A06_Section_J_Number_1-_Titsworth_Ditch_Gabion_Basket_Weir_Construction_Plans.pdf
PDF 15 MB Posted
- Attached to
- TITSWORTH DITCH GABION BASKET WEIR
- Solicitation number
- 140L4024R0008
About this file
This document appears to be a set of construction plans for a Titsworth Ditch Gabion Basket Weir project. The related federal contract opportunity is a solicitation (Solicitation Number: 140L4024R0008) issued by the Department of the Interior Bureau of Land Management New Mexico Region for the Titsworth Ditch Gabion Basket Weir construction. The solicitation seeks proposals for the construction of a gabion basket weir structure along the Titsworth Ditch. Key details include the project name, agency, solicitation number, and a high-level description of the required construction services. However, this document does not provide specifics on the required products or services, response dates, award dates, pricing terms, set asides, or incumbents. It appears to be the supporting construction plans for the referenced federal contract opportunity.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
CONSTRUCTION PLANS
PECOS DISTRICT OFFICE
LINCOLN COUNTY
TITSWORTH DITCH IRRIGATION DIVERSION.
LINCOLN COUNTY, NEW MEXICO. SITE
LOCATED NORTHWEST OF LA CUESTA LANE.
33°30'26.4"N 105°24'09.9"W ct "':( I
TITSWORTH DITCH
GABION BASKET WEIR
COLORADO
I
DULC~ -er
~ JSHIPROCK :~:
\~·-- -/~~:- __ ·<}~! _1· AZTEC . ~_6(_
FARMINGTON' i BLOOMFl'ELD e4·: CHAMA U!J,i
TIERRA(.
SANJUAN
AMARILLA,
I
I RIOARRIBA
' 25 ' SIERRA
TRUTH OR
'CONSEQUENCES
!;'TULAROSA
; ALAMOGORDO
' I
I ii,' OTERO
I
IL _
TEXAS
RATON I
_ ABBOT
I
I -l n, I ):,.
I CJ)
I
1 HIDALGO :
- INDICATESD/STRJCTHEADQUARTERS
• - INDICATES STATE HEADQUARTERS
MEXICO
INDEX OF SHEETS
SHEET NO. DESCRIPTION
1 COVERSHEET
2 LOCATION
3 PLAN VIEW
4 PROFILE VIEW
5 CROSS SECTION VIEW
6 SITE PHOTOGRPAHS
7 SITE PHOTOGRAPHS
E
_L
_L
: cc _L i,,- I f l L
N
Project Location
SCALE (FEET)
500 1000 E
_L
PLAN VIEW OF GABION WALL
i- 7 - 11 - 11 ni rT 1T 1 - I - I - I I TTI
I I-I I I l~tWI 1Effi~l<l-i I I -11 -I -I -I -11 111 11-111-111-111-11-11-1 -1 - - -
I I I I I I I I
11 I 7 11 - 11 T 11'1 ITTII Tlll11TII
_I I I _I I I I II I I II I I II I 1 ~i 111 i' I I I I I I I I I I I I I
_ _fLOW ~
RIVER
20'
I 111 111 111 111 111 111 111 111 , 11 I I 1=ITT=m m- =oo~ m m ~ ~ -111= l1ill7ill7ill=ill=ill=®= J=
==1 ==1 ==1 I ==1I1==111 kll==I I 1==1 I 1==1 I 1==1 I 1==1 I 1==1 I 1==1I1==111- I 1=
EXISTING DIVERSION
STRUCTURE 20'
EXACT LOCATION TO BE COORDINATED
WITH BLM CONSTRUCTION
REPRESENTATIVE AT TIME OF
INSTALLATION.
I 40'
NTS
DRAWING NOT TO SCALE. SHAPES AND SIZES NOT
INTENDED TO BE ACCURATE, I.E. RIVER BANKS NOT A
STRAIGHT LINE, SHAPES NOT EXACTLY AS SHOWN. SEE
SITE PHOTOGRAPHS FOR MORE INFORMATION.
GABIONWALL
~-Ai
20'
' 1'
GABION BASKETS INSTALLED AS
i DOWNSTREAM OUTFALL
PROTECTION APRON. SEE PROFILE
AND CROSS SECTION.
- -3'
GENERAL NOTES
1. GABION BASKETS SHALL BE GALVANIZED
AND PVC COATED. SEE SPECIFICATIONS.
E
I, : cc _L f---
LL
I EXISTING
DIVERSION
STRUCTURE
PROFILE VIEW OF GABION WALL
TOP OF GABION WALL SHALL BE AT ELEVATION
50.1' (0.1' ABOVE TOP OF DIVERSION PIPE) IN
RIVER CHANNEL. TOP OF WALL SHALL BE AT
ELEVATION 53' (1' ABOVE TOP OF BANK) OUTSIDE
RIVER CHANNEL.
TOP OF RIVER BANK ELEVATION 52.0'*
ITOP OF EXISTING DIVERSION PIPE EL. 50.0'* I RIVER SURFACE ELEVATION
49.72'*
RIVER
_FLOW~
MARCH 2024. ELEVATIONS
TYPICALLY HIGHER IN
SPRING AND LOWER IN
FALL.
RIVERBED
ELEVATION
48.11'* (CENTER
OF CHANNEL)
I I -11 I -I I I I I I I I I' II I I I I 11 I I I I I I I I I 11= I I I I I 11 ( I I I 111 11
I I I I I = I I I =
1--·
II ==I == -1- 1-111-11-11-1-1 - I- - 1-11-11-11-111-I - -Ill- --
==II ==I I 1-11-11-11-11-111-I - -11-1- 1-111-1-111-11-I - - - ,~
11 ==1 - ...,l____,,1------,-,-1 1 .. - I - 1-111-11 -1 1- I -1 - 1- - 1- 11-11 -11 -111-1 - -111- -
INSTALL GABION WALL 20' DOWNSTREAM OF EXISTING
DIVERSION PIPE. EXACT LOCATION TO BE
COORDINATED WITH BLM CONSTRUCTION
REPRESENTATIVE AT TIME OF INSTALLATION.
PLACE
GEOTEXTILE
FABRIC
BETWEEN
GABION AND
EARTH
TOP OF GABION
WALL ELEVATION
53' (OUTSIDE
RIVER CHANNEL).
TOP OF GABION
WALL ELEVATION
50.1' ( INSIDE
RIVER CHANNEL).
NTS
_fl.OW~
BOTTOM OF
GABION WALL
ELEVATION
46.11'* (2 FEET
BELOW RIVER
BED)
GABION BASKET
DOWNSTREAM
OUTFALL
PROTECTION APRON.
BOTTOM OF GABION
TO MATCH GABION
WALL 2' BELOW RIVER
BED. TOP OF GABION
SHALL BE AT 0.5'
ABOVE RIVER BED.
E
I, f
LL
_L
_L f
LL
i,,- 4
L
BACKFILL ALL DISTURBED
AREAS AROUND GABIONS
WITH SPOIL BACKFILL. TOP
OF GABION WALL SHALL BE
1' ABOVE TOP OF BANK
GRADE.
CROSS SECTION VIEW OF GABION WALL
TOP OF GABION WALL
ELEVATION 50.1' INSIDE
RIVER CHANNEL
TOP OF GABION WALL
ELEVATION 53' OUTSIDE
RIVER CHANNEL
EXTEND GEOTEXTILE
FABRIC ABOVE SURFACE
GRADE.
NTS
GEOTEXTILE FABRIC
GABION BASKET INSTALLED
AS DOWNSTREAM OUTFALL
PROTECTION APRON. SEE
PROFILE AND PLAN VIEWS.
E
I, f u_
LC'.. ~
f-
='=t:;:
~c;
~I
: cc _L f
LL
i,,- 4
SITE PHOTOGRAPHS - ACCESS E
I, f u_
_L
_L f
LL
SITE PHOTOGRAPHS - PROJECT SITE
E
I, f u_
| 1 COVER |
| 2 |
| 3 |
| 4 |
| 5 |
| 6 |
| 7 |
File details come from the government source that posted it. Updated .