A06_Specifications_ATT_2_Boulders.pdf
PDF 112 KB Posted
- Attached to
- Supply and Deliver Boulders Whiskeytown NP
- Solicitation number
- 140P8423Q0104
About this file
This solicitation document from the National Park Service requires vendors to supply and deliver specified boulders to Whiskeytown National Recreation Area in California. Vendors must provide approximately 700 tons of 2-ton boulders and 300 tons of 1-ton boulders that meet California DOT and NPS standards. Boulders must be of Mule Mountain stock with at least two flat parallel sides. Delivery locations include Whiskeytown Dam and Carr Boneyard between award date and December 30, 2023, with delivery dates and times coordinated post-award. Vendors must comply with legal load restrictions and deliver between 0700-1730 hours Monday through Friday. Equipment must be pressure washed or steam cleaned and haul trucks covered to prevent invasive species introduction.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior
NATIONAL PARK SERVICE
WHISKEYTOWN NATIONAL RECREATION AREA
P.O. BOX 188
WHISKEYTOWN, CA 96095-0188
Supply and Delivery Boulders
Whiskeytown National Recreation Area 140P8423Q0104
Supply Specifications
Introduction Whiskeytown National Recreation Area (WHIS), a division of the National Park Service, requires a vendor to supply and deliver specified boulders. The materials provided will be utilized in maintaining and repairing various unpaved roads throughout WHIS.
Location Whiskeytown National Recreation Area is approximately seven miles west of Redding in Shasta County, California. All identified delivery locations can be accessed from maintained dirt roads within WHIS or paved roads.
Objective The vendor shall supply, deliver, and unload the specified boulders at the designated locations.
The materials provided must meet the minimums standards set by the California Department of Transportation and the National Park Service. The material must be free of invasive non-native plants or plant seeds. Delivery and offloading schedules must be coordinated with the Contracting Officer (CO) or Contracting Officer's Representative (COR). Boulders must be of a Mule Mountain stock, cubed in nature with at least 2 flat, parallel sides.
Specifications The vendor is required to supply the following Boulders:
Quantity (tons) Size
700 2 ton
300 1 ton
These materials must meet all requirements set by the California Department of Transportation and National Park Service. The rocks must be of Mule Mountain stock and have at least 2 flat, parallel sides for stacking.
Place and Delivery Dates
All materials supplied by the vendor shall be delivered to the designated drop locations within WHIS. The anticipated Delivery Dates shall commence and be completed between the Time of Award and December 30, 2023. Delivery dates and times will be provided to the vendor post-award.
Delivery Locations The vendor shall deliver the specified quantity of material to the following specified locations within the coordinated delivery date and time:
Drop Location Coordinates (X, Y) 2-ton Boulders (approx. tons) 1-ton Boulders (approx. tons)
Whiskeytown Dam -122.535, 40.599 350 150
Carr Boneyard -122.627, 40.650 350 150
Hauling Restrictions The vendor shall comply with all legal load restrictions in the hauling of materials.
Requirements and Limitations
• Deliveries shall occur during normal business hours: Monday – Friday, between the hours of 0700-1730.
• All construction equipment will be pressure washed/steam cleaned before entering the parks to ensure that all equipment and machinery are weed-free.
• Haul trucks bringing fill materials from outside the parks will be covered to prevent seed transport and dust deposition along the road corridor.
Prevention of Invasive Species Introduction All aggregate sources must be approved as "noxious-weed-free" before acceptance. This is to prevent the introduction of invasive non-native species into the park. The vendor must implement mitigation measures where necessary, such as stripping the top 12 inches of source material, requiring fresh material stored for less than one week, or sterilizing the material.
Government-Furnished Property No Government-furnished property will be provided to the contractor for this project.
Contacts David Oechsli – COR DJ Swenson – Field Inspector Roads, Trails and Lake Supervisor Engineering Equipment Operator david_oechsli@nps.gov dj_swenson@nps.gov
(530) 945-6123 (530) 339-0348 mailto:david_oechsli@nps.gov mailto:dj_swenson@nps.gov
File details come from the government source that posted it. Updated .