Schedule of Items Little Bear
| SCHEDULE OF ITEMS | | | | | | |
| Location: Little Bear CG | | | | | | |
| Bid Item | Description | Location | QTY | Unit | Unit Price | TOTAL PRICE |
| 1 | GENERAL REQUIREMENTS AND MOBILIZATION | | | | | |
| A | Mobilization/Demobilization | Day Use + CG | 1 | LS | | |
| B | Construction Signing and Barricades for Public Closure | Day Use + CG | 1 | LS | | |
| C | Fencing for Tree Protection from Construction Activity | Day Use + CG | 1 | LS | | |
| D | Layout Erosion Control Materials | Day Use + CG | 1 | LS | | |
| MOBILIZATION Total | | Method of Measure | | LSQ | | |
| 2 | CONSTRUCTION SURVEYING AND STAKING | | | |
| A | Construction Surveying and Staking | Day Use + CG | 1 | LS |
| CONSTRUCTION SURVEYING AND STAKING Total | | Method of Measure | | LSQ |
| 3 | CLEARING AND GRUBBING | | | |
| A | Clearing and Grubbing | Day Use + CG | 1 | LS |
| CLEARING AND GRUBBING Total | | Method of Measure | | LSQ |
| 4 | DEMOLITION AND REMOVAL OF EXISTING INFRASTRUCTURE | | | |
| A | Demolition of existing vault toilets and associated concrete work | Day Use + CG | 4 | EA |
| B | Demolition of existing site furnishings - Day Use Area (boulder barriers, bulletin boards, signs, fish cleaning station) | Day Use Area | 1 | LS |
| C | Demolition of existing site furnishings - CG Area commons (boulder barriers, bulletin boards, signs) | Campground | 1 | LS |
| D | Demolition of existing site furnishings - CG Area individual sites (fire rings, picnic tables, grills, tent pads, signs) | Campground | 36 | EA |
| E | Demolition of existing asphalt path between fishing pier and bathroom and misc flatwork | Campground | 2500 | SF |
| DEMOLITION AND REMOVAL OF EXISTING INFRASTRUCTURE Total | | Method of Measure | | LSQ |
| 5 | DEMOLITION AND REMOVAL OF EXISTING TREES | | | |
| A | Demolition and Removal of Existing Trees | Day Use + CG | 151 | EA |
| DEMOLITION AND REMOVAL OF EXISTING TREES Total | | Method of Measure | | AQ |
| 6 | ROAD IMPROVEMENTS - ROAD GRADING AND DRAINAGE | | | |
| A | Road Improvements (Widening and reshaping of road, construction of ditches and swales, construction of culverts, resurfacing of dayuse parking w/ gravel) | Day Use + CG | 1 | LS |
| ROAD IMPROVEMENTS - ROAD GRADING AND DRAINAGE Total | | Method of Measure | | LSQ |
| 7 | CAMPGROUND WATER DISTRIBUTION SYSTEM REPLACEMENT | | | |
| A | Water line w/ rock excavation (WATER) | Day Use + CG | 1 | LS |
| B | Appurtenances: Valves, water fill stations, air relief, etc (WATER) | Day Use + CG | 1 | LS |
| C | Host site sewage holding tank includes connections & piping (SEWER) | Day Use + CG | 1 | LS |
| CAMPGROUND WATER DISTRIBUTION SYSTEM REPLACEMENT Total | | Method of Measure | | LSQ |
| 8 | ELECTRICAL SERVICE - BASE BID | | | |
| A | Additional excavation (not shared with water line) | Entire Site | 100 | LF |
| B | 50 Amp Pedestals | Entire Site | 1 | EA |
| C | 30 Amp Pedestals | Entire Site | 0 | EA |
| D | Main distribution panel | Entire Site | 1 | EA |
| E | Metering Equipment | Entire Site | 1 | EA |
| F | Wire and conduit | Entire Site | 1 | LS |
| G | Trenching Per DMEA Specs for Primary Power (excavate and backfill) | Entire Site | 2300 | LF |
| H | Primary Wire, conduit and Elec Vaults (2) - DMEA Equipment Cost | Entire Site | 1 | LS |
| ELECTRICAL SERVICE - BASE BID Total | | | | |
| 9 | CAMPGROUND IMPROVEMENTS | | | |
| CAMPGROUND COMMON AREAS | | | |
| A | Pit Toilet Replacement & 5' Concrete apron (Includes structure, delivery and site preperation) | Campground | 3 | EA |
| B | Fee Station Bulletin Board | Campground | 1 | EA |
| C | Fee Station Tube Replacement | Campground | 1 | EA |
| D | Overall Campground Wayfinding Signage | Campground | 1 | LS |
| E | Overall Campground Walkways (Access to Existing fishing pier and Island Lake hiking trail) | Campground | 283 | LF |
| F | Overall Campground Boulder Barrier Rocks | Campground | 70 | EA |
| G | Overall Campground ORAR Path to restrooms (4' width) | Campground | 150 | LF |
| H | Dumpster Pad | Campground | 3 | EA |
| I | 6' Three-sided Fence Enclosure for Dumpster Pad | Campground | 3 | EA |
| J | 3-Panel Fee Station Kiosk | Campground | 1 | EA |
| CAMPGROUND COMMON AREAS Total | | | | |
| CAMPSITES | | | |
| K | Stone Retaining Walls within campsites (maximum 2.5' retaining per boulder course) | Campground | 189 | LF |
| L | Timber Stairs within campsites (5 - risers / approx. 30" grade change) | Campground | 16 | EA |
| M | Walkways connecting parking spurs and campsites (3' width typ) | Campground | 754 | LF |
| N | Campsite Improvements - Site Type 1 (New Construction, Back-In) | | | | |
| 1 | | Site Grading and Leveling | CG Site | 6 | EA |
| 2 | | Parking Spur - Aggregate Base Course | CG Site | 6 | EA |
| 3 | | Metal Wheelstop | CG Site | 6 | EA |
| 4 | | Picnic Table | CG Site | 6 | EA |
| 2 | | Fire Ring | CG Site | 6 | EA |
| 3 | | Tent Pad | CG Site | 6 | EA |
| 4 | | Facility Pad | CG Site | 6 | EA |
| 5 | | Bear Box | CG Site | 6 | EA |
| 9 | | Site Signage - Campground ID Marker | CG Site | 6 | EA |
| O | Campsite Improvements - Site Type 2A (New Construction, Pull-Through) | | | | |
| 2 | | Site Grading and Leveling | CG Site | 2 | EA |
| 1 | | Parking Spur - Aggregate Base Course | CG Site | 2 | EA |
| 3 | | Picnic Table | CG Site | 2 | EA |
| 4 | | Fire Ring | CG Site | 2 | EA |
| 5 | | Tent Pad | CG Site | 2 | EA |
| 6 | | Facility Pad | CG Site | 2 | EA |
| 7 | | Bear Box | CG Site | 2 | EA |
| 8 | | Site Signage - Campground ID Marker | CG Site | 2 | EA |
| P | Campsite Improvements - Site Type 2B (New Construction, Pull-Through, no tent pad) | | | | |
| 1 | | Site Grading and Leveling | CG Site | 1 | EA |
| 2 | | Parking Spur - Aggregate Base Course | CG Site | 1 | EA |
| 3 | | Picnic Table | CG Site | 1 | EA |
| 4 | | Fire Ring | CG Site | 1 | EA |
| 5 | | Facility Pad | CG Site | 1 | EA |
| 6 | | Bear Box | CG Site | 1 | EA |
| 7 | | Site Signage - Campground ID Marker | CG Site | 1 | EA |
| Q | Campsite Improvements - Site Type 3 (Reconstruction, Back-In) | | | | |
| 1 | | Site Grading and Leveling | CG Site | 19 | EA |
| 2 | | Parking Spur - Aggregate Base Course | CG Site | 19 | EA |
| 3 | | Metal Wheelstop | CG Site | 19 | EA |
| 4 | | Picnic Table | CG Site | 19 | EA |
| 5 | | Fire Ring | CG Site | 19 | EA |
| 6 | | Tent Pad | CG Site | 19 | EA |
| 7 | | Facility Pad | CG Site | 19 | EA |
| 8 | | Bear Box | CG Site | 19 | EA |
| 9 | | Site Signage - Campground ID Marker | CG Site | 19 | EA |
| R | Campsite Improvements - Site Type 4 (Reconstruction, Pull-Through) | | | | |
| 1 | | Site Grading and Leveling | CG Site | 6 | EA |
| 2 | | Parking Spur - Aggregate Base Course | CG Site | 6 | EA |
| 3 | | Picnic Table | CG Site | 6 | EA |
| 4 | | Fire Ring | CG Site | 6 | EA |
| 5 | | Tent Pad | CG Site | 6 | EA |
| 6 | | Facility Pad | CG Site | 6 | EA |
| 7 | | Bear Box | CG Site | 6 | EA |
| 8 | | Site Signage - Campground ID Marker | CG Site | 6 | EA |
| CAMPSITES Total |
| CAMPGROUND IMPROVEMENTS Total |
| 10 | DAY USE AREA IMPROVEMENTS | | | |
| A | Steel Wheel Stops | Day Use Area | 2 | EA |
| B | Pit Toilet Replacement & Concrete apron (Includes structure, delivery and site preperation) | Day Use Area | 1 | EA |
| C | Accessible Concrete Path to Pit Toilet | Day Use Area | 423 | SF |
| D | Accessible Concrete Path to Pit Toilet | Day Use Area | 2 | EA |
| E | Interpretive Signage and Infrastructure | Day Use Area | 1 | LS |
| F | Boulder Barrier Rocks | Day Use Area | 45 | EA |
| G | Shore Path to Kayak Area | Day Use Area | 95 | LF |
| H | Shore Path to Kayak Area Stone Steps | Day Use Area | 2 | EA |
| I | New Paths to Existing Shoreline Paths | Day Use Area | 280 | LF |
| DAY USE IMPROVEMENTS Total | | | | |
| 11 | AS-BUILT DRAWINGS | | | |
| A | All materials, equipment, labor and incidentals to produce electronic and hard copy as-built drawings. | Entire Site | 1 | LS |
| AS-BUILT DRAWINGS Total | | | | |
PROJECT BASE BID TOTAL
| 12 | ALTERNATES | | | | |
| ALT 1 | Campsite Improvements - Site Type 5 (New Construction Tent Walk-In) | | | | |
| 1 | | Clearing and Grubbing | CG Site | 4 | EA |
| 2 | | Site Grading and Leveling | CG Site | 4 | EA |
| 3 | | Parking Space - Aggregate Base Course | Group Parking | 1932 | SF |
| 4 | | Metal Wheel Stop | Group Parking | 5 | EA |
| 5 | | Site Signage - Group Parking ADA Signage | Group Parking | 1 | EA |
| 6 | | Site Signage - Walk In Site Directional Signage | Group Parking | 1 | EA |
| 7 | | Picnic Table | CG Site | 4 | EA |
| 8 | | Fire Ring | CG Site | 4 | EA |
| 9 | | Tent Pad | CG Site | 4 | EA |
| 10 | | Facility Pad | CG Site | 4 | EA |
| 11 | | Bear Box | CG Site | 4 | EA |
| 12 | | Site Signage - Campground ID Marker | CG Site | 4 | EA |
| 13 | | Improved Path (Native Soil) | CG Site | 336 | LF |
| 14 | | Improved Path Stone Steps | CG Site | 3 | EA |
ALT 2 Accessible Fishing Platform Improvements - Re-level and form existing platforms, better accessibility and safer edges. As Shown 2 EA
ALT 3 Day Use Gravel Parking Area Improvement (Grading and refresh of aggregate base course surface, decommissioning and revegetation of existing gravel areas) Day Use Area 1 LS
ALT 4 Day Use Parking Area Asphalt Paving and Striping (requires inclusion of ALT 3 scope) Day Use Area 1 LS
ALT 5 Existing Boat Ramp Improvements (improved asphalt vehicular access, expanded concrete boat ramp slab, improved walkways/retaining) As Shown 1 LS
| ALT 6 | Electrical Service - Alternate 6 | | | | |
| A | | Additional excavation (not shared with water line) | Entire Site | 130 | LF |
| B | | 50 Amp Pedestals | Entire Site | 1 | EA |
| C | | 30 Amp Pedestals | Entire Site | 3 | EA |
| D | | Wire and Conduit | Entire Site | 1 | LS |
| ELECTRICAL SERVICE - Alternate 6 Total | | | | | |
| ALT 7 | Electrical Service - Alternate 7 (requires inclusion of ALT 6 scope) | | | | |
| A | | Additional excavation (not shared with water line) | Entire Site | 120 | LF |
| B | | 50 Amp Pedestals | Entire Site | 3 | EA |
| C | | 30 Amp Pedestals | Entire Site | 0 | EA |
| D | | Wire and Conduit | Entire Site | 1 | LS |
| ELECTRICAL SERVICE - Alternate 7 Total | | | | | |
| ALT 8 | Electrical Service - Alternate 8 (requires inclusion of ALT 6 and ALT 7 scopes) | | | | |
| A | | Additional excavation (not shared with water line) | Entire Site | 150 | LF |
| B | | 50 Amp Pedestals | Entire Site | 1 | EA |
| C | | 30 Amp Pedestals | Entire Site | 3 | EA |
| D | | Wire and Conduit | Entire Site | 1 | LS |
| ELECTRICAL SERVICE - Alternate 8 Total | | | | | |
| ALT 9 | Electrical Service - Alternate 9 (requires inclusion of ALT 6, ALT 7, and ALT 8 scopes) | | | | |
| A | | Additional excavation (not shared with water line) | Entire Site | 0 | LF |
| B | | 50 Amp Pedestals | Entire Site | 0 | EA |
| C | | 30 Amp Pedestals | Entire Site | 0 | EA |
| D | | Wire and Conduit | Entire Site | 1 | LS |
| ELECTRICAL SERVICE - Alternate 9 Total | | | | | |
PROJECT ALTERNATES TOTAL
| PROJECT BASE BID TOTAL |
| PROJECT ALTERNATES TOTAL |
| GRAND TOTAL |
| Unit: LS (Lump Sum), EA (Each), LF (Linear Feet), SF (Square Feet) |
| DO NOT PRINT LINE!!! - Budget - 3 MILLION | |