This is a Scope of Work document from the American Battle Monuments Commission (ABMC) for the renovation of the Saipan Memorial located within American Memorial Park in Saipan. The document outlines a comprehensive renovation project scheduled for January 2025.
The key work components include: demolition of a 33-foot tall bell tower and 10-foot curved wall with associated footings; relocation of five existing spotlights to illuminate the original memorial obelisk; repair of concrete paving, walls and benches; modification of soft landscaping to match original planting plan; removal of a flagpole and commemorative boulder; repair of access paths (100m south path and 15m north path); and protection of a historical Japanese Pillbox during construction. The contractor must complete all work within a six-week period, working Monday-Friday 8am-5pm. The contractor is responsible for obtaining all required permits, providing safety equipment and barriers, maintaining site cleanliness, and following strict safety protocols including OSHA standards and NFPA 241 requirements. Section 106 Consultation with the Commonwealth of North Mariana Islands' Division of Historic Preservation has been completed, confirming "no historic properties affected" except for preserving the Japanese Pillbox.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 74330225R0028 Vendor Questions.xlsx | XLSX spreadsheet | |
| 74330225R0028_Amendment1_5 Mar 25.pdf | ||
| 04 Saipan Memorial - Appendix A Plan.JPG | JPG image |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
32 rue de Monceau | 75008 Paris |France
Mailing address: US Embassy - ABMC, 18 avenue Gabriel | 75008 Paris, France T +33 (0)1 40 75 27 00 | FAX +33 (0)1 40 75 27 01 | WEB www.abmc.gov Page 1|8
AMERICAN BATTLE MONUMENTS
COMMISION
Facilities & Programs Directorate
RENOVATION OF SAIPAN MEMORIAL
SCOPE OF WORK
JANUARY 2025
http://www.abmc.gov/
T +33 (0)1 40 75 27 00 | FAX +33 (0)1 40 75 27 01 | WEB www.abmc.gov Page 2|8
1. Background:
The proposed project scope is reflected in the following ‘Existing’ and ‘Proposed’ plans and ‘Before’ and ‘After’ photos. It involves the removal of a 33-foot tall bell tower and 10-foot tall curved wall with all associated footings and relocation of five (5) existing spotlights to illuminate the original memorial obelisk.
Concrete paving, walls and benches to be repaired and soft landscape to be modified to match the original planting plan.
Existing Plan ‘Before’ Photo
Proposed Plan ‘After’ Photo
In relation to statutory permits, on 2 August 2024 ABMC received a letter from the ‘Division of Historic Preservation’ of the Commonwealth of the North Mariana Islands’ regarding the Section 106 Consultation.
With exception of a small Japanese Pillbox in the vicinity of the memorial that is to be preserved, the letter confirms that “no historic properties affected” and “no further archaeological work is required” as a consequence of ABMC’s proposal to restore the existing memorial to its original configuration.
Notwithstanding the above, it is the contractors responsibility to ensure he has acquired all the required statutory permits necessary prior to commencing the site works.
T +33 (0)1 40 75 27 00 | FAX +33 (0)1 40 75 27 01 | WEB www.abmc.gov Page 3|8
2. Memorial Location
The work will take place at the Saipan American Memorial, located within American Memorial Park.
The site location is highlighted in red below.
American Memorial Park, Saipan
3. Scope of Work:
The scope of work is outlined as follows:
a. Clean & Protect Existing Obelisk & Structures
i. Issue: Memorial obelisk is in good condition with only minor cleaning required. However, there exists a real risk of unintended damage during demolition works of adjacent wall and bell tower.
ii. Action: Contractor to carefully clean existing polished granite obelisk and submit a detailed photographic Dilapidation Report prior to commencing works, erect solid protection around the existing monument and take full responsibility for any damage to the obelisk and other existing structures during demolition and upgrade works.
Figure 1: Polished granite obelisk
T +33 (0)1 40 75 27 00 | FAX +33 (0)1 40 75 27 01 | WEB www.abmc.gov Page 4|8
b. Demolition of Bell Tower & Curved Wall
i. Issue: Erected in 1995, the 33-foot bell tower and curved wall are to be demolished. The bell tower is constructed of precast concrete panels fixed to a steel frame.
ii. Action: Contractor to study existing structure and provide method statement for demolition so unintended damage to the surrounding plaza is avoided. Contractor to also prepare inventory and valuation of salvaged materials for submission to client.
Figure 2: Existing bell tower & wall
c. Relocation of Spotlights
i. Issue: Existing spotlights (x5) have been installed to illuminate the bell tower.
ii. Action: The existing lights and associated bases and cables are to be carefully retained and relocated. The new positions, to be agreed, will illuminate the four faces of the obelisk.
Figure 3: Existing lighting
d. Refurbish Memorial Plaza Floor
i. Issue: Existing concrete floor is spalling. It appears that a topping (10mm) was added to the original concrete slabs. This has started to crack and delaminate from the original base.
ii. Action: Contractor to carefully remove topping, key exposed slab and apply a chemical bonding agent to ensure new topping layer is allowed to properly adhere. Existing paving levels and falls to be surveyed and replicated to avoid ponding. It is critical the new concrete topping mix is appropriate for the Saipan climate. Contractor will submit method statement along with product and warranty details for client/engineer approval.
Figure 4: Memorial plaza floor
e. Refurbish Memorial Plaza Benches
i. Issue: Existing concrete benches (x4) are chipped and damaged.
ii. Action: Clean all visible surfaces, horizontal and vertical.
Repair all damaged and chipped edges / corners using an approved concrete patching product. Apply an approved concrete resurfacing product to achieve a uniform appearance. It is critical the concrete repair mix is appropriate for the Saipan climate.
Contractor will submit method statement along with product and warranty details for client/engineer approval.
Figure 5: Memorial plaza benches
T +33 (0)1 40 75 27 00 | FAX +33 (0)1 40 75 27 01 | WEB www.abmc.gov Page 5|8
f. Refurbish Memorial Plaza Walls
i. Issue: The existing walls had embedded steel bolts supporting benches. The benches and supporting bolts were removed, and the holes patched. The repairs are unsightly.
ii. Action: Clean wall surfaces, horizontal and vertical. Grind or drill bolts 20mm below surface to allow surface repair. Apply an approved concrete resurfacing product to achieve a uniform appearance. It is critical the repair mix is appropriate for the Saipan climate. Contractor will submit method statement along with product and warranty details for client/engineer approval.
Figure 6: Memorial plaza walls
g. Install Memorial Plaza Planting
i. Issue: The ‘tradescantia spathacea’, or ‘Moses-in-the-cradle’ plants are what remains from the original 1982 memorial.
ii. Action: Based on the objective to restore the memorial to its original design, Contractor to remove existing grass, submit planting plan for approval and install ‘tradescantia spathacea’ and new topsoil. Planting plan to account for, and be coordinated with, relocated spotlights.
Figure 7: Memorial plaza soft landscape
h. Protect Japanese Pillbox
i. Issue: Saipan’s Division of Historic Preservation’s ‘Section
106’ review refers to “a small Japanese Pillbox”, or concrete ‘look-out post’ structure, located on the east side of the memorial.
It’s letter states “it is essential that this feature be preserved and avoided during demolition works.
ii. Action: Contractor to submit a detailed photographic Dilapidation Report prior to commencing works, erect solid protection around the existing pillbox and take full responsibility for any damage to it during demolition and upgrade works.
Figure 8: Japanese pillbox
i. Remove Commemorative Boulder
i. Issue: Existing boulder and commemorative plaque are part of the 1995 belltower installation.
ii. Action: Contractor to carefully remove boulder, demolish associated footings, dispose of all waste and make good soft landscape in this area.
Figure 9: Commemorative Boulder
T +33 (0)1 40 75 27 00 | FAX +33 (0)1 40 75 27 01 | WEB www.abmc.gov Page 6|8
j. Remove Flagpole
i. Issue: Existing flagpole located to the south of the memorial is no longer used.
ii. Action: Contractor to carefully remove flagpole, demolish associated footings, dispose of all waste and make good soft landscape in this area.
Figure 10: Flagpole
k. Repair Access Path (South)
i. Issue: Existing path south of the monument from the bridge is approximately 1.5m wide x 100m long. A 50m long section of the path nearest the bridge is cracked and damaged, creating potential trip hazards.
ii. Action: Contractor to carefully demolish damaged sections of existing path and dispose of all waste. Shop drawings and method statement to be submitted for client/engineer approval prior to installing new sections of reinforced concrete to match current specification and thickness. Make good soft landscape in this area as required on completion of new paths.
Figure 11: Access path south
l. Repair Access Path (North)
i. Issue: Existing path north of the monument is approximately 1.0m wide x 15m long. Whilst in reasonable condition it is undulating.
ii. Action: Contractor to carefully demolish damaged sections of existing path and dispose of all waste. Shop drawings and method statement to be submitted for client/engineer approval prior to installing new sections of reinforced concrete to match current specification and thickness. Make good soft landscape in this area as required on completion of new paths.
Figure 12: Access path north
4. Safety
4.1 General
Comply with the contract documents and contract clauses related to safety and health. In case of conflicts between Federal, State, and local safety and health requirements, the most stringent shall apply. Failure to comply with safety and health requirements may result in suspension of work. In the event of a perceived safety violation, Government/NPS staff may stop work until the safety violation is addressed. If Government/NPS staff requests that Contractor personnel stop work due to a safety violation, contact the Contracting Officer immediately for a resolution.
T +33 (0)1 40 75 27 00 | FAX +33 (0)1 40 75 27 01 | WEB www.abmc.gov Page 7|8
4.2 Products
4.2.1 First Aid: Provide adequate first aid equipment for all contract employees for the hazards associated with the types of ongoing construction work at the site. Government approval of first aid equipment is not required.
4.2.2 Personal Protective Equipment (PPE): Provide personal protective equipment (PPE) that meets applicable OSHA and ANSI standards for all contract employees. Government approval of PPE is not required.
4.3 Execution
4.3.1 Daily Safety Inspections: Conduct daily safety inspections and maintain safety reports.
4.3.2 Emergency Instructions: Display telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at work site.
4.3.3 Fire & Life Safety: Comply with requirements of the National Fire Protection Association (NFPA) 241 (Standards for Safeguarding Construction, Alteration, and Demolition Operations).
4.3.4 Hazardous Materials: Hazardous Materials: Explosive, flammable, poisonous, corrosive, oxidizing, irritating, or otherwise harmful substances that could cause death or injury.
Store hazardous materials in accordance with manufacturers and OSHA Subpart D requirements.
Display Material Safety Data Sheets (MSDS) in conspicuous locations at work site.
1. Immediately report spills of hazardous materials to NPS Dispatch at: 808-985-6170.
2. Maintain a spill emergency response kit.
3. Train employees how to respond to a spill and use emergency response kit.
4.3.5 Protective Equipment: Inspect personal protective equipment (PPE) daily and maintain in a serviceable condition. Clean, sanitize, and repair personal items as appropriate before issuing.
4.3.5.1 Hard Hats: A hard hat use area shall be designated by the Contractor, as applicable. Hard hats shall be worn by all personnel in hard hat use areas. It is a contractor’s responsibility to require persons working at or visiting the jobsite to wear hard hats at all times.
5. General Conditions
5.1 Lead Time
The contractor shall not commence work until notified by the Contracting Officer.
5.2 Site and Monument Access / Temporary Facilities
As the work areas are open to the public, the company will be required to take all the necessary measures to signal the site, day and night and will be responsible for any accident occurring from a signal defect.
5.2.1 Pedestrian Access Routes: Install routes to comply with the Architectural Barriers Act Accessibility Standards (ABAAS) if the affected pedestrian access route is accessible.
5.2.2. Traffic Control Devices: Install devices to comply with the Manual on Uniform Traffic Control Devices
(MUTCD).
T +33 (0)1 40 75 27 00 | FAX +33 (0)1 40 75 27 01 | WEB www.abmc.gov Page 8|8
5.2.3 Temporary Materials: Temporary materials may be new or used but they must be adequate for the required usage; they must not create an unsafe condition; and they must not violate the requirements of applicable codes and standards. Submit temporary materials for approval.
5.2.3.1 Safety Barrier Fence: Orange plastic fence, 4-feet height minimum, secured to self-supporting posts or steel posts driven into the ground no greater than 6-feet apart.
5.2.3.2 Barrier Tape: Yellow tape imprinted with “CAUTION: CONSTRUCTION AREA,” manufactured by Reef Industries, Inc. Houston, Texas, or approved equal.
5.2.3.3 Traffic Control Devices: Varies depending on project scope and site.
5.2.4 Temporary Equipment
5.2.4.1 Fire Extinguishers: Portable, UL rated, with class and extinguishing agent as required by locations and classes of fire exposures. Provide sufficient number of extinguishers per NFPA. Submit temporary equipment for approval.
5.2.4.2 Fire Protection: Install and maintain temporary fire-protection systems of the types needed to protect against reasonably predictable and controllable fire losses in compliance with applicable codes and standards. Comply with NFPA 241.
5.2.4.3. Safety Barriers: For controlled sites, the Contractor shall construct and maintain a safety barrier fence marked with barrier tape to discourage people from entering the project site. Note that the Contractor is responsible for safety and accident prevention at the jobsite.
5.3 Contractors Responsibilities
Materials, goods, and workmanship shall be of the highest quality. Upon completion of the work on site it is to be left clear and free and in an immaculate state.
The contractor may work within normal construction hours unless otherwise agreed and generally these should be between 8am and 5pm Monday to Friday and not on weekends or federal holidays. The contractor should be aware of the activities that take place in the vicinity of the working area of the site and respect these accordingly, this will include screening of storage areas.
No radios or music players will be permitted on site.
No smoking on site unless in designated areas.
Contractor to allow for their own toilet provision.
5.4 Work Completion
All activities under this Contract must be completed to an agreed schedule within a six-week period.
Enclosures :
Appendix A – Plan http://www.abmc.gov/
| 1. Background: |
| The proposed project scope is reflected in the following ‘Existing’ and ‘Proposed’ plans and ‘Before’ and ‘After’ photos. It involves the removal of a 33-foot tall bell tower and 10-foot tall curved wall with all associated footings and relocation of ... |
| ‘Before’ Photo |
| Existing Plan |
| ‘After’ Photo |
| Proposed Plan |
| In relation to statutory permits, on 2 August 2024 ABMC received a letter from the ‘Division of Historic Preservation’ of the Commonwealth of the North Mariana Islands’ regarding the Section 106 Consultation. With exception of a small Japanese Pillbox... |
| Notwithstanding the above, it is the contractors responsibility to ensure he has acquired all the required statutory permits necessary prior to commencing the site works. |
| 2. Memorial Location |
| The work will take place at the Saipan American Memorial, located within American Memorial Park. |
| The site location is highlighted in red below. |
| 3. Scope of Work: |
| The scope of work is outlined as follows: |
| a. Clean & Protect Existing Obelisk & Structures |
| i. Issue: Memorial obelisk is in good condition with only minor cleaning required. However, there exists a real risk of unintended damage during demolition works of adjacent wall and bell tower. |
| ii. Action: Contractor to carefully clean existing polished granite obelisk and submit a detailed photographic Dilapidation Report prior to commencing works, erect solid protection around the existing monument and take full responsibility for any damage to the obelisk and other existing structures during demolition and upgrade works. |
| / |
| b. Demolition of Bell Tower & Curved Wall |
| i. Issue: Erected in 1995, the 33-foot bell tower and curved wall are to be demolished. The bell tower is constructed of precast concrete panels fixed to a steel frame. |
| ii. Action: Contractor to study existing structure and provide method statement for demolition so unintended damage to the surrounding plaza is avoided. Contractor to also prepare inventory and valuation of salvaged materials for submission to client. |
| / |
| c. Relocation of Spotlights |
| i. Issue: Existing spotlights (x5) have been installed to illuminate the bell tower. |
| ii. Action: The existing lights and associated bases and cables are to be carefully retained and relocated. The new positions, to be agreed, will illuminate the four faces of the obelisk. |
| / |
| d. Refurbish Memorial Plaza Floor |
| i. Issue: Existing concrete floor is spalling. It appears that a topping (10mm) was added to the original concrete slabs. This has started to crack and delaminate from the original base. |
| ii. Action: Contractor to carefully remove topping, key exposed slab and apply a chemical bonding agent to ensure new topping layer is allowed to properly adhere. Existing paving levels and falls to be surveyed and replicated to avoid ponding. It is critical the new concrete topping mix is appropriate for the Saipan climate. Contractor will submit method statement along with product and warranty details for client/engineer approval. |
| / |
| e. Refurbish Memorial Plaza Benches |
| i. Issue: Existing concrete benches (x4) are chipped and damaged. |
| ii. Action: Clean all visible surfaces, horizontal and vertical. Repair all damaged and chipped edges / corners using an approved concrete patching product. Apply an approved concrete resurfacing product to achieve a uniform appearance. It is critical the concrete repair mix is appropriate for the Saipan climate. Contractor will submit method statement along with product and warranty details for client/engineer approval. |
| / |
| f. Refurbish Memorial Plaza Walls |
| i. Issue: The existing walls had embedded steel bolts supporting benches. The benches and supporting bolts were removed, and the holes patched. The repairs are unsightly. |
| ii. Action: Clean wall surfaces, horizontal and vertical. Grind or drill bolts 20mm below surface to allow surface repair. Apply an approved concrete resurfacing product to achieve a uniform appearance. It is critical the repair mix is appropriate for the Saipan climate. Contractor will submit method statement along with product and warranty details for client/engineer approval. |
| / |
| g. Install Memorial Plaza Planting |
| i. Issue: The ‘tradescantia spathacea’, or ‘Moses-in-the-cradle’ plants are what remains from the original 1982 memorial. |
| ii. Action: Based on the objective to restore the memorial to its original design, Contractor to remove existing grass, submit planting plan for approval and install ‘tradescantia spathacea’ and new topsoil. Planting plan to account for, and be coordinated with, relocated spotlights. |
| / |
| h. Protect Japanese Pillbox |
| i. Issue: Saipan’s Division of Historic Preservation’s ‘Section 106’ review refers to “a small Japanese Pillbox”, or concrete ‘look-out post’ structure, located on the east side of the memorial. It’s letter states “it is essential that this feature be preserved and avoided during demolition works. |
| ii. Action: Contractor to submit a detailed photographic Dilapidation Report prior to commencing works, erect solid protection around the existing pillbox and take full responsibility for any damage to it during demolition and upgrade works. |
| / |
| i. Remove Commemorative Boulder |
| i. Issue: Existing boulder and commemorative plaque are part of the 1995 belltower installation. |
| ii. Action: Contractor to carefully remove boulder, demolish associated footings, dispose of all waste and make good soft landscape in this area. |
| / |
| j. Remove Flagpole |
| i. Issue: Existing flagpole located to the south of the memorial is no longer used. |
| ii. Action: Contractor to carefully remove flagpole, demolish associated footings, dispose of all waste and make good soft landscape in this area. |
| / |
| k. Repair Access Path (South) |
| i. Issue: Existing path south of the monument from the bridge is approximately 1.5m wide x 100m long. A 50m long section of the path nearest the bridge is cracked and damaged, creating potential trip hazards. |
| ii. Action: Contractor to carefully demolish damaged sections of existing path and dispose of all waste. Shop drawings and method statement to be submitted for client/engineer approval prior to installing new sections of reinforced concrete to match current specification and thickness. Make good soft landscape in this area as required on completion of new paths. |
| / |
| l. Repair Access Path (North) |
| i. Issue: Existing path north of the monument is approximately 1.0m wide x 15m long. Whilst in reasonable condition it is undulating. |
| ii. Action: Contractor to carefully demolish damaged sections of existing path and dispose of all waste. Shop drawings and method statement to be submitted for client/engineer approval prior to installing new sections of reinforced concrete to match current specification and thickness. Make good soft landscape in this area as required on completion of new paths. |
| / |
| 4. Safety |
| 4.1 General |
| Comply with the contract documents and contract clauses related to safety and health. In case of conflicts between Federal, State, and local safety and health requirements, the most stringent shall apply. Failure to comply with safety and health requi... |
| 4.2 Products |
| 4.2.1 First Aid: Provide adequate first aid equipment for all contract employees for the hazards associated with the types of ongoing construction work at the site. Government approval of first aid equipment is not required. |
| 4.2.2 Personal Protective Equipment (PPE): Provide personal protective equipment (PPE) that meets applicable OSHA and ANSI standards for all contract employees. Government approval of PPE is not required. |
| 4.3 Execution |
| 4.3.1 Daily Safety Inspections: Conduct daily safety inspections and maintain safety reports. |
| 4.3.2 Emergency Instructions: Display telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at work site. |
| 4.3.3 Fire & Life Safety: Comply with requirements of the National Fire Protection Association (NFPA) 241 (Standards for Safeguarding Construction, Alteration, and Demolition Operations). |
| 4.3.4 Hazardous Materials: Hazardous Materials: Explosive, flammable, poisonous, corrosive, oxidizing, irritating, or otherwise harmful substances that could cause death or injury. |
| Store hazardous materials in accordance with manufacturers and OSHA Subpart D requirements. |
| Display Material Safety Data Sheets (MSDS) in conspicuous locations at work site. |
| 1. Immediately report spills of hazardous materials to NPS Dispatch at: 808-985-6170. |
| 2. Maintain a spill emergency response kit. |
| 3. Train employees how to respond to a spill and use emergency response kit. |
| 4.3.5 Protective Equipment: Inspect personal protective equipment (PPE) daily and maintain in a serviceable condition. Clean, sanitize, and repair personal items as appropriate before issuing. |
| 4.3.5.1 Hard Hats: A hard hat use area shall be designated by the Contractor, as applicable. Hard hats shall be worn by all personnel in hard hat use areas. It is a contractor’s responsibility to require persons working at or visiting the jobsite to w... |
| 5. General Conditions |
| 5.1 Lead Time |
| The contractor shall not commence work until notified by the Contracting Officer. |
| 5.2 Site and Monument Access / Temporary Facilities |
| As the work areas are open to the public, the company will be required to take all the necessary measures to signal the site, day and night and will be responsible for any accident occurring from a signal defect. |
| 5.2.1 Pedestrian Access Routes: Install routes to comply with the Architectural Barriers Act |
| Accessibility Standards (ABAAS) if the affected pedestrian access route is accessible. |
| 5.2.2. Traffic Control Devices: Install devices to comply with the Manual on Uniform Traffic Control Devices (MUTCD). |
| 5.2.3 Temporary Materials: Temporary materials may be new or used but they must be adequate for the required usage; they must not create an unsafe condition; and they must not violate the requirements of applicable codes and standards. Submit temporar... |
| 5.2.3.1 Safety Barrier Fence: Orange plastic fence, 4-feet height minimum, secured to self-supporting posts or steel posts driven into the ground no greater than 6-feet apart. |
| 5.2.3.2 Barrier Tape: Yellow tape imprinted with “CAUTION: CONSTRUCTION AREA,” |
| manufactured by Reef Industries, Inc. Houston, Texas, or approved equal. |
| 5.2.3.3 Traffic Control Devices: Varies depending on project scope and site. |
| 5.2.4 Temporary Equipment |
| 5.2.4.1 Fire Extinguishers: Portable, UL rated, with class and extinguishing agent as required by locations and classes of fire exposures. Provide sufficient number of extinguishers per NFPA. Submit temporary equipment for approval. |
| 5.2.4.2 Fire Protection: Install and maintain temporary fire-protection systems of the types needed to protect against reasonably predictable and controllable fire losses in compliance with applicable codes and standards. Comply with NFPA 241. |
| 5.2.4.3. Safety Barriers: For controlled sites, the Contractor shall construct and maintain a safety barrier fence marked with barrier tape to discourage people from entering the project site. Note that the Contractor is responsible for safety and acc... |
| 5.3 Contractors Responsibilities |
| Materials, goods, and workmanship shall be of the highest quality. Upon completion of the work on site it is to be left clear and free and in an immaculate state. |
| The contractor may work within normal construction hours unless otherwise agreed and generally these should be between 8am and 5pm Monday to Friday and not on weekends or federal holidays. The contractor should be aware of the activities that take pla... |
| No radios or music players will be permitted on site. |
| No smoking on site unless in designated areas. |
| Contractor to allow for their own toilet provision. |
| 5.4 Work Completion |
| All activities under this Contract must be completed to an agreed schedule within a six-week period. |
| Enclosures : |
| Appendix A – Plan |
File details come from the government source that posted it. Updated .