A14_22R0022_At3_Specifications_Phase_I_1.pdf
PDF 9 MB Posted
- Attached to
- LA POSA LAGOON GAOA Federal contract opportunity
- Solicitation number
- 140L0622R0022
About this file
This document contains a geotechnical engineering report for a proposed Bureau of Land Management waste water treatment project located at the La Posa South LTVA in Quartzsite, Arizona. The report provides information on subsurface soil conditions, foundation design recommendations, groundwater levels, seismic site classification, site preparation requirements, lateral earth pressure considerations, and other geotechnical engineering evaluations. It includes the results of subsurface exploration consisting of seven test borings advanced to depths ranging from 19 to 60 feet below grade. Laboratory testing data and engineering analyses are also presented to characterize subsurface conditions and develop design and construction recommendations for site grading, shallow foundations, floor slabs, retaining walls, and other earth-connected aspects of the project.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A14_22R0022_At1_Plans_Phase_I_1.pdf | ||
| A14_22R0022_At6_SWPPP_A-2_EC_Plan_1.pdf | ||
| A14_22R0022_At5_SWPPP_A-1_EC_Plan_1.PDF | ||
| A14_22R0022_At4_Specifications_Phase_II_1.pdf | ||
| A14_22R0022_At2_Plans_Phase_II_1.pdf | ||
| A14_22R0022_Sources_Sought_1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. BUREAU OF LAND MANAGEMENT
LA POSA TYSON WASH LTVA
WASTEWATER LAGOON
QUARTZSITE, ARIZONA
U.S. BLM YUMA FIELD OFFICE
Yuma, Arizona
Construction Documents Phase 1
Project Specifications
U.S. DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
June 2021 https://www.google.com/url?sa=i&rct=j&q=&esrc=s&source=images&cd=&cad=rja&uact=8&ved=0ahUKEwjRj7qiodjPAhXJWT4KHYVGDwYQjRwIBw&url=https://en.wikipedia.org/wiki/United_States_Department_of_the_Interior&bvm=bv.135475266,d.cWw&psig=AFQjCNE6hwjlcWlUZf-LlmIR9a_KRGs4CQ&ust=1476464552848630 https://www.google.com/url?sa=i&rct=j&q=&esrc=s&source=images&cd=&cad=rja&uact=8&ved=0ahUKEwjT2oXhoNjPAhVFVD4KHbUhAc4QjRwIBw&url=https://reports.blm.gov/reports.cfm?application%3DRAS&psig=AFQjCNGX6gpX3AX_gs4hjn1ylozu8zkjlw&ust=1476464381007529
TABLE OF CONTENTS 000000 - 1
TABLE OF CONTENTS
LA POSA TYSON WASH LTVA WASTEWATER LAGOON – PHASE 1
SPECIFICATIONS
DIVISION SECTION TITLE
DIVISION 01 – GENERAL REQUIREMENTS
000105 CERTIFICATIONS
003132 GEOTECHNICAL DATA
011000 SUMMARY
012500 SUBSTITUTION PROCEDURES
013100 PROJECT MANAGEMENT AND COORDINATION
013200 CONSTRUCTION PROGRESS DOCUMENTATION
013233 PHOTOGRAPHIC DOCUMENTATION
013300 SUBMITTAL PROCEDURES
014000 QUALITY REQUIREMENTS
014200 REFERENCES
015000 TEMPORARY FACILITIES AND CONTROLS
017300 EXECUTION
017329 CUTTING AND PATCHING
017419 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
017500 STARTING AND ADJUSTING
017700 CLOSEOUT PROCEDURES
017823 OPERATION AND MAINTENANCE DATA
017839 PROJECT RECORD DOCUMENTS
017900 DEMONSTRATION AND TRAINING
DIVISION 02 – EXISTING CONDITIONS
026600 GEOTEXTILE USED IN GEOMEMBRANE CUSHIONING
DIVISION 03 – CONCRETE
031100 CONCRETE FORMING
032000 CONCRETE REINFORCING
033000 CAST-IN-PLACE CONCRETE
033120 CONCRETE FOUNDATION FOR STORAGE TANKS
DIVISION 7 – THERMAL AND MOISTURE PROTECTION
074113.16 STANDING SEAM METAL ROOF PANELS
DIVISION 9 - FINISHES
099713 COATING SYSTEMS FOR WATER STORAGE TANKS
DIVISION 10 - SPECIALTIES
101455 SECURITY SIGNS
DIVISION 13 – SPECIAL CONSTRUCTION
133419 METAL BUILDING SYSTEMS
134310 WATER SYSTEM ELECTRICAL CONTROLS
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
230200 BASIC HVAC REQUIREMENTS
TABLE OF CONTENTS 000000 - 2
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
230300 ELECTRICAL EQUIPMENT AND WIRING COORDINATION FOR HVAC
SYSTEMS
230513 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT
230517 SLEEVES AND SLEEVE SEALS FOR HVAC PIPING
230553 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
230593 TESTING, ADJUSTING, AND BALANCING FOR HVAC
230719 HVAC PIPING INSULATION
232300 REFRIGERANT PIPING
238129 VARIABLE REFRIGERANT VOLUME (VRV) HVAC SYSTEM
DIVISION 26 - ELECTRICAL
260200 BASIC ELECTRICAL REQUIREMENTS
260505 SELECTIVE DEMOLITION FOR ELECTRICAL
260519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
260526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
260529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
260533.13 CONDUIT
260533.16 BOXES FOR ELECTRICAL SYSTEMS
260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS
260573 POWER SYSTEM STUDIES
260583 WIRING CONNECTIONS
262200 LOW-VOLTAGE TRANSFORMERS
262416 PANELBOARDS
262726 WIRING DEVICES
262813 FUSES
262816.16 ENCLOSED SWITCHES
265100 INTERIOR LIGHTING
DIVISION 31 – EARTHWORK
311000 SITE CLEARING
312000 EARTH MOVING
313700 RIPRAP, BOULDERS, SOIL RIPRAP AND BEDDING
DIVISION 32 – EXTERIOR IMPROVEMENTS
321126 CRUSHED AGGREGATE BASE COURSE
323113 CHAIN LINK FENCES AND GATES
DIVISION 33 – UTILITIES
331100 WATER DISTRIBUTION SYSTEMS
331610 FACTORY-COATED BOLTED STEEL WATER STORAGE TANKS
331630 DISINFECTION OF WATER STORAGE FACILITIES
332820 SUBMERSIBLE WELL PUMP AND MOTOR
333100 SANITARY SEWER SYSTEMS
334713 WASTEWATER TREATMENT POND LINER
DIVISION 40 - PROCESS INTEGRATION
402300 PROCESS PIPING GENERAL PROVISIONS
402320 PROCESS PIPING VALVES
402330 PROCESS PIPING SPECIALTIES
402350 PROCESS PIPING TESTING, ADJUSTING, AND DISINFECTION
TABLE OF CONTENTS 000000 - 3
DIVISION 43 - PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND STORAGE
EQUIPMENT
431219 BLOWER ASSEMBLIES
DIVISION 44 – POLLUTION AND WASTER CONTROL EQUIPMENT
444100 PRE-PACKAGED WATER BOOSTER PUMP
444417 LIQUID FEED CHLORINATION EQUIPMENT
DIVISION 46 – WATER AND WASTEWATER EQUIPMENT
460712 PACKAGED WATER TREATENT EQUIPMENT
465122 FINE BUBBLE DIFFUSED AERATION EQUIPMENT
TABLE OF CONTENTS 000000 - 4
Page left intentionally blank
LA POSA TYSON WASH LTVA JUNE 2021
WASTEWATER LAGOON – PHASE 1
VICINITY MAP
LOCATION MAP
CERTIFICATIONS 000105 - 1
SECTION 000105 - CERTIFICATIONS
I hereby certify that this technical submission was prepared by me or under my direct supervision and responsible charge in accordance with the rules and regulations governing Architects and Engineers practicing in the State of Arizona. I am a duly registered Professional in the State of Arizona.
Discipline: Civil
Name: James Dale Hayson
Registration No.: 62210
Signature
I hereby certify that this technical submission was prepared by me or under my direct supervision and responsible charge in accordance with the rules and regulations governing Architects and Engineers practicing in the State of Arizona. I am a duly registered Professional in the State of Arizona.
Discipline: Civil
Name: Jeffrey Ledin
Registration No.: 69195
Signature
CERTIFICATIONS 000105 - 2
I hereby certify that this technical submission was prepared by me or under my direct supervision and responsible charge in accordance with the rules and regulations governing Architects and Engineers practicing in the State of Arizona. I am a duly registered Professional in the State of Arizona.
Discipline: Structural
Name: Steven J. Halewski
Registration No.: 72239
Signature
I hereby certify that this technical submission was prepared by me or under my direct supervision and responsible charge in accordance with the rules and regulations governing Architects and Engineers practicing in the State of Arizona. I am a duly registered Professional in the State of Arizona.
Discipline: Architecture
Name: Jeffrey G. Pedersen
Registration No.: 33090
06.30.2021
6-30-2021
CERTIFICATIONS 000105 - 3
I hereby certify that this technical submission was prepared by me or under my direct supervision and responsible charge in accordance with the rules and regulations governing Architects and Engineers practicing in the State of Arizona. I am a duly registered Professional in the State of Arizona.
Discipline: Electrical
Name: Ashlee R. Downham
Registration No.: 59607
I hereby certify that this technical submission was prepared by me or under my direct supervision and responsible charge in accordance with the rules and regulations governing Architects and Engineers practicing in the State of Arizona. I am a duly registered Professional in the State of Arizona.
Discipline: Mechanical
Name: Craig A. Watts
Registration No.: 45523
06-30-2021
Expires 3/31/2024
06-30-2021
CERTIFICATIONS 000105 - 4
GEOTECHNICAL DATA 003132 - 1
SECTION 003132 – GEOTECHNICAL DATA
PART 1 - GENERAL
1.1 BORING NOTES
A. Data shown on boring logs is for the Bidders’ information. Bidder should be cognizant that materials between borings can vary from that shown on logs. Final and complete identification of all materials between borings can be verified only by Site excavation.
Bidder shall assume full responsibility for excavating all materials encountered during construction regardless of density or groundwater condition.
B. The boring logs are an exact copy of the originals made by photo process reproduction. This information was obtained for design purposes and is made available to Bidders so they may have the same information the designers used. This information is not intended as a substitute for Bidder’s personal investigations, interpretations, or judgment. Bidder may make his own soils investigation, but he must first obtain Government’s approval. Failure of Bidder to conduct his own investigation or to analyze available data shall not relieve Bidder of any responsibility in excavating difficult materials.
C. Water levels indicated on the boring logs are subject to seasonal and/or annual variations.
D. The original investigation report is available for Bidder’s inspection at Government’s office.
1.2 ATTACHMENTS
A. Geotechnical Report: Geotechnical Engineering Report – Proposed BLM La Posa WW Lagoons La Posa South LTVA, Quartzsite, Arizona; Prepared by Terracon and dated October 30, 2019; Terracon Project No. 65195142
END OF SECTION 003132
GEOTECHNICAL DATA 003132 - 2
REPORT COVER PAGE
Geotechnical Engineering Report
Proposed BLM La Posa WW Lagoons La Posa South LTVA
Quartzsite, Arizona
October 30, 2019 Terracon Project No. 65195142
Prepared for:
SEH, Inc.
Pueblo, Colorado
Prepared by:
Terracon Consultants, Inc.
4685 South Ash Avenue, Suite H-4 Tempe, Arizona
Terracon Consul tants, Inc. 4685 S. Ash Avenue Ste. H-4 Tempe, Ar izona 85282 P (480) 897 8200 F (480) 897 1133 terracon.com
REPORT COVER LET TER T O SIGN
October 30, 2019
SEH, Inc.
503 North Main Street, Suite 225 Pueblo, Colorado 81003
Attn: Mr. Jimmie Hayson Phone: (719) 423-7403 Email: jhayson@sehinc.com
Re: Geotechnical Engineering Report Proposed BLM La Posa WW Lagoons La Posa South LTVA Quartzsite, Arizona Terracon Project No. 65195142
Dear Mr. Hayson:
Terracon Consultants, Inc. (Terracon) has completed the Geotechnical Engineering services for the above referenced project. This study was performed in general accordance with Terracon Proposal No. P65195152 Revision No. 1 dated September 14, 2019. This report presents the findings of the subsurface exploration and provides geotechnical engineering recommendations concerning earthwork and the design and construction of foundations for the proposed project.
We appreciate the opportunity to be of service to you on this project. If you have any questions concerning this report or if we may be of further service, please contact us.
Sincerely, Terracon Consultants, Inc.
Eddy F. Ramirez, P.E. Donald R. Clark, P.E.
Geotechnical Project Manager Sr. Consultant/Sr. Principal
Responsive ■ Resourceful ■ Reliable 1
REPORT TOPICS
INTRODUCTION
PROJECT DESCRIPTION
SITE CONDITIONS
EXPLORATION AND TESTING PROCEDURES
GEOTECHNICAL CHARACTERIZATION
CORROSIVITY
SEISMIC CONSIDERATIONS
GEOTECHNICAL OVERVIEW
SHALLOW FOUNDATIONS
LATERAL EARTH PRESSURES
FLOOR SLABS
EARTHWORK
GENERAL COMMENTS
MAP 1 LANDSCAPE
Note: This report was originally delivered in a web-based format. Orange Bold text in the report indicates a referenced section heading. The PDF version also includes hyperlinks which direct the reader to that section and clicking on the GeoReport logo will bring you back to this page. For more interactive features, please view your project online at client.terracon.com.
ATTACHMENTS
SITE LOCATION AND EXPLORATION PLANS
EXPLORATION RESULTS
(General Notes, Unified Soil Classification System, Boring Logs, and Laboratory Testing Results)
Note: Refer to each individual Attachment for a listing of contents.
http://client.terracon.com/
Proposed BLM La Posa WW Lagoons ■ Quartzsite, Arizona October 30, 2019 ■ Terracon Project No. 65195142
Responsive ■ Resourceful ■ Reliable i
REPORT SUMMARY
Topic 1 Overview Statement 2
Project Description
We understand the proposed project will consist of a new waste water treatment system, waste water lagoons, water well and well/pump house, water well, 15,000-gallon water storage tank and associated distribution lines, RV dump and fill stations, and electrical distribution.
Geotechnical Characterization
The subsurface conditions at the site generally consist of loose to very dense sand with variable amounts of silt, clay, and gravel, and medium dense to very dense poorly graded gravel with variable amounts of silt, clay, and sand to a depth of approximately 5 to 14 feet, followed by dense to very dense sand with variable amounts of silt, clay, and gravel and hard lean clay with sand to the full depth of exploration of 60½ feet.
Groundwater was not encountered to a maximum boring depth of 15½ feet.
Shallow Foundations
Shallow Foundations Shallow spread footings and concrete ring wall foundations can be utilized for the support of planned structures and water storage tanks on the project.
■ Maximum allowable bearing pressure = 3,000 psf with a minimum 18-inch embedment depth is recommended.
■ Expected settlements: 1 inch or less total, ¾ inch or less differential
■ Shallow foundations and concrete ring wall foundations should be supported on approved undisturbed native soils or compacted engineered fill, if required to raise site grades.
Mat/Slab Foundations Mat/slab foundations can be utilized for the proposed project.
■ Maximum allowable bearing pressure =3,000 psf with a minimum 12-inch embedment depth is recommended.
■ Expected settlements: 1 inch or less total
■ Mat/slab foundations should be supported on approved undisturbed native soils or compacted engineered fill, if required to raise site grades
Earthwork
■ No site preparation is required below shallow spread footings, concrete ring wall foundations, and mat/slab foundations. We recommend shallow spread footings, concrete ring wall foundations, and mat/slab foundations be supported on undisturbed native soils or engineered fill if required to raise site grades.
■ Subgrade soils beneath interior floor slabs and exterior slabs should be scarified, moisture conditioned and compacted to a minimum depth of 10 inches.
Slopes Compacted fill or excavation slopes constructed at 3H:1V side slopes and a maximum depth on the order of 5 feet below grade are considered safe for all soils on the site.
October 30, 2019 ■ Terracon Project No. 65195142
Responsive ■ Resourceful ■ Reliable ii
Topic 1 Overview Statement 2
Erosion Considerations
Based on the engineering properties of the soils encountered in the test borings, the Erosion Index (ER) Factor (based on published data) for these soils is considered to be in the range of 4 to 6 (on a scale of 0 to 10). Based on this ER Index, moderate erosion would be predictable under high velocity water discharge on slopes or due to wave action in ponds. However, the interior slope face of embankments within the proposed ponds will be lined; therefore, the liners should provide adequate erosion control on the face of the embankment slopes. Consideration for erosion control on the exterior embankment slopes are provided in the report.
Seismic Considerations
Based on the site soil properties, the site is classified as Site Class D in accordance with Chapter 20 of ASCE 7 as required by the 2012/2015 IBC
General Comments
This section contains important information about the limitations of this geotechnical engineering report.
1. If the reader is reviewing this report as a pdf, the topics above can be used to access the appropriate section of the report by simply clicking on the topic itself.
2. This summary is for convenience only. It should be used in conjunction with the entire report for design purposes.
Responsive ■ Resourceful ■ Reliable 1
INTRODUC TION
Geotechnical Engineering Report Proposed BLM La Posa WW Lagoons
La Posa South LTVA Quartzsite, Arizona
Terracon Project No. 65195142 October 30, 2019
INTRODUCTION
This report presents the results of our subsurface exploration and geotechnical engineering services performed for the proposed BLM La Posa WW Lagoons project to be located La Posa South LTVA in Quartzsite, Arizona. The purpose of these services is to provide information and geotechnical engineering recommendations relative to:
■ Subsurface soil conditions ■ Foundation design and construction
■ Groundwater conditions ■ Seismic site classification per IBC
■ Site preparation and earthwork ■ Lateral earth pressures
■ Excavation considerations
The geotechnical engineering scope of services for this project included the advancement of 7 test borings to depths ranging from approximately 19½ to 60½ feet below the existing ground surface, two percolation tests at a depth of approximately 4 feet below existing ground surface, laboratory testing from samples collected from our field exploration, geotechnical engineering analysis, and preparation of this report.
Maps showing the site and boring locations are shown on the attached Site Location and Exploration Plan sections, respectively. A log of each boring is included in the Exploration Results section of this report. The results of the laboratory testing performed on soil samples obtained from the site during the field exploration are included on the boring logs and as separate graphs in the Exploration Results section of this report.
October 30, 2019 ■ Terracon Project No. 65195142
Responsive ■ Resourceful ■ Reliable 2
PROJECT DESCRIPTION
Item Description
Project Description
We understand the proposed project will consist of new waste water treatment system, waste water lagoons, water well and well/pump house, water well, 15,000-gallon water storage tank and associated distribution lines, RV dump and fill stations, and electrical distribution.
Proposed Structures
We anticipate the new well/pump house will be a wood-frame structure supported on shallow spread footings. We anticipate the waste water treatment system will consist of concrete structures supported on shallow spread footings and/or mat foundations. We anticipate the new water tank will be either a polyethylene or corrugated steel panels supported by a reinforced concrete ring wall foundation.
Proposed Waste Water Lagoons
Based on the information provided, we understand the planned construction will include 2 evaporation ponds. The maximum depth and planned side slope configurations of the evaporation ponds are unknown at the time this report was prepared. We anticipate the side slopes of the ponds will be approximately 3H:1V (horizontal: vertical). The ponds will be lined; however, details of the lining were not available.
Maximum Loads (assumed)
Load information for planned structures was not provided for the proposed project; therefore, the following are assumed maximum loads for the project.
Well/pump house structure
■ Columns: 50 kips
■ Walls: 2 to 4 kips per linear foot (klf)
■ Slabs: 150 pounds per square foot (psf)
Waste Water Treatment System
■ Columns: 100 kips
■ Walls: 4 to 5 kips per linear foot (klf)
■ Slabs: 150 pounds per square foot (psf)
15,000 Gallon Water Tank:
■ Total Weight: 125.5 kips
Grading/Slopes Topographically the site has a gentle slope across the ground surface;
however, we anticipated cuts and fills on the order of up to 2 to 4 feet may be required to bring the site to planned construction grade.
Below-Grade Structures
None are planned.
Free-Standing Retaining Walls
None are planned.
Pavements New gravel surface parking and access roads will be constructed. However, surfacing recommendations have been excluded from our scope of services.
October 30, 2019 ■ Terracon Project No. 65195142
Responsive ■ Resourceful ■ Reliable 3
SITE CONDITIONS
The following description of site conditions is derived from our site visit in association with the field exploration and our review of publicly available geologic and topographic maps.
Item Description
Parcel Information The project site is located at the La Posa South LTVA in Quartzsite, Arizona.
See the attached Site Location and Exploration Plan for additional site information.
Existing Improvements The project site consists of native desert and is currently undeveloped.
Current Ground Cover The site is covered with bare soil and desert vegetation.
Existing Topography Based on information provided from Google Earth Pro, the site slopes down from the southeast to the northwest. There is approximately 25 feet in topographic relief across the site.
EXPLORATION AND TESTING PROCEDURES
Field Exploration
A total of 9 borings were drilled at the project site on September 4 and 5, 2019. The approximate boring locations at the project site are shown on the Exploration Plan, and the location and depth of the borings are summarized in the following table:
Number of Borings Boring ID Number Boring Depth (feet) Planned Location
5 B-1 thru B-4 20½ Waste Water Lagoons
2 B-5 and B-6 60½ Water Storage Tank/Pump House
1 B-7 19½ RV Dump Station
2 P-1 and P-2 4 Waste Water Lagoons (Percolation Testing)
Boring Layout and Elevations: Terracon personnel provided the boring layout. Coordinates were obtained by Terracon with a handheld GPS unit (estimated horizontal accuracy of about ±10 feet). If elevations and a more precise boring layout are desired, we recommend the borings be surveyed.
Subsurface Exploration Procedures: The borings were advanced with a truck-mounted D-120 drill rig utilizing 8-inch outside diameter hollow-stem augers. At selected intervals, samples of the subsurface materials were taken at each boring location by driving split-spoon (SPT) or ring-lined
October 30, 2019 ■ Terracon Project No. 65195142
Responsive ■ Resourceful ■ Reliable 4 barrel samplers in general accordance with ASTM Standards. In the split-barrel sampling procedure, a standard 2-inch outer diameter split-barrel sampling spoon is driven into the ground by a 140-pound automatic hammer falling a distance of 30 inches. The number of blows required to advance the sampling spoon the last 12 inches of a normal 18-inch penetration is recorded as the Standard Penetration Test (SPT) resistance value. The SPT resistance values, also referred to as N-values, are indicated on the boring logs at the test depths. A 3-inch O.D. and 2.5-inch I.D. ring lined sampler was used for sampling at selected intervals in the soil borings. Ring-lined, split-barrel sampling procedures are similar to standard split spoon sampling procedure; however, blow counts are typically recorded for 6-inch intervals for a total of 12 inches of penetration. Bulk samples of subsurface materials were obtained from all the borings. Groundwater was not encountered during drilling and sampling. For safety purposes, all borings were backfilled with auger cuttings after their completion.
Our exploration team prepared field boring logs as part of the drilling operations. The sampling depths, penetration distances, and other sampling information were recorded on the field boring logs. These field logs included visual classifications of the materials encountered during drilling and our interpretation of the subsurface conditions between samples. The samples were placed in appropriate containers and taken to our soil laboratory for testing and classification by a geotechnical engineer. Final boring logs were prepared from the field logs. The final boring logs represent the geotechnical engineer's interpretation of the field logs and include modifications based on observations and tests of the samples in our laboratory.
Percolation Test Results
As part of the field exploration, Terracon performed two percolation tests at the location of the planned pond areas in general accordance with ADEQ requirements. The percolation tests were performed by drilling a 12-inch diameter percolation hole to a depth of approximately 4 feet below the existing ground surface. The percolation hole was cleaned, lined with a 10-inch PVC casing, and pre-soaked before testing. The annulus between the casing and the hole was backfilled and hand tamped with soil cuttings. After pre-soaking was completed, the hole was filled to a predetermined level. Then the percolation test was performed by measuring the amount of time for the water elevation to drop 1 inch. The percolation rates measured were reported in minutes per inch. The stabilized percolation rate is shown in the following table. The PVC casing was pulled out of the ground and backfilled with the soil cuttings upon completion.
Percolation Test Results
Test Hole Depth (feet) Soil Classification Infiltration Rate
(minutes/inch)
P-1 4 Silty Clayey Gravel with Sand 18
P-2 4 Silty Clayey Gravel with Sand 28
October 30, 2019 ■ Terracon Project No. 65195142
Responsive ■ Resourceful ■ Reliable 5
It should be noted that siltation and vegetation growth along with other factors may affect the percolation rates within the proposed pond areas.
Laboratory Testing
Samples retrieved during the field exploration were taken to the laboratory for further observation by the project geotechnical engineer and were classified in accordance with the Unified Soil Classification System (USCS) as shown in Exploration Results section of this report. At that time, the field descriptions were confirmed or modified as necessary and an applicable laboratory testing program was formulated to determine engineering properties of the subsurface materials.
General laboratory tests were conducted on selected soil samples and the test results are presented in the Exploration Results section of this report. These results were used for the geotechnical engineering analyses, and the development of foundation recommendations.
Laboratory tests were performed in general accordance with the applicable ASTM, local or other accepted standards.
Selected soil samples obtained from the site were tested for the following engineering properties:
n Atterberg Limits n Sieve Analysis n Moisture Content n Dry Density n Consolidation n Moisture Density Relationship n Remolded Swell n Direct Shear n Soluble Sulfate n pH n Soluble Chloride n Minimum Resistivity
GEOTECHNICAL CHARACTERIZATION
Geology
The project site is located in the Basin and Range physiographic province (1Cooley, 1967) of the North American Cordillera (2Stern, et al, 1979) of the southwestern United States. The southern portion of the Basin and Range province is situated along the southwestern flank of the Colorado Plateau and is bounded by the Sierra Nevada Mountains to the west. Formed during middle and late Tertiary time (100 to 15 million years ago), the Basin and Range province is dominated by fault-controlled topography. These mountain ranges and valleys have evolved from generally complex movements and associated erosional and depositional processes.
1 Cooley, M.E., 1967, Arizona Highway Geologic Map, Arizona Geological Society.
2 Stern, C.W., et al, 1979, Geological Evolution of North America, John Wiley & Sons, Santa Barbara, California.
October 30, 2019 ■ Terracon Project No. 65195142
Responsive ■ Resourceful ■ Reliable 6
Typically, the ranges in these areas are of small areal extent but protrude significantly above adjacent wide alluviated plains and valleys. The basin rims are formed by the mountain ranges which consist of sedimentary, igneous and metamorphic materials which have been subjected to recurrent faulting and tilting, and in some places volcanic and intrusive events. As a result of erosion, the valleys have experienced partial infilling with sedimentary material which has been deposited as alluvial fans. Occasionally, the valleys may become interlocking as a result of coalescing alluvial fans which are referred to as bajadas.
Based on available U.S. Geological Survey (USGS) geological maps, surficial geologic conditions mapped at the site consist of Quaternary surficial deposits. This unit consists of unconsolidated to strongly consolidated alluvial and eolian deposits, including coarse, poorly sorted alluvial fan and terrace deposits on middle and upper piedmonts and along large drainages; sand, silt and clay on alluvial plains and playas; and wind-blown sand deposits.
Subsurface Profile
Specific conditions encountered at each boring location are indicated on the individual boring logs presented in the Exploration Results section of this report. Stratification boundaries on the boring logs represent the approximate location of changes in soil types; in-situ, the transition between materials may be gradual. Based on conditions encountered in the borings, subsurface conditions at each project site can be generalized as follows:
Description Approximate Depth to Bottom of Stratum (feet) Material Description Relative Density /
Consistency
Stratum 1 5 to 14
Sand with variable amounts of silt, clay, and gravel, Gravel with variable amounts of silt, clay, and sand
Loose to Very Dense
Stratum 2 60½
(maximum depth explored)
Sand with variable amounts of silt, clay, and gravel, Lean Clay with Sand
Dense to Very Dense / Hard
Laboratory tests were conducted on selected soil samples obtained from the project site and the test results are presented in the Exploration Results section of this report. Test results indicate the near surface sand and gravel soils exhibit non-plastic to low plasticity characteristics.
When water was added to a sample of laboratory compacted on-site near surface silty clayey sand soils, the compacted soils exhibited low expansive potential when subjected to light loading conditions such as those imposed by lightly loaded mat/slab foundations.
In response to wetting of relatively undisturbed samples while supporting typical foundation loads, the near surface soils exhibited low hydro-compaction (collapse) potential at in-situ moisture
October 30, 2019 ■ Terracon Project No. 65195142
Responsive ■ Resourceful ■ Reliable 7 content and density. These same soils show low compression under anticipated foundation pressures.
Direct shear tests were performed on undisturbed samples obtained during the field exploration and the results indicated peak friction angles of 48 and 54 degrees and cohesion values of 0 and 48 psf at the maximum shear stress. Residual friction angles corresponding to maximum displacement under direct shear testing were 46 and 52 degrees with a cohesion value of 0 psf.
Groundwater Conditions
Groundwater was not observed in any of the test borings at the time of our field exploration, nor when checked upon completion of drilling. These observations represent groundwater conditions at the time of the field exploration and may not be indicative of other times, or the conditions at other locations. Groundwater conditions can change with varying seasonal and weather conditions, and other factors.
Based on information obtained from the Arizona Department of Water Resources – Groundwater Data website (https://gisweb.azwater.gov/waterresourcedata/GWSI.aspx), the depth to regional groundwater near the project site was measured to be approximately 38 feet below the ground surface at an Arizona Department of Water Resources (ADWR) monitored well sites (Local I.D.:
B-04-19 33CCA) located approximately 3,000 feet northwest of the project site.
CORROSIVITY
The following table lists the results of laboratory soluble sulfate, soluble chloride, electrical resistivity, and pH testing. The values may be used to estimate potential corrosive characteristics of the on-site soils with respect to contact with the various underground materials which will be used for project construction.
Corrosivity Test Results Summary
Location Sample Depth (feet)
Soil Description pH Electrical Resistivity
(Ω-cm)
Soluble Sulfate Content (ppm)
Soluble Chloride Content (ppm)
B-4 0 – 5 Silty Sand with Gravel 8.2 173 402 2,083
B-5 0 – 5 Silty Clayey Sand 8.3 253 354 558
B-7 0 – 5 Silty Clayey Sand with Gravel 8.1 94 273 2,375
Results of soluble sulfate testing indicate that samples of the on-site soils tested classify as S0 according to Table 19.3.1.1 of Section 318 of the American Concrete Institute (ACI) Building Code https://gisweb.azwater.gov/waterresourcedata/GWSI.aspx
October 30, 2019 ■ Terracon Project No. 65195142
Responsive ■ Resourceful ■ Reliable 8
Requirements for Structural Concrete. Concrete should be designed in accordance with the provisions of the ACI Building Code Requirements for Structural Concrete, Section 318, Chapter 19.
These values should be used to help determine potential corrosive characteristics of the on-site soils with respect to contact with the various underground materials which will be used for project construction. Refer to Summary of Laboratory Results contained in Exploration Results section for the complete results of the corrosivity testing performed on the site soils in conjunction with this geotechnical exploration. The corrosion information presented is specific to the samples tested. If the actual soils that will be in contact with the structures at the site are different than those tested, then additional corrosion testing should be performed. Terracon is not a corrosion engineer, and our scope of work was limited to performing corrosion laboratory tests on selected samples, presenting these results, and providing a brief comparison of the results to selected criteria. A qualified corrosion engineer should be consulted if corrosion of underground utilities and structures is a concern.
SEISMIC CONSIDERATIONS
The seismic design requirements for buildings and other structures are based on Seismic Design Category. Site Classification is required to determine the Seismic Design Category for a structure.
The Site Classification is based on the upper 100 feet of the site profile defined by a weighted average value of either shear wave velocity, standard penetration resistance, or undrained shear strength in accordance with Section 20.4 of ASCE 7 and the International Building Code (IBC).
Based on the soil properties encountered at the site and as described on the exploration logs and results, it is our professional opinion that the Seismic Site Classification is D. Subsurface explorations at this site were extended to a maximum depth of 60½ feet. The site properties below the boring depth to 100 feet were estimated based on our experience and knowledge of geologic conditions of the general area. Additional deeper borings or geophysical testing may be performed to further evaluate the conditions below the current boring depths and evaluate if a different seismic site classification for the site is appropriate.
GEOTECHNICAL OVERVIEW
The project site appears suitable for the proposed construction based upon geotechnical conditions encountered in the borings, and provided our recommendations contained in this report are properly implemented in the design and construction. The following is a summary of the key geotechnical considerations for this project:
October 30, 2019 ■ Terracon Project No. 65195142
Responsive ■ Resourceful ■ Reliable 9 n The on-site near surface at the project site soils generally consist of sand and gravel with variable amounts of silt and clay. Field penetration test results near shallow foundation depths indicate that the relative density of the near surface sand and gravel soils is generally loose to very dense.
n Shallow spread footings, concrete ring wall foundations, and mat/slab foundations bearing on approved native undisturbed soils are recommended for support of the proposed structures, tanks, and equipment. The base of all foundation excavations should be free of water and loose soil, prior to placing concrete. Extremely wet, loose or disturbed material in the bottom of the foundation excavations should be removed before foundation concrete is placed. Should the soils at bearing level become excessively disturbed or saturated, the affected soil should be removed prior to placing concrete.
n The on-site soils are considered suitable for use as engineered fill in all construction areas.
n We anticipate the embankment side slopes in the evaporation ponds will be constructed at a slope ratio of 3H:1V. Compacted fill or excavation slopes constructed at these planned slope ratios and a maximum depth on the order of 5 feet below grade are considered safe for all soils on the site.
n It is anticipated that shallow excavations for the proposed construction can be accomplished with conventional earthmoving equipment.
n Based on the engineering properties of the soils encountered in the test borings, the Erosion Index (ER) Factor (based on published data) for these soils is considered to be in the range of 4 to 6 (on a scale of 0 to 10). Based on this ER Index, moderate erosion would be predictable under high velocity water discharge on slopes or due to wave action in ponds. However, the interior slope face of embankments within the proposed ponds will be lined; therefore, the liners should provide adequate erosion control on the face of the embankment slopes. Consideration for erosion control on the exterior embankment slopes are provided in the report.
n Based on the site soil properties, the site is classified as Site Class D in accordance with Chapter 20 of ASCE 7 as required by the 2012 International Building Code.
Geotechnical engineering recommendations for foundation systems, support of pond liners, embankments, and other earth connected phases of the project are outlined below. The recommendations contained in this report are based upon the results of field and laboratory testing (included in the Exploration Results section), engineering analyses, and our current understanding of the proposed project.
The General Comments section provides an understanding of the report limitations.
October 30, 2019 ■ Terracon Project No. 65195142
Responsive ■ Resourceful ■ Reliable 10
SHALLOW FOUNDATIONS
If the project site has been prepared in accordance with the requirements noted in Earthwork, the following design parameters are applicable for shallow foundations for proposed project.
Design Parameters – Spread Footings and Concrete Ring Wall Foundations, Design Item Description/Recommendations
Maximum Net Allowable
Bearing Pressure 1,2 3,000 psf
Minimum Embedment Depth Below finished grade 3 18 inches
Bearing Material Spread footings and concrete ring wall foundations may be supported on undisturbed native soils or engineered fill if required to raise site grades.
Minimum footing dimensions Isolated Column Footings: 24 inches Continuous Wall Footings: 18 inches
Estimated total settlement 2 1 inch or less
Estimated differential settlement 2 ¾ of the total settlement
1. The maximum net allowable bearing pressure is the pressure in excess of the minimum surrounding overburden pressure at the foundation base elevation. The allowable bearing pressure may be increased by one-third when considering the alternative load combinations of Section 1605.3.2 of the 2012 International Building Code, however, it should not be increased when loads are determined by the basic allowable stress design load combinations of Section 1605.3.1.
2. Values provided are for maximum loads noted in the Project Description.
3. Finished grade is defined as the lowest adjacent grade within 5 feet of the foundation for perimeter (or exterior) footings or concrete ring wall foundations and finished floor level for interior footings.
Footings, foundations, and walls should be reinforced as necessary to reduce the potential for distress caused by differential foundation movement. The use of joints at openings or other discontinuities in walls is recommended.
Foundation excavations should be observed by the geotechnical engineer. If the soil conditions encountered differ significantly from those presented in this report, supplemental recommendations will be required.
Mat/Slab Foundations
The proposed structures may be supported on mat/slab foundations. The following design parameters are applicable for mat/slab foundations. Specific attention should be given to positive drainage away from the structures.
October 30, 2019 ■ Terracon Project No. 65195142
Responsive ■ Resourceful ■ Reliable 11
Design Item Description/Recommendations Foundation Type Mat/Slab Foundations
Maximum Design Contact Stress1 Any practical value up to 3,000 psf
Bearing Material Mat/slab foundations may be supported on undisturbed native soils or engineered fill if required to raise site grades
Design Modulus of Subgrade Reaction, k 250 pci
Minimum Width 4 feet
Modulus Correction Factor2 kc=k((b+1)/2b)
Minimum Embedment Depth 12 inches
Total Estimated Settlement 1 inch or less
Differential Settlement ¾-inch over 4 feet
1.The maximum net allowable bearing pressure is the pressure in excess of the minimum surrounding overburden pressure at the foundation base elevation. The allowable bearing pressure may be increased by one-third when considering the alternative load combinations of Section 1605.3.2 of the 2012 International Building Code, however, it should not be increased when loads are determined by the basic allowable stress design load combinations of Section 1605.3.1.
2. It is common to reduce the k-value to account for dimensional effects of large loaded areas. Where kc is the corrected or design modulus value and b is the mat width (short dimension) or tributary loaded area.
Mat/slab foundations should be reinforced as necessary to reduce the potential for distress caused by differential foundation movement. The use of joints at openings or other discontinuities in walls is recommended.
Foundation excavations should be observed by the geotechnical engineer. If the soil conditions encountered differ significantly from those presented in this report, supplemental recommendations will be required.
Foundation Construction Considerations
As noted in Earthwork section of this report, foundation excavations should be evaluated and approved under the direction of the Geotechnical Engineer. The base of all foundation excavations should be free of water and loose soil, prior to placing concrete. Concrete should be placed soon after excavating to reduce bearing soil disturbance. Care should be taken to prevent wetting or drying of the bearing materials during construction. Extremely wet, loose or disturbed material in the bottom of the footing excavations should be removed before foundation concrete is placed. Should the soils at bearing level become excessively disturbed or saturated, the affected soil should be removed prior to placing concrete.
October 30, 2019 ■ Terracon Project No. 65195142
Responsive ■ Resourceful ■ Reliable 12
LATERAL EARTH PRESSURES
Design Parameters
The lateral earth pressure recommendations herein are applicable to the design of foundations and rigid retaining walls subject to slight rotation, such as cantilever, or gravity type concrete walls.
Earth Pressure Design Case1 Design Recommenations2,4
Active Case 35 psf/ft
Passive Case 375 psf/ft At-Rest Case 55 psf/ft
Coefficient of Base Friction 0.453
Total Unit Weight 115 pcf
1. For active earth pressure, wall must rotate about base, with top lateral movements 0.002 H to 0.004 H, where H is wall height. For passive earth pressure, wall must move horizontally to mobilize resistance.
2. The design values are based on utilizing on-site soils as backfill placed and compacted as outlined in the
Earthwork section of this report. Compaction of each lift adjacent to walls should be accomplished with hand-operated tampers or other lightweight compactors.
3. The coefficient of base sliding should be reduced to 0.30 when used in conjunction with passive pressure.
4. The lateral earth pressures herein do not include any factor of safety, they assume drained conditions and a horizontal backfill, and they are not applicable for submerged soils/hydrostatic loading. Additional recommendations may be necessary if such conditions are to be included in the design.
FLOOR SLABS
Floor slabs (non-pavement areas) should be designed based on the following geotechnical recommendations:
Floor Slab Design Parameters
Item Description Interior floor system Slab-on-grade concrete.
Subbase 4 inches of compacted aggregate base course materials
Floor slab support A minimum of 10 inches of engineered fill placed in accordance with the Earthwork section of this report.
Modulus of subgrade reaction1 250 pounds per square inch per inch (psi/in) for point loads
1. Modulus of subgrade reaction is an estimated value based upon our experience with the subgrade condition, the requirements noted in Earthwork section of this report, and the floor slab support as noted in this table.
October 30, 2019 ■ Terracon Project No. 65195142
Responsive ■ Resourceful ■ Reliable 13
Additional floor slab design and construction recommendations are as follows:
n Positive separations and/or isolation joints should be provided between slabs and all foundations, columns or utility lines to allow independent movement.
n Control joints should be provided in slabs to control the location and extent of cracking.
n Other design and construction considerations, as outlined in the ACI Design Manual, Section 302.1R are recommended.
n Some differential movement of a slab-on-grade floor system is possible on long-term settlement of the underlying materials. To reduce potential slab movements, the subgrade soils should be prepared as outlined in the Earthwork section of this report.
n The use of a vapor retarder or barrier should be considered beneath concrete slabs on grade that will be covered with wood, tile, carpet or other moisture sensitive or impervious coverings, or when the slab will support equipment sensitive to moisture. When conditions warrant the use of a vapor retarder, the slab designer and slab contractor should refer to ACI 302 and ACI 360 for procedures and cautions regarding the use and placement of a vapor retarder/barrier.
Floor Slab Construction Considerations
Finished subgrade within and for at least 10 feet beyond the floor slab should be protected from traffic, rutting, or other disturbance and maintained in a relatively moist condition until floor slabs are constructed. If the subgrade should become damaged or desiccated prior to construction of floor slabs, the affected material should be removed and engineered fill should be added to replace the resulting excavation. Final conditioning of the finished subgrade should be performed immediately prior to placement of the floor slab support course.
The Geotechnical Engineer should approve the condition of the floor slab subgrades immediately prior to placement of the floor slab support course, reinforcing steel and concrete. Attention should be paid to high traffic areas that were rutted and disturbed earlier, and to areas where backfilled trenches are located.
EARTHWORK
The following presents recommendations for site preparation, excavation, subgrade preparation and placement of engineered fills as well as erosion control and slope configurations on the project. The recommendations presented for design and construction of earth supported elements including foundations, floor slabs, pond liners, and embankments are contingent upon following the recommendations outlined in this section.
October 30, 2019 ■ Terracon Project No. 65195142
Responsive ■ Resourceful ■ Reliable 14
Earthwork on each project should be observed and evaluated by Terracon. The evaluation of earthwork should include observation and testing of engineered fill, subgrade preparation, foundation bearing soils, and other geotechnical conditions exposed during the construction of each project.
Site Preparation
Strip and remove existing vegetation, and other deleterious materials from proposed structures, tanks, equipment, and pond areas. Exposed surfaces should be free of mounds and depressions which could prevent uniform compaction. The sites should be initially graded to create a relatively flat surface to receive fill, and to provide for a relatively uniform thickness of fill beneath the proposed structures, tanks, equipment, and ponds.
Although evidence of fills or underground facilities such as septic tanks, cesspools, basements, and utilities was not observed during the site reconnaissance at each project site, such features could be encountered during construction. If unexpected fills or underground facilities are encountered, such features should be removed, and the excavation thoroughly cleaned prior to backfill placement and/or construction
Subgrade Preparation
Shallow spread footings, concrete ring wall foundations, and mat/slab foundations bearing on approved undisturbed native soils are recommended for support of the proposed structures, tanks, and equipment. If unsuitable bearing materials are encountered during construction at the base of the planned foundation excavations, the unsuitable material should be removed to the extents recommended by the geotechnical engineer. The proposed foundations could either bear directly on deeper approved native undisturbed soils or the deepened excavations could be backfilled to planned foundation bearing depth with engineered fill or with lean concrete placed in the excavations.
Subgrade soils beneath interior floor slabs and exterior slabs should be scarified, moisture conditioned and compacted to a minimum depth of 10 inches. The moisture content and compaction of subgrade soils should be maintained until slab construction.
Fill Material Types
All fill materials should be inorganic soils free of vegetation, debris, and fragments larger than four inches in size. Pea gravel or other similar non-cementitious, poorly-graded materials should not be used as fill or backfill without the prior approval of the geotechnical engineer.
Clean on-site soils or approved imported materials may be used as fill material for the following:
October 30, 2019 ■ Terracon Project No. 65195142
Responsive ■ Resourceful ■ Reliable 15
Fill Type 1 USCS Classification Acceptable Location for Placement
On-Site Soils SM, SC-SM, GP-GM, GP-GC
The near-surface on-site soils are considered suitable for use as engineered fill.
Low Volume Change:
Imported Material Varies All locations and elevations
1. Controlled, compacted fill should consist of approved materials that are free of organic matter, debris, and oversized materials. A sample of each material type should be submitted to the geotechnical engineer for evaluation.
Imported soils for use as fill material (if required) on the project should conform to low volume change materials as indicated in the following specifications:
Percent Finer by Weight Gradation (ASTM C 136)
4" No. 4 Sieve ..................................................................................... 50-100 No. 200 Sieve ............................................................ 15 (min) to 45 (max) n Liquid Limit ....................................................................... 30 (max) n Plasticity Index ................................................................. 12 (max) n Maximum expansive potential (%)* ............................................ 1.5
*Measured on a sample compacted to approximately 95 percent of the ASTM D698 maximum dry density at about 3 percent below optimum water content. The sample is confined under a 100 psf surcharge and submerged/inundated.
Engineered fill should be placed and compacted in horizontal lifts, using equipment and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .