A06_-__Specifications___Winch_Skid_Unit.pdf
PDF 110 KB Posted
- Solicitation number
- 140FS225Q0211
About this file
This document is a Specifications file for a Winch Skid Unit procurement for the Loess Bluff National Wildlife Refuge. The specific equipment is a Dyno Tune PWS30 model with key features including a 30,000 Lb winch (wide drum), manual free spool, powdercoat finish, removable 7' dozer blade, 300 ft 5/8 wire rope capacity, ice/gravel spikes, hydraulic pressure gauge, and removable cutting edge and operator guard. The unit is intended to remove equipment similar to a tow truck's operation.
Delivery terms are FOB Destination to Loess Bluffs National Wildlife Refuge at 25542 U.S. Highway 159, Forest City, Missouri 64451. The contractor is responsible for packing, marking, preparing bills of lading, delivering the shipment in good condition, and bearing all delivery charges. The technical point of contact is William Kutosky, Refuge Manager, who can be reached at (660) 442-5754 Ext 13 or William_kutosky@fws.gov. Contractors must contact the POC at least three days prior to delivery to arrange a specific delivery time, with unloading being the sole responsibility of the delivery carrier.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140FS225Q0211.pdf | ||
| A16_-_Brand_Name_Justification.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
Project: Loess Bluff NWR
Winch Skid Unit
(Brand Name or
Equal)
1. Product Features
Name of Item: Winch Skid Unit
Manufacturer: Dyno Tune
Model Number: PWS30
Salient Characteristics:
• Warn 30,000 Lb winch (Wide Drum)
• Manual Free Spool
• Powdercoat Finish
• Removable Dozer Blade (7' Width)
• 300 Ft 5/8 Wire Rope capacity
• Ice/ Gravel Spikes
• Hydraulic Pressure Gauge
• Skid Steer Tie-Back anchors
• Removable/ Serviceable Cutting Edge
• Removable Operator Guard
Capabilities: This will be used to remove equipment similar to the operation of a tow truck.
2. Delivery
Prices quoted shall be FOB Destination
“F.o.b. destination” means --Free of expense to the Government delivered, on board the carrier’s conveyance, at a specified delivery point where the consignee’s facility (plant, warehouse, store, lot, or other location to which shipment can be made) is located; and
Supplies shall be delivered to the destination consignee’s wharf (if destination is a port city and supplies are for export), warehouse unloading platform, or receiving dock, at the expense of the contractor. The Government shall not be liable for any delivery, storage, demurrage, accessorial, or other charges involved before the actual delivery (or “constructive placement” as defined in carrier tariffs) of the supplies to the destination, unless such charges are caused by an act or order of the Government acting in its contractual capacity. If rail carrier is used, supplies shall be delivered to the specified unloading platform of the consignee. If motor carrier (including
“piggyback”) is used, supplies shall be delivered to truck tailgate at the unloading platform of the consignee, except when the supplies delivered meet the requirements of Item 568 of the National
Motor Freight Classification for “heavy or bulky freight.” When supplies meeting the requirements of the referenced Item 568 are delivered, unloading (including movement to the tailgate) shall be performed by the consignee, with assistance from the truck driver, if requested.
If the contractor uses rail carrier or freight forwarder for less than carload shipments, the contractor shall ensure that the carrier will furnish tailgate delivery when required, if transfer to truck is required to complete delivery to consignee.
Contractor responsibilities. The contractor shall --
(1)(i) Pack and mark the shipment to comply with contract specifications; or (ii) In the absence of specifications, prepare the shipment in conformance with carrier requirements;
(2) Prepare and distribute commercial bills of lading;
(3) Deliver the shipment in good order and condition to the point of delivery specified in the contract;
(4) Be responsible for any loss of and/or damage to the goods occurring before receipt of the shipment by the consignee at the delivery point specified in the contract; (5) Furnish a delivery schedule and designate the mode of delivering carrier; and
(6) Pay and bear all charges to the specified point of delivery.
No later than three days prior to delivery, please contact the Point of Contact listed below, to arrange a specific time for delivery. Unloading the product is the sole responsibility of the delivery carrier. No labor or equipment will be provided by the government to unload the supplies.
Delivery Location:
Loess Bluffs National Wildlife Refuge
25542 U.S. Highway 159
Forest City, Missouri 64451
3. Technical Point of Contact (POC):
William Kutosky
Refuge Manager
Loess Bluffs National Wildife Refuge
25542 U.S. Highway 159
Forest City, Missouri 64451
O: (660) 442-5754 Ext 13
C: (720)930-1375
William_kutosky@fws.gov mailto:William_kutosky@fws.gov
File details come from the government source that posted it. Updated .