This statement of work and solicitation are for a roof replacement project at Big South Fork National River and Recreation Area. The National Park Service seeks a contractor to remove and replace approximately 2880 square feet of asphalt shingles and underlayment on the Tennessee Log Dorm. The work must be completed within 30 days of notice to proceed. The solicitation is a 100% small business set-aside with a NAICS code of 238160 and size standard of $16.5 million. The period of performance is from March 1st to May 1st, 2024. Interested offerors must ensure registration in the System for Award Management and submit any questions by February 21st, with quotes due by February 27th.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P5324Q0012_Amd_0002.pdf | ||
| BISO_256734A_SignIn_0002.pdf | ||
| A6_-_140P5324Q00012_Questions_and_Answers_0001.pdf | ||
| Sol_140P5324Q0012_Amd_0001.pdf | ||
| A5_-_Additional_Pictures_0001.pdf | ||
| A4_-_BISO_256734A_SOW_Revised_0001.pdf | ||
| Sol_140P5324Q0012.pdf | ||
| Construction_Contract_Administration.docx | DOCX document | |
| A2_-_DOL_Wage_Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Big South Fork National River and Recreation Area
Oneida, TN
Statement of Work
“Cyclic Asphalt Shingle Replacement on TN Log Dorm”
January 24, 2024
NATIONAL PARK SERVICE
INTERIOR REGION 2, SOUTH ATLANTIC GULF
NORTH MAJOR ACQUISITION BUYING OFFICE
SOW Format
1. BACKGROUND:
2. PROJECT IDENTIFIERS:
3. PLACE OF PERFORMANCE:
4. PERIOD OF PERFORMANCE:
5. SCOPE:
6. TASK:
7. GENERAL WORK REQUIREMENTS:
8. MANAGEMENT:
9. SAFETY AND ENVIRONMENTAL COMPLIANCE:
10. INSURANCE:
11. CONTRACTOR USE OF SITE:
12. MOTOR VEHICLE AND TRAFFIC REGULATIONS:
13. EMPLOYEES BADGES/PARKING:
14. NON-PAYMENT FOR ADDITIONAL WORK:
15. CONFLICT OF INTEREST:
16. INSPECTION:
17. GOVERNMENT-FURNISHED PROPERTY, MATERIAL, EQUIPMENT, OR INFORMATION:
18. SECURITY:
19. TRAVEL:
20. FOOD STORAGE GUIDELINES:
21. PROJECT PERSONNEL:
1. BACKGROUND:
The Big South Fork National River and Recreation Area (BISO), located along the eastern border of Kentucky and Tennessee, encompasses an expansive area of approximately 125,000 acres. Established by Congress on March 7, 1974, BISO is committed to preserving its rich natural and cultural heritage for present and future generations. The park is known for its diverse landscapes, including the Big South Fork of the Cumberland River and its tributaries, which contribute significantly to both the ecological integrity of the region and recreational opportunities for visitors.
In line with BISO's commitment to sustainability and efficient asset management, a timely cyclic roofing project is planned for the Tennessee Log Dorm. This initiative involves removing the current asphalt shingles and associated roofing components, replacing them with sustainable materials that offer enhanced longevity and reduced maintenance needs. The introduction of a
30-year architectural shingle will extend the roof's life expectancy, while an upgraded venting system is designed to improve air circulation, and lower utility costs.
2. PROJECT IDENTIFIERS:
PMIS NUMBER: 256734A
PROJECT TITLE: “Cyclic Asphalt Shingle Replacement on TN Log Dorm”
3. PLACE OF PERFORMANCE:
Work for this project will take place at the Tennessee Log Dorm located at:
4024 Leatherwood Road, Oneida, TN 37841 (please see map below)
4. PERIOD OF PERFORMANCE:
The contractor shall have no more than 30 calendar days to complete removal and replacement of roofing components as outlined below once the offeror receives the notice to proceed, with the only exceptions being unforeseen events beyond the contractor's control and/or delays that are caused by the National Park Service.
5. SCOPE:
The National Park Service will contract the removal and replacement of all roofing components associated with the TN Log Dorm as outlined and specified below. All materials, supplies, services, and construction necessary to fully execute the awarded project shall be the responsibility of the contractor, accruing no additional cost to the government.
6. TASK and SPECIFICATIONS:
MATERIAL REMOVAL
• The contractor shall remove approximately 2880 ft2 of asphalt shingles and moisture barrier underlayment.
• The contractor shall remove the currently installed drip edge.
• The contractor shall remove all flashing from around any roof protrusions or vertical surfaces.
• The contractor shall remove all rubber stack-boots from around plumbing vents.
• The contractor shall collect all removed material and dispose of it at an appropriate facility off park property.
• The contractor shall install tarps, drop-cloths, or similar means to ensure all debris is caught and collected.
• As sheeting material is exposed, the contractor shall immediately notify the COR of any noted damage.
• In the event of damage being discovered the COR will notify the park carpenter, and the
National Park Service will correct any noted damage to the roof sheeting.
• All established entry and exit routes shall remain open and operational for the safe means of egress in the event of emergency. Entry and Exit doors shall not be blocked during any project execution phase or task.
• Work shall be performed around and above entry and exit routes. The contractor shall perform tasks in a manner that the routes remain operational. For example, if a ladder is placed in front of a door to execute a task or if materials are falling from overhead, the contractor shall communicate to the COR that work is taking place around the door. The contractor shall protect pedestrians from all potential safety impacts.
COMPONENT INSTALLATION
• The contractor shall install new 30# felt moisture barrier or a synthetic equivalent per manufacturer’s recommendations.
• The contractor shall install new drip edge, flashing, step-flashing, vents, stack-boots, and coil stock per manufacturer’s recommendations.
• The contractor shall utilize a starter strip designed for architectural style shingles per manufacturer’s recommendations or may use an equivalent quality 30-year, 3-tab shingles as a starter strip if desired.
• The contractor shall install approximately 2880 ft2 30-year, Architectural shingle.
• New shingles shall match the color shade of the removed shingles. A material/color sample shall be provided to the COR for approval before shingles are purchased and applied.
• The contractor shall replace the existing ridge vent system. Should the selected new ridge vent system necessitate roof alterations, the contractor shall modify the existing openings accordingly, which may include enlarging or otherwise adapting them to fit the new system.
• The contractor shall install shingle caps along the ridge vent per manufacturer’s recommendations.
• The contractor shall install permanent roof anchors, for employee fall protection, approximately every 10’- 14’ along the roof ridge, spaced for practical usage. Anchors shall not be placed within 6’ of the gable end. Anchors shall be designed to accept lanyards with D-clips and permanently mounted to withstand 1,800 lbs. of force for an employee with a body harness. The anchorage shall be rigid and shall not have a deflection greater than 0.04 inches when a force of 2,250 lbs. is applied, per OSHA 29
CFR 1926.502(d)(15). The contractor shall submit proposed anchors to the COR for approval before purchasing or installing fall arrest components.
• In the event of inclement weather, contractor shall be responsible for protection of the roof, and exposed building components against said weather. Damage incurred due to failure to protect will be corrected by the contractor at no additional cost to the government.
• Any components of the buildings or grounds that are damaged during the project shall be repaired and returned to its original condition by the contractor at no cost to the government.
• The newly installed roofing system and all its components shall be covered under a 1-year workmanship warranty.
• If the contractor utilizes a construction dumpster or dump truck, the contractor shall coordinate the identification of septic tanks and leach fields to avoid potential damage.
Only construction debris shall be placed in dumpsters or dump trucks. Food or similar items shall not be permitted to be disposed of in construction dumpsters or dump trucks.
The contractor shall dispose of food related items in bear proof refuse or bear proof recycle containers.
7. GENERAL WORK REQUIREMENTS:
Work Hours: 8:00 am to 4:30 pm (Eastern Time)
Monday through Friday, excluding federal holidays.
Contractor shall coordinate the on-site work schedule with the Contracting Officer and the COR five working days prior to the performance start date. The COR may be reached by office or mobile phone during normal business hours. Work outside of normal business hours must be requested 14 days prior and shall pre-approved by the Contracting Officer and the COR. All site visits and correspondence shall take place during the listed work hours above.
8. MANAGEMENT:
The contractor shall manage the total work effort in accordance with effective and efficient management principles and safe working practices to ensure on time completion of this contract.
9. SAFETY AND ENVIRONMENTAL COMPIANCE:
• The contractor shall comply with pertinent provisions of the Occupational Safety and
Health Act (OSHA), state, local, safety, laws, and all pertinent provisions of the contract.
• The contractor shall comply with pertinent Environmental Protection Agency laws.
• All tools, equipment and other related materials shall be removed at the end of each workday and the area shall be left neat and clean.
• The contractor shall comply with all provisions of NHPA and NEPA compliance documents that will be provided by Big South Fork staff.
• The BISO Safety Officer has the authority to issue restraint or cease-and-desist orders to the contractor when violations or unsafe acts are present and threaten government and contractor employees or damage to government property.
• The contractor shall immediately report to the Contracting Officer, COR and BISO safety officer all accidents resulting in employee injury, death, or damage to property while performing this contract.
• The contractor shall supply a site/project specific safety plan with all submittal packages.
10. INSURANCE:
• The Contractor shall be insured in accordance with Tennessee insurance regulations and pertinent provisions of the Contract. The government is not responsible for damage or theft to Contractor’s equipment, vehicles, tools, or materials or their employees and any personal property brought on site. The government will not accept any liability due to
Contractor employee negligence.
• Workers Compensation- The contractor shall furnish proof of worker’s compensation insurance to the Contracting Officer for those employees performing work related to this contract and shall comply with the Workman’s Compensation Laws of Tennessee
• Liability- Contractor shall maintain a level of insurance that will protect the Contractor and Government from any claims as a result of bodily injury (including death) and property damage which may arise from and during the performance of this contract and shall submit proof of insurance to the Contracting Officer.
11. CONTRACTOR USE OF SITE:
Contractor shall have limited use of the construction site for construction-related operations only.
Limited use of premises to areas within the Contract indicated in the specifications. Do not disturb portions of the project site beyond areas in which the work is indicated. Contractor will prevent damage to natural surroundings. Damage to natural surroundings will be restored through NPS-approved methods for repairing or replanting, at no additional cost to the government.
12. MOTOR VEHICLE AND TRAFFIC REGULATIONS:
Contractor, sub-contractor, and material supplier employees (altogether referred to as “contractor employees” in paragraphs 12, 13, 21 and 23) operating motor vehicles shall possess a valid driver's license. Permits, licenses, registrations and proof of insurance documents shall be always maintained in all contractor employee vehicles and made available upon request. Contractor employees shall always comply with federal vehicle motor laws requiring seat belts be worn.
Contractor employees shall adhere to the posted speed limits. Contractor employees are expected to comply with all BISO regulations.
13. EMPLOYEES BADGES/PARKING:
All contractor employees shall comply with parking procedures published for BISO. Contractor employees shall return any BISO issued personal or vehicle identification badges immediately upon termination of employment or completion of this contract.
14. NON-PAYMENT FOR ADDITIONAL WORK:
Any additional contractor performed services not specified in contract, either at its own volition or at the request of an individual other than the appointed Contracting Officer, except as may be explicitly authorized in the contract, shall be performed at the financial risk of the Contractor.
Only the appointed Contracting Officer is authorized to bind the Government to a change in specifications, contract terms, or conditions.
15. CONFLICT OF INTEREST:
The contractor shall not employ off-duty COR’s or other government employees if such employment would create a conflict of interest or be contrary to the policies contained in conflict-of-interest directives.
16. INSPECTION:
The Government will conduct inspection upon completion of required services. Final payment will be processed upon the Government confirming that all contract performance and administrative requirements have been satisfactorily completed and any deficiencies or non-compliant work have been satisfactorily corrected.
17. GOVERNMENT-FURNISHED PROPERTY, MATERIAL, EQUIPMENT, OR
INFORMATION:
NONE
18. SECURITY:
Replacement of Contractor Employee for Security Reasons: The Government retains the right to remove contractor employees from park property for security reasons, regardless of prior clearances.
19. TRAVEL:
Contractor is encouraged to make a site visit prior to bidding on the project.
20. FOOD STORAGE GUIDELINES:
All Contractor employees shall comply with BISO food storage guidelines. All food items must be stored in a hard-sided vehicle or in a food storage locker and must never be left unattended.
"Food" includes any item with a scent, regardless of packaging. This may include items that you do not consider food, such as canned goods, bottles, drinks, soaps, cosmetics, toiletries, trash, ice chests (even when empty), and unwashed items used for preparing or eating meals. Food shall be disposed of in a designated bear proof refuse container provided by the National Park Service.
21. PROJECT PERSONNEL:
Chief of Facilities Maintenance: Kenneth Gilreath
Phone: (423)569-7319
Email: kenneth_gilreath@nps.gov
Branch Chief, Project Management: Steve Wilmot
Phone: (423)569-7360
Email: stephen_wilmot@nps.gov
Branch Chief, Building and Utilities: Chris Henry
Phone: (423)569-7336
Email: christopher_henry@nps.gov