This is a federal contract specification document for the purchase of prefabricated bathroom partitions for Curecanti National Recreation Area in Cimarron, Colorado. The project involves procuring bathroom partitions for four restrooms (two female, two male), with specific requirements including 3 standard toilet partitions, 4 ADA toilet partitions, and 1 urinal partition. Each restroom must meet 2010 ADA Standards for Accessible Design, with precise dimensional specifications such as stall widths (36-60 inches), depths (60 inches), and door swings (right/left-hand inswing).
The partitions must be floor-mounted, overhead-braced, constructed of solid phenolic core panels, and include all necessary hardware. Material requirements specify moisture-resistance, graffiti-resistance, and corrosion-resistance suitable for high-humidity environments. The contract (PMIS # 307470) requires delivery within 45 calendar days to 10346 Highway 347 in Montrose, CO. Contractors must submit product data, shop drawings, color samples, hardware specifications, and warranty documents within 10 calendar days of award. The project is a procurement-only contract with no installation services included.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P1225Q0079_Amd_0001.pdf | ||
| Sol_140P1225Q0079.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
Project Title: Purchase of Prefabricated Bathroom Partitions PMIS # 307470
Location: Curecanti National Recreation Area, Cimarron Prepared By: David Covington Date: 04/18/2025
PART 1 – GENERAL
ITEM 1 – DESCRIPTION OF WORK
1.1 Background:
This project involves the procurement and delivery of prefabricated toilet partitions and urinal partitions to support restroom upgrades at the Cimarron Campground in Curecanti NRA. The restroom configuration includes 2 Female Restrooms and 2 Male Restrooms. The new system must meet all applicable accessibility and durability standards to serve high-traffic public use.
1.2 Work Covered by the Contract Documents:
The Contractor shall furnish and deliver a complete set of restroom partitions including:
Female Restroom #1
• (2) Standard Toilet Partitions o Door swing: Right-hand inswing o Stall width: 36 inches o Stall depth: 60 inches o Door width: 24 inches
• (1) ADA Toilet Partition o Door swing: Right-hand inswing o Stall width: 60 inches o Stall depth: 60 inches o Door width: 36 inches
The overall partition layout must accommodate an alcove-style configuration with a total depth of 116 inches and meet all clearances required by the 2010 ADA Standards for Accessible Design, ANSI A117.1, and ICC/IBC Section 1109.2.
Female Restroom #2
• (1) Standard Toilet Partitions o Door swing: Right-hand inswing o Stall width: 36 inches o Stall depth: 60 inches o Door width: 24 inches
• (1) ADA Toilet Partition o Door swing: Right-hand inswing o Stall width: 60 inches o Stall depth: 60 inches o Door width: 36 inches
The overall partition layout must accommodate an alcove-style configuration with a total depth of 118 inches and meet all clearances required by the 2010 ADA Standards for Accessible Design, ANSI A117.1, and ICC/IBC Section 1109.2.
Male Restroom #1
• (1) Standard Toilet Partitions o Door swing: Left-hand inswing o Stall width: 36 inches o Stall depth: 60 inches o Door width: 24 inches
• (1) ADA Toilet Partition o Door swing: Left-hand inswing o Stall width: 60 inches o Stall depth: 60 inches o Door width: 36 inches
• (1) Urinal Partition o Width of 24 inches
The overall partition layout must accommodate an alcove-style configuration with a total depth of 116 inches and meet all clearances required by the 2010 ADA Standards for Accessible Design, ANSI A117.1, and ICC/IBC Section 1109.2.
Male Restroom #2
• (1) ADA Toilet Partition o Door swing: Left-hand inswing o Stall width: 60 inches o Stall depth: 60 inches o Door width: 36 inches
• (1) Urinal Partition o Width of 24 inches
The overall partition layout must accommodate an alcove-style configuration with a total depth of 118 inches and meet all clearances required by the 2010 ADA Standards for Accessible Design, ANSI A117.1, and ICC/IBC Section 1109.2.
Partitions shall be floor-mounted overhead-braced type, constructed of solid phenolic core panels, with all required hardware, headrails, wall and floor anchoring systems included. Materials must be moisture-resistant, graffiti-resistant, and corrosion-resistant (suitable for high-humidity environments) and meet fire safety ratings per NFPA 101 and ASTM E84 Class B or better.
Manufacturer submittals must include shop drawings, material data sheets, and finish/color samples. No installation is included in this contract.
Delivery location and access: 10346 Highway 347 Montrose CO, 81401
Period of Performance: All materials shall be delivered within 45 calendar days of contract award.
ITEM 2 – EXISTING UTILITIES
Not applicable. No site utility work is included in this procurement-only contract.
ITEM 3 – CONTRACTOR’S USE OF PREMISES
All materials must be delivered in a manner minimizing disruption to park operations. Contractor shall coordinate delivery schedule with the COR and ensure packaging allows for safe indoor storage.
ITEM 4 – COMMENCEMENT, PROSECUTION, AND COMPLETION
Contractor shall commence order placement immediately upon award. Delivery shall be completed within 45 calendar days.
ITEM 5 – EXAMINATION OF THE SITE
Contractor is responsible for confirming on-site storage conditions and access requirements with the COR prior to delivery.
ITEM 6 – ABBREVIATIONS
Relevant standards include:
• ADA 2010 (Accessible Design)
• ICC/IBC 2021 (Building Codes)
• NFPA 101 (Fire Life Safety Code)
• ASTM E84 (Surface Burning Characteristics)
• ANSI A117.1 (Accessibility Guidelines)
ITEM 7 – ACCIDENT PREVENTION
Contractor must adhere to all safety procedures during transport and delivery. PPE must comply with OSHA 1926 Subpart E.
ITEM 8 – PRECONSTRUCTION CONFERENCE
Not required unless determined necessary by the CO. Contractor must provide submittals before delivery.
ITEM 9 – SUBMITTALS
Submit the following within 10 calendar days of award:
• Product data and cut sheets
• Shop drawings with layout confirmation
• Color and material finish samples
• Hardware specifications
• Warranty documents (minimum 1-year manufacturer warranty)
ITEM 10 – TEMPORARY SERVICES
Not applicable. This is a material-only procurement with no on-site construction activity.
ITEM 11 – PROJECT CLOSEOUT
Submit final delivery documentation, bill of lading, and manufacturer warranty information.
Materials must be free of damage and defects; COR will perform post-delivery inspection before final acceptance.
PART 3 – EXECUTION
Not Applicable – Supply Only Execution work such as installation or field modifications is NOT part of this contract.
See Drawings Below: