B. The Government shall have the authority to temporarily suspend the Work for such time as necessary because of the failure on the part of the Contractor to perform any of the provisions of the Contract. No extension of contract performance time will be permitted until the Government determines that the deficiencies in performance, which caused the temporary suspension, have been corrected.
C. The Contractor shall have responsible superintendence on site during all project operations. Contractor shall notify Government of any changes of superintendents.
D. The Contractor shall notify the COR at least ten (10) days prior to the anticipated date of completion of all Work specified herein. Upon completion of the Work, the COR shall proceed with the final inspection which shall be completed as promptly as practicable.
The time required for such inspection and for performing any corrective Work shall be included in the contract performance time.
1.2 Modification/Change Order procedures
A. In the event of the need for a Change Order, the Contractor will receive a letter requesting a price quote for proposed changes to the Contract.
B. For evaluation purposes, the Contractor's quote shall be broken down to show the costs of labor and materials for each proposed category of Work included
01310-2 with the change, along with the total cost for Contractor's overhead, profit, and bond for the proposed changes.
C. All Contract time extensions required as a result of a proposed change must be justified and supported in detail at the time of the proposal.
1.3 Preconstruction Conference
A. Soon after award of the Contract and prior to commencing construction, the Contractor and any subcontractors shall attend a preconstruction conference with representatives of the Government.
Timely notification of the meeting will be given to the Contractor. Time, date, and place of the conference will be determined by the Contracting Officer. Requirements pertaining to Contract administration, construction operations and the project schedule will be discussed. The project schedule shall be in accordance with Section 01330.
The Preconstruction Safety Checklist shall be submitted for review during this conference.
1.4 Progress Meetings
A. Periodic general project meetings will be conducted with a representative of the Contractor at the project site or by telephone by the Government's representative for the purpose of coordinating, expediting, and assessing the work progress.
B. The Contractor shall provide reports of progress on the project, discuss the work schedule for the coming period and present all conflicts, discrepancies or other difficulties for resolution. A record of discussions and decisions will be prepared by the Government and distributed to those attending and others affected.
01310-3
PART 3 - EXECUTION (not Applicable)
(END OF SECTION 01310)
DIVISION 1 SECTION 01330
GENERAL REQUIREMENTS SUBMITTALS
01330-1
1.1 General:
A. Refer to submittal register or technical specifications for all submittals required.
B. When specifically requested by the Contracting Officer
(CO), Contractor’s Officer’s Representative (COR) or the Government’s Construction Inspector, the Contractor shall provide copies of manufacturer's written installation instructions and/or recommendations for review and approval prior to accomplishing equipment installation.
1.2 Submittal Register:
A. A submittal register, listing items requiring submittals under this solicitation, is provided as an attachment to this document. The Contractor shall provide all required submittals to the COR within 30 days of award except for items noted otherwise on the submittal register.
B. Digital submittals are allowed. If hard copy submittals are provided, furnish a minimum of four copies of all required submittals. Three copies will be retained by the Government. The remaining copies will be returned to the Contractor.
C. The approval of submittals shall not relieve the
Contractor to comply with the terms and conditions of the Contract Drawings and Specifications. The Contractor shall be responsible to determine correct dimension, design, connection, detail and satisfactory construction of all Work.
1.3 Project Schedule: Contractor shall provide as required by
Federal Acquisition Regulation (FAR) clauses.* In addition to the schedule requirements noted in the FAR, the Contractor shall update the schedule on a weekly basis and
GENERAL REQUIREMENTS SUBMITTALS
01330-2 provide the updated schedule to the COR on a weekly basis if it changes from the prior submitted schedule.
1.4 Price Breakdown - Lump Sum Items: Contractor shall provide as required by FAR clauses. *
1.5 Subcontractor's List
A. Submit a list of subcontractors who will be working on the project.
1.6 Submittal of Progress Payment Certificate: Contractor shall provide as required by FAR clauses. *
1.7 Guarantees, Warranties And Certificates: Refer to Section
01770
1.8 Operating And Maintenance Instruction: Refer to Section
01770
1.9 Delivery Tickets
A. The Contractor shall submit to the Government's on site representative, one legible copy of each delivery ticket for all material delivered to the construction site.
B. The delivery ticket shall show brand name, catalog number, and number/quantity of items received and other relevant information as described in specific sections of these specifications.
C. If Government Representative is not on site, all material tickets for the week shall be collected by the Contractor and provided to the COR (at the COR’s office in Bloomington, Minnesota) by the following Tuesday.
1.10 Waste Manifests and Disposal Tickets
GENERAL REQUIREMENTS
SUBMITTALS
01330-3
A. The Contractor shall submit copies of all waste manifests as well as waste disposal tickets.
B. Manifests shall state type of waste (i.e., construction debris, hazardous asbestos, etc.), quantity of material disposed, location of disposal, landfill designation, EPA registration of landfill, and EPA registration for transportation of any hazardous wastes.
C. Waste disposal tickets shall state the type of waste, location of disposal, landfill designation, and quantity of material disposed
1.11 Testing Reports: The Contractor shall submit all testing reports as described in specific sections of these specifications.
1.12 Traffic Control Plan: Contractor shall submit a traffic
control plan to demonstrate to the Government how they anticipate handling traffic during the course of construction. This plan shall be submitted by the Contractor prior to any site disturbance. This plan shall be reviewed by the Government and all changes requested by the Government shall be made by the Contractor. The Contractor shall provide access through the project site for traffic at all times during construction.
* The applicable FAR clauses will be provided in full text to the resultant contractor at the pre-construction conference.
(END OF SECTION 01330)
DIVISION 1 SECTION 01420
GENERAL REQUIREMENTS DEFINITIONS AND STANDARDS
01420-1
1.1 Regulatory Requirements
A. All work shall be accomplished in strict accordance with OSHA and all other regulations, codes, and laws in effect at the time the work is performed for the location where it is to be performed.
1.2 Means and Methods
A. Means and methods used in the performance of this Contract must be in accordance with all applicable Federal Acquisition Regulations in addition to OSHA regulations, 29 Code of Federal Regulations, acceptable industry practices as recognized by societies, associations, building codes, manufacturers’ specifications and any applicable state safety and health requirements.
1.3 Permits
A. All permits required to support construction activities such as road permits for oversize, overweight vehicles and equipment, bridge permits, and utility hookup permits, shall be obtained and paid for by the Contractor.
B. The Contractor shall obtain all Erosion and Sediment Control permits as required by Federal, State, County and Local regulations and laws. The Contractor shall prepare the SWPP plan and update the SWPP throughout the entire length of Construction.
(END OF SECTION 01420)
DIVISION 1 SECTION 01770
GENERAL REQUIREMENTS PROJECT CLOSEOUT
01770-1
1.1 Manufacturer's Specifications
A. The installation of manufactured products and equipment, together with all associated parts, shall be in conformance with the manufacturer's recommendations, and code requirements. All installations shall be complete and ready for immediate use, and every part required for proper operation of the manufacturer's equipment shall be provided. Following the completion of the Work under this Contract, all installed equipment shall be tested for proper operation and compliance with the Contract.
1.2 Final Inspection
A. The Contractor shall request a final inspection in writing at least ten (10) days prior to the anticipated date of completion.
B. Work will not be considered ready for final inspection until all the Work has been completed and the Contractor has certified that all items are properly operating and in strict compliance with all Contract terms and conditions.
C. The Contractor or the project supervisor shall be at the job site during the final inspection.
1.3 Tests
A. Complete all tests required to prove actual operating performance of equipment and systems incorporated into the project.
B. Submit reports of all tests to the Contracting Officer prior to final payment.
C. Provide any regulatory acceptance documents in cases of cleanup.
1.4 Maintenance and Operating Instructions
01770-2
A. Submit three (3) final copies of all operating, maintenance instructions and parts lists for all equipment and systems that require adjustment, servicing, and attention for proper operation.
Include all information necessary for proper operation of equipment. Use simple, non-technical language where possible. Provide all necessary diagrams and schematics required by repairmen. Any hazards likely to occur in operation of equipment shall be pointed out to avoid improper operation of any equipment that might result in damage or danger to equipment, building or personnel.
B. Final copies of all maintenance and operating information shall be submitted in bound form as a "Manual of Operating Instructions" with items grouped by sections of Work. Append each manual with name, address, telephone number of Contractor, subcontractor and companies or individuals providing service for equipment used.
C. Provide competent personnel to meet with the
Government representative to fully explain and familiarize the Government personnel with all equipment and its operation and maintenance.
1.5 Record Drawings:
The Contractor shall provide and maintain in proper order and in good, clean condition, at the project site, one (1) complete set of full size prints of all Drawings. On this set, with red pencil or ink, the Contractor will neatly inscribe all changes in Work. At time of final acceptance, and prior to final payment, these corrected prints will be presented to the COR. The Contractor will note all data and changes on these record drawings in sufficient detail and clarity to provide information necessary for preparation of "as built" drawings by the Government.
1.6 Guarantees, Warranties and Certificates
01770-3
A. The Contractor will submit all guarantees, warranties and certificates to the Government prior to final payment.
B. The Government requires a 100% warranty for a period of one full year after final acceptance. Items of Work found defective during the warranty period will be replaced at no cost to the Government and the warranty for that particular part of the Work shall automatically extend for one full year beyond the completion date of repairs.
C. If a manufacturer or supplier offers a guarantee in excess of the one year requirement outlined herein, then the longer guarantee period will apply for those particular items. If a longer guarantee and/or warranty is noted to be provided elsewhere in the project documents (plans, specifications, contract), the longer guarantee and/or warranty shall be provided.
(END OF SECTION 01770)
DIVISION 2 SECTION 02240
SITE CONSTRUCTION DEWATERING
02240 - 1
SECTION 02240 - DEWATERING
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes construction dewatering.
B. Related Sections:
1. Division 2 Section "Earthwork" for excavating, backfilling, site grading, and for site utilities.
2. Division 2 Section "Excavation Support and Protection" for shoring, bracing, and sheet piling of excavations.
1.3 DEWATERING REQUIREMENTS
A. The Contractor is solely responsible for determining if dewatering will be required for his or her operations.
B. The Contractor is solely responsible for designing, furnishing and maintaining a dewatering system if the Contractor determines one is necessary for his/her operations.
C. The Contractor is solely responsible for obtaining any and all permits that may be required for the installation of a dewatering system. The Contractor shall follow all requirements of governing authorities related to a dewatering system.
D. The Contractor shall coordinate dewatering locations, schedule, timing, duration, and peak flows and amounts with Refuge Staff.
02240 - 2
1.4 PERFORMANCE REQUIREMENTS
A. Dewatering Performance: If Contractor determines dewatering is necessary for his/her operations, design, furnish, install, test, operate, monitor, and maintain dewatering system of sufficient scope, size, and capacity to control hydrostatic pressures and to lower, control, remove, and dispose of ground water and permit excavation and construction to proceed on dry, stable subgrades.
1. Continuously monitor and maintain dewatering operations to ensure erosion control, stability of excavations and constructed slopes, that excavation does not flood, and that damage to subgrades and permanent structures is prevented.
2. Prevent surface water from entering excavations by grading, dikes, or other means.
3. Accomplish dewatering without damaging existing buildings, structures, and site improvements adjacent to excavation.
4. Remove dewatering system when no longer required for construction.
1.5 SUBMITTALS
A. Other Informational Submittals:
1. Photographs or Videotape: Show existing conditions of adjoining construction and site improvements that might be misconstrued as damage caused by dewatering operations prior to the start of construction operations.
1.6 QUALITY ASSURANCE
A. Installer Qualifications: An experienced installer that has successfully designed and installed at least five dewatering systems.
B. Regulatory Requirements: Comply with governing EPA notification regulations before beginning dewatering.
Comply with hauling and disposal regulations of authorities having jurisdiction.
02240 - 3
1.7 PROJECT CONDITIONS
A. Interruption of Existing Utilities: Do not interrupt any utility serving facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary utility according to requirements indicated:
1. Notify Government no fewer than five days in advance of proposed interruption of utility.
2. Do not proceed with interruption of utility without Government’s written permission.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 PREPARATION
A. Protect structures, utilities, trails, roadways, and other facilities from damage caused by settlement, lateral movement, undermining, washout, and other hazards created by dewatering operations.
1. Prevent surface water and subsurface or ground water from entering excavations, from ponding on prepared subgrades, and from flooding site and surrounding area.
2. Protect subgrades and foundation soils from softening and damage by rain or water accumulation.
B. If Contractor determines that dewatering is necessary for his/her work, install dewatering system to ensure minimum interference with roads, trails, and other adjacent occupied and used facilities.
1. Do not close or obstruct roadways, trails, or other adjacent occupied or used facilities without permission from the Government. Provide alternate routes around closed or obstructed traffic ways if required by the Government.
C. Provide temporary grading to facilitate dewatering and control of surface water.
02240 - 4
D. Monitor dewatering systems continuously.
E. Promptly repair damages to adjacent facilities caused by dewatering.
F. Protect and maintain temporary erosion and sedimentation controls during dewatering operations.
3.2 INSTALLATION
A. If the Contractor determines that dewatering is necessary for his/her operations, install dewatering system utilizing wells, well points, or similar methods complete with pump equipment, standby power and pumps, filter material gradation, valves, appurtenances, water disposal, and surface-water controls.
1. Space well points or wells at intervals required to provide sufficient dewatering.
2. Use filters or other means to prevent pumping of fine sands or silts from the subsurface.
B. If the Contractor determines that dewatering is necessary for his/her operations, place system into operation to lower water levels. Operate system continuously until construction operations are complete and dewatering is no longer required.
C. If the Contractor determines that dewatering is necessary for his/her operations, provide an adequate system to lower and control ground water to permit excavation, and placement of fill materials on dry subgrades.
1. Do not permit open-sump pumping that leads to loss of fines, soil piping, subgrade softening, and slope instability.
D. If the Contractor determines that dewatering is necessary for his/her operations, dispose of water removed by dewatering in a manner that avoids endangering public health, property, and portions of work under construction or completed. Dispose of water and sediment in a manner that avoids inconvenience to others. Provide sumps, sedimentation tanks, and other flow-control devices as required by authorities having jurisdiction.
02240 - 5
E. If the Contractor determines that dewatering is necessary for his/her operations and if dewatering requirements are not satisfied due to inadequacy or failure of dewatering system, restore damaged foundation soils at no additional expense to Government.
1. Remove dewatering system from Project site and refuge on completion of dewatering. Plug or fill well holes with sand or cut off and cap wells a minimum of 36 inches below overlying construction.
F. Damages: Promptly repair damages to adjacent facilities caused by dewatering operations.
3.3 FIELD QUALITY CONTROL
A. Provide continual observation to ensure that subsurface soils are not being removed by the dewatering operation.
(END OF SECTION 02240)
DIVISION 2 SECTION 02741
SITE CONSTRUCTION HOT-MIXED ASPHALT PAVEMENT
02741 - 1
SECTION 02741 - HOT-MIX ASPHALT PAVING
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.
B. Illinois Department of Transportation Standard Specifications Section 406. The method of measurement and basis of payment portions do not apply.
1.2 SUMMARY
A. This Section includes the following:
1. Preparing subgrades for paving.
2. Hot-Mix asphalt paving.
3. Pavement marking paint.
B. Plan Sheets 14 contains pavement marking layouts and dimensions for parking lots.
1.3 DEFINITIONS
A. Hot-Mix Asphalt Paving Terminology: Refer to ASTM D 8 for definitions of terms.
B. IDOT: Illinois Department of Transportation.
1.4 SYSTEM DESCRIPTION
A. Provide hot-mix asphalt paving according to materials, workmanship, and other applicable requirements of standard specifications of IDOT.
1. Standard Specification: Section 1030 Hot-Mix Asphalt.
2. Measurement and payment provisions and safety program submittals included in standard specifications do not apply to this Section.
02741 - 2
1.5 SUBMITTALS
A. Product Data: For each type of product indicated.
Include technical data and tested physical and performance properties.
B. Job-Mix Designs: Certification, by authorities having jurisdiction, of approval of each job mix proposed for the Work.
C. Job-Mix Designs: For each job mix proposed for the Work.
D. Qualification Data: For manufacturer.
E. Material Test Reports: For each paving material.
F. Material Certificates: For each paving material, signed by manufacturers.
G. Qualification Data: For independent testing agency.
H. Quality Control Testing Reports: For all Quality Control testing performed per specifications and to verify that the sub-base is determined to be acceptable to place pavement on.
1.6 QUALITY ASSURANCE
A. Manufacturer Qualifications: A qualified manufacturer.
1. Manufacturer shall be a paving-mix manufacturer registered with and approved by IDOT.
B. Testing Agency Qualifications: Qualified according to ASTM D 3666 for testing indicated, as documented according to ASTM E 548.
C. Regulatory Requirements: Comply with Section 1030 Hot-Mix Asphalt of IDOT for asphalt paving work.
D. Asphalt-Paving Publication: Comply with AI MS-22, "Construction of Hot Mix Asphalt Pavements," unless more stringent requirements are indicated.
1.7 PROJECT CONDITIONS
A. Environmental Limitations: Do not apply asphalt materials if subgrade is wet or excessively damp, if rain is
02741 - 3 imminent or expected before time required for adequate cure, or if the following conditions are not met:
1. Prime and Tack Coats: Minimum surface temperature of 40 deg F.
2. Asphalt Base Course: Minimum surface temperature of 40 deg F and rising at time of placement.
3. Asphalt Surface Course: Minimum surface temperature of 40 deg F at time of placement.
B. Epoxy Pavement-Marking: Proceed with pavement marking only on clean, dry surfaces and at a minimum ambient or surface temperature of 40 deg F for oil-based materials 55 deg F for water-based materials, and not exceeding 95 deg F.
1.8 PAYMENT FOR ADDITIONAL MATERIALS
A. The Government will not pay for material (including hot-mixed asphalt, etc.) placed over the unit price quantities provided in the Bid Schedule unless agreed upon prior to placement of the material through the formal Modification process.
PART 2 - PRODUCTS
2.1 AGGREGATES
A. General: Follow requirements of Section 1030 Hot-Mix Asphalt of IDOT.
2.2 ASPHALT MATERIALS
A. Mixes: Follow requirements of IDOT standard specification Section 1030 Hot-Mix Asphalt and the construction plans.
B. Prime Coat: Follow the requirements of IDOT standard specification section 406.
C. Epoxy Pavement-Marking: Follow the requirements of IDOT standard specification Section 1095.
1. Color: White.
02741 - 4
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that base is dry and in suitable condition to support paving and imposed loads.
B. Proof-roll base using heavy, pneumatic-tired rollers to locate areas that are unstable or that require further compaction.
C. Proceed with paving only after unsatisfactory conditions have been corrected.
3.2 SURFACE PREPARATION
A. General: Immediately before placing asphalt materials, remove loose and deleterious material from substrate surfaces. Ensure that prepared base is ready to receive paving.
1. Remove existing above- and below-grade improvements as indicated and as necessary to facilitate new constriction.
2. Remove slabs, paving, curbs, gutters, and aggregate base as indicated.
a. Unless existing full depth joints coincide with line of demolition, neatly saw-cut length of existing pavement, walk or curb to remain before removing existing pavement, walk or curb. Saw cut faces vertically.
b. Paint cut ends of steel reinforcement in concrete to remain to prevent corrosion.
3. Sweep loose granular particles from surface of unbound-aggregate base course. Do not dislodge or disturb aggregate embedded in compacted surface of base course.
4. Clean existing pavement of all granular material, vegetation, and soil materials from edge to edge before overlaying.
5. Fill all cracks and joints in existing pavement as detailed in IDOT Specification Section 406.05.
02741 - 5
6. Prepare sub-base as required by Contractor’s Independent Third Party Testing Agency to receive asphalt pavement. If testing agency reports that subgrades are not acceptable, scarify and moisten or aerate; recompact and retest until compaction required by testing agency is achieved. Testing agency shall provide Government with recommendation where deviations from Specifications occur or conditions are considered undesirable.
B. Prime Coat: Apply uniformly to paved surfaces at a rate of 0.05 to 0.10 gal/sq. yd, and a rate of 0.25 to 0.50 gal/sq. yd for aggregate base surfaces.
1. Allow tack coat to cure undisturbed before applying hot-mix asphalt paving.
2. Avoid smearing or staining adjoining surfaces, appurtenances, and surroundings. Remove spillages and clean affected surfaces.
3.3 HOT-MIX ASPHALT PLACING
A. Machine place hot-mix asphalt on prepared surface, spread uniformly, and strike off. Place asphalt mix by hand to areas inaccessible to equipment in a manner that prevents segregation of mix. Place each course to required grade, and thickness when compacted.
1. Place hot-mix asphalt base course in number of lifts and thicknesses indicated.
2. Place hot-mix asphalt surface course in single lift.
3. Spread mix at minimum temperature of 250 deg F.
4. Regulate paver machine speed to obtain smooth, continuous surface free of pulls and tears in asphalt-paving mat.
B. Promptly correct surface irregularities in paving course behind paver. Use suitable hand tools to remove excess material forming high spots. Fill depressions with hot-mix asphalt to prevent segregation of mix; use suitable hand tools to smooth surface.
3.4 JOINTS
A. Construct joints to ensure a continuous bond between adjoining paving sections. Construct joints free of
02741 - 6 depressions with same texture and smoothness as other sections of hot-mix asphalt course.
1. Clean contact surfaces and apply tack coat to joints.
2. Offset longitudinal joints, in successive courses, a minimum of 6 inches.
3. Offset transverse joints, in successive courses, a minimum of 24 inches.
4. Compact joints as soon as hot-mix asphalt will bear roller weight without excessive displacement.
3.5 COMPACTION
A. General: Begin compaction as soon as placed hot-mix paving will bear roller weight without excessive displacement. Compact hot-mix paving with hot, hand tampers or vibratory-plate compactors in areas inaccessible to rollers.
1. Complete compaction before mix temperature cools to 185 deg F.
B. Breakdown Rolling: Complete breakdown or initial rolling immediately after rolling joints and outside edge.
Examine surface immediately after breakdown rolling for indicated crown, grade, and smoothness. Correct laydown and rolling operations to comply with requirements.
C. Intermediate Rolling: Begin intermediate rolling immediately after breakdown rolling while hot-mix asphalt is still hot enough to achieve specified density.
Continue rolling until hot-mix asphalt course has been uniformly compacted to the density requirements indicated in IDOT Specification 1030.
D. Finish Rolling: Finish roll paved surfaces to remove roller marks while hot-mix asphalt is still warm.
E. Edge Shaping: While surface is being compacted and finished, trim edges of pavement to proper alignment.
Bevel edges while asphalt is still hot; compact thoroughly.
F. Repairs: Remove paved areas that are defective or contaminated with foreign materials and replace with fresh, hot-mix asphalt. Compact by rolling to specified density and surface smoothness.
02741 - 7
G. Protection: After final rolling, do not permit vehicular traffic on pavement until it has cooled and hardened.
H. Erect barricades to protect paving from traffic until mixture has cooled enough not to become marked.
3.6 INSTALLATION TOLERANCES
A. Thickness: Compact each course to produce the thickness indicated within the following tolerances:
1. Base Course: Minus 1/2 inch, no plus.
2. Surface Course: Minus 1/4 inch, no plus.
B. Surface Smoothness: Compact each course to produce a surface smoothness within the following tolerances as determined by using a 10-foot straightedge applied transversely or longitudinally to paved areas:
1. Base Course: 1/4 inch.
2. Surface Course: 1/8 inch.
3.7 PAVEMENT MARKING
A. See IDOT Specifications Section 780. The method of measurement and basis of payment portions do not apply.
B. Do not apply pavement-marking paint until layout, colors, and placement have been verified with the Government.
C. Allow paving to age for 10 days before starting pavement marking.
D. Sweep and clean surface to eliminate loose material and dust.
E. Apply paint with mechanical equipment to produce pavement markings, of dimensions indicated, with uniform, straight edges. Apply at manufacturer's recommended rates to provide a minimum wet film thickness of 15 mils.
F. Typical pavement striping width for all parking lots is 4”.
G. Do not apply glass beads to pavement markings on this project.
02741 - 8
3.8 FIELD QUALITY CONTROL
A. Testing Agency: Contractor must engage a qualified independent testing and inspecting agency to perform field tests and inspections and to prepare test reports.
Provide testing agency’s qualifications to Government prior to start of construction.
1. Testing agency will conduct and interpret tests and state in each report whether tested Work complies with or deviates from specified requirements.
B. Additional testing and inspecting, at Contractor's expense, will be performed to determine compliance of replaced or additional work with specified requirements.
C. Contractor Independent Third Party Testing Agency shall inspect and test the subbase as necessary to document that sub-base is adequate to receive asphalt pavement. A report of said testing/inspection shall be provided to the
COR.
D. Thickness: In-place compacted thickness of hot-mix asphalt courses will be determined according to
ASTM D 3549.
E. In-Place Density: Testing agency must take samples of uncompacted paving mixtures and compacted pavement according to ASTM D 979 or AASHTO T 168.
1. Reference maximum theoretical density will be determined by averaging results from four samples of hot-mix asphalt-paving mixture delivered daily to site, prepared according to ASTM D 2041, and compacted according to job-mix specifications.
2. In-place density of compacted pavement will be determined by testing core samples according to ASTM D 1188 or ASTM D 2726.
a. One core sample will be taken for every 8,000 sq.
yd. or less of installed pavement, with no fewer than 3 cores taken for each day of paving.
b. Field density of in-place compacted pavement may also be determined by nuclear method according to ASTM D 2950 and correlated with ASTM D 1188 or
ASTM D 2726.
02741 - 9
F. Remove and replace or install additional hot-mix asphalt where test results or measurements indicate that it does not comply with specified requirements.
G. Replace and compact hot-mix asphalt where core tests were taken.
H. Provide Government copies of all Testing Reports within one week of the completion of tests.
3.9 DISPOSAL
A. Remove excavated materials from Project site and comply with all Federal, State, County, and local laws and regulations when removing, transporting, and disposing surplus soil material, unsuitable topsoil, obstructions, demolished materials including trash and debris off Government’s property. Provide tarps or covers on trucks hauling surplus soils and waste.
1. Do not allow excavated materials to accumulate on-site.
(END OF SECTION 02741)
DIVISION 2 SECTION 02890
SITE CONSTRUCTION TRAFFIC SIGNAGE
02890 - 1
SECTION 02890 – TRAFFIC SIGNAGE
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.
B. Manual on Uniform Traffic Control Devices, latest edition including latest revisions.
1.2 SUMMARY
A. This Section includes the following:
1. Site Traffic Signage as indicated on Drawings and specified herein, complete with related accessories and attachments.
B. All road signage shall meet the current Manual on Uniform Traffic Control Devices (MUTCD) regulations and requirements.
1.3 SUBMITTALS
A. Product Data: Submit data on product characteristics, accessories, hardware, and finishes.
B. Installation Instructions: Submit manufacturer’s installation instructions.
1.4 DELIVERY, STORAGE, AND HANDLING
A. Deliver and store products to site per manufacturer’s instructions.
B. Protect products from weather and construction operations.
1.5 WARRANTY
A. Provide 1 year manufacturer’s written warranty.
02890 - 2
B. Warrant materials and workmanship against defects after completion and final acceptance of Work.
1. Repair defects from faulty materials or workmanship developed during the guarantee period, or replace with new materials, at no expense to the government.
PART 2 - PRODUCTS
2.1 MANUFACTURER’S
A. Site Traffic Signage: Subject to compliance with, provide products from 1 of the following manufacturer’s:
1. Champion America, Inc.
2. EMED Company, Inc.
3. Seton Identification Products.
4. Telespar, a Division of Unistrut Corp.
5. Substitutions: Obtain prior approval from government.
2.2 MATERIALS
A. Sign Panels: Sheet aluminum ASTM B209-96, 0.080 inch thick, radius corners, free of buckles, warps, dents, cockles, burrs, and other defects resulting from fabrication with plane surface.
1. Pre-drill or pre-punch signs for mounting to sign supports.
2.3 FINISHES (SIGN FACE)
A. Reflective sheeting adhesive backed for disabled parking signs and traffic enforcement signs. Comply with the latest requirements of the Manual on Uniform Traffic Control Devices.
1. Colors: Traffic Enforcement: As shown in the Manual on Uniform Traffic Control Devices.
02890 - 3
2.4 FABRICATION
A. Fabricate and assemble units to minimize on-site assembly.
B. Ensure that welds are provided behind finished surfaces and transmit no distortion or discoloration to finished side.
C. Make joints, miters, and connections tight and free of noticeable fractures.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Site Traffic Signage:
1. Install site traffic signage per manufacturer’s instructions.
2. Install traffic signage at locations indicated on the Drawings.
3. Install traffic signage to proper height per details and the Manual on Uniform Traffic Control Devices.
3.2 CLEANING
A. Dispose of excess materials and debris from the refuge.
B. Prior to Substantial Completion, clean exposed surfaces per manufacturer’s instructions.
(END OF SECTION 02890)
SUBMITTAL REGISTER PAGE 1 of 1
DATE
SHOP DRAWINGS, EQUIPMENT DATA, AND MATERIAL SAMPLES
CONTRACT NO: CONTRACTOR: CONST. MANAGER:
PROJECT:
Crab Orchard Parking and Roadway Improvements ADDRESS:
LOCATION: Crab Orchard
SPECIFICATION DESCRIPTION DATE TRANS. REVIEWED DATE ACT. ACTION DATE ACTION COMMENTS
SECTION NO. SUBMITTED NO. BY TAKEN CODE RESUBM. CODE
01100 Preconstruction Safety Checklist 01330 Manufactures Installation Instructions 01330 Progress Payment Certificates 01330 Progress Schedule 01300 Subcontractor List 01300 Price Breakdown 01300 Guarantees, Warrantees and Certificates 01300 Operating and Maintenance Instructions 01330 Delivery Tickets 01330 Waste Manifests/Disposal Tickets 01330 Testing Reports 01330 Traffic Control Plan 01770 Record Drawings 02240 Photos/Videotapes 02741 Product Data Sheets 02741 Job Mix Designs Certifications 02741 Job Mix Designs 02741 Manufactures Qualification Certificate 02741 Material Testing Reports 02741 Material…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .