A06_Pages_from_SAHO_Construction_Drawings.pdf
PDF 3 MB Posted
- Attached to
- GATE-TROUBLESHOOT & REPAIR HVAC-BLDG 65
- Solicitation number
- 140P4525Q0047
About this file
These mechanical drawings detail the HVAC renovation for Building 65 at Gateway National Recreation Area's Sandy Hook Unit. The comprehensive set includes mechanical plans, demolition plans, equipment schedules, and system details for a complete mechanical systems upgrade. Key elements include installing multiple Mitsubishi air conditioning units (AC-1 through AC-18), a heat pump (HP-2), an energy recovery ventilator (ERV-3), electric baseboard heaters (EBB-3, EBB-4), and an electric unit heater (EUH-1).
The drawings specify a variable refrigerant flow (VRF) system with precise installation requirements, including routing refrigerant lines, mounting units at specific heights, and implementing 7-day programmable thermostats with occupancy override. The control sequence details setpoints for occupied and unoccupied hours (cooling at 75°F/80°F, heating at 70°F/65°F), and includes provisions for simultaneous heating and cooling across multiple zones. The project involves careful coordination of ductwork, electrical connections, and integration with existing building structures, with a focus on energy efficiency and precise environmental control for different spaces within Building 65.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P4525Q0047_Amd_0001.pdf | ||
| B03_NJ20250037.pdf | ||
| B08_References_Worksheet_(1)_(1).pdf | ||
| A04_2025-03_SOW_Heat_pump_TS_and_Repair.docx | DOCX document | |
| A06_Photos_of_HVAC_systems_at_B65.docx | DOCX document | |
| B08_Price_Schedule_GATE_Troubleshoot_B65.docx | DOCX document | |
| Sol_140P4525Q0047.pdf | ||
| A04_Spec_Sheets.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F/S
S
F
A
NOTE
NECESSARILY USED.
ALL SYMBOLS AND ABBREVIATIONS SHOWN ARE NOT
VENTILATION AND AIR CONDITIONING SYMBOLSABBREVIATIONS
12x20
SECOND FIGURE, SIDE NOT SHOWN)
ALL DUCTS DIMENSIONS SHALL BE
SUPPLY DUCT UP
RETURN DUCT UP
SUPPLY DUCT DOWN
RETURN DUCT DOWN
AIR FLOW
AIR FLOW
R
D
TRANSITIONS
MANUAL VOLUME DAMPER
FLEXIBLE CONNECTION
SUPPLY OR RETURN
RECTANGULAR DUCT ELBOW WITH
TURNING VANES
SHOWN IN INCHES.
DUCT (FIRST FIGURE, SIDE SHOWN AND
RECTANGULAR TO ROUND TRANSITION
STANDARD RECTANGULAR BRANCH FOR
INCLINED DROP (D), ARROW IN DIRECTION OF
INCLINED RISE (R), ARROW IN DIRECTION OF
T
H
D
THERMOSTAT
HUMIDISTAT
DUCT MOUNTED SMOKE DETECTOR
ACCESS PANEL
FIRE DAMPER
SMOKE DAMPER
COMBINATION FIRE/SMOKE DAMPER
EXHAUST DUCT DOWN
EXHAUST DUCT UP
M MOTORIZED DAMPER
RL REFRIGERANT LIQUID LINE
RS REFRIGERANT SUCTION LINE
TEMPERATURE AND PRESSURE
TYPICAL
URINAL
VENT, VOLTS
T&P
TYP.
U
V
SS SINK
SL SEA LEVEL
MSB MOP SERVICE BASIN
FT FEET
FPM FEET PER MINUTE
FAHRENHEITF
EWT ENTERING WATER TEMP
AVG AVERAGE
WET BULBWB
NORMALLY OPENNO
NORMALLY CLOSEDNC
DRY BULBDB
LEAVING AIR TEMPERATURELAT
ENTERING AIR TEMPERATUREEAT
W WATT, WASTE
REVOLUTIONS PER MINUTERPM
KILOWATTKW
GALLONS PER MINUTEGPM
CFM
BTUH
VOLUME DAMPERVD
(E)
EA
EXISTING
EXHAUST AIR
CUBIC FEET PER MINUTE
FULL LOAD AMPSFLA
NOT IN CONTRACTNIC
DRAIND
VENT THROUGH ROOF
PRV PRESSURE REDUCING VALVE
INSIDE DIAMETERID
AAV AUTOMATIC AIR VENT
AIR SEPARATORAS
SINKS
DRINKING FOUNTAINDF
WATER HAMMER ARRESTORWHA
WCO
WC
W/O W/
VTR
SA
WALL CLEANOUT
WATER CLOSET, WATER COLUMN
WITHOUT
WITH
SUPPLY AIR
OAT
OA
M
L
IN
HW
HB
GCO
FD
FCO
OUTSIDE AIR TEMPERATURE
OUTSIDE AIR
MOTORIZED DAMPER
LAVATORY
INCHES
DOMESTIC HOT WATER
HOSE BIBB
GRADE CLEANOUT
FLOOR DRAIN, FIRE DAMPER
FLOOR CLEANOUT
DN
CW
CO
C.I.
BDD
AUX.
AP
AFF
AD
DOWN
COLD WATER
CLEANOUT
CAST IRON
BACKDRAFT DAMPER
AUXILIARY
ACCESS PANEL
ABOVE FINISHED FLOOR
ACCESS DOOR
SHEET WHERE SHOWN
DETAIL IDENTIFIER
SHEET WHERE SHOWN
SECTION LETTER
NOT APPLICABLENA
DOMESTIC HOT WATER RECIRCHWC
F/S FIRE SMOKE DAMPER
SP STATIC PRESSURE
HEAT EXCHANGERHX
RPBP REDUCED PRESSURE BACKFLOW PREVENTER
FS FLOW SWITCH
DOUBLE CHECK BACKFLOW PREVENTERDCBP
ELECTRICAL CONTRACTORE.C.
G.C. GENERAL CONTRACTOR
M.C. MECHANICAL CONTRACTOR
UNINTERRUPTIBLE POWER SUPPLYUPS
BRITISH THERMAL UNIT PER HOUR
M1
EXTERNAL STATIC PRESSUREESP
REFRIGERANT LIQUIDRL
REFRIGERANT SUCTIONRS
EFFICIENCYEFF
ENERGY EFFICIENCY RATIOEER
SEASONAL ENERGY EFFICIENCY RATIOSEER
HEATING SEASONAL PERFORMANCE FACTORHSPF
DESIGNED:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
TITLE OF SHEET
OF
200607 A
127962
CWC
SUB SHEET NO.
REVIEWED BY:
DMD
GATEWAY NATIONAL RECREATION AREA6
/2
/2
:1
:3
A
M C
U s e rs
\c c ro w \D o c u m e n ts
\2 N
P S
S A
H O
M P c c ro w S
C H
U C
.r v t
RELOCATE MAINTENANCE FACILITIES TO MORE
SUSTAINABLE LOCATIONS - SANDY HOOK UNIT
MECHANICAL COVER
SHEET
06.30.2017 225
M0.00
MECHANICAL NOTES
I. GENERAL
A. ALL WORK SHALL BE IN ACCORDANCE WITH SMACNA STANDARDS AND SPECIFICATIONS, AND LOCAL AUTHORITY HAVING JURISDICTION.
B. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND NOT INTENDED TO SHOW ALL TRANSITIONS, OFFSETS, ETC. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS AND PROVIDE ALL NECESSARY FITTINGS TO COMPLETE THE INTENT OF THE DRAWINGS. ANY DISCREPANCIES BETWEEN DRAWINGS AND FIELD CONDITIONS SHALL BE REPORTED TO THE CONTRACTING OFFICER FOR RESOLUTION. CONTRACTOR MAY LOCATE MECHANICAL EQUIPMENT DIFFERENTLY THAN SHOWN ON DRAWINGS
DUE TO CONFLICTS, AS LONG AS FUNCTION AND/OR APPEARANCE ARE NOT AFFECTED.
C. COORDINATE SPACE REQUIREMENTS, SUPPORTS, AND INSTALLATION OF MECHANICAL WORK, WHICH ARE INDICATED DIAGRAMMATICALLY ON THE DRAWINGS. FOLLOW ROUTING SHOWN FOR PIPES AND DUCTS AS CLOSELY AS PRACTICABLE; PLACE RUNS PARALLEL WITH LINES OF BUILDING. UTILIZE SPACES EFFICIENTLY TO MAXIMIZE
ACCESSIBILITY FOR OTHER INSTALLATIONS, FOR MAINTENANCE, AND FOR REPAIRS.
D. COMPLY WITH MANUFACTURER’S INSTRUCTIONS INCLUDING EACH STEP IN SEQUENCE. SHOULD MANUFACTURERS’ INSTRUCTIONS CONFLICT WITH THE DRAWINGS
REQUEST CLARIFICATION FROM THE ENGINEER BEFORE PROCEEDING.
E. DUCT SIZES ARE INSIDE DIMENSION.
F. CONTRACTOR SHALL REVIEW THESE DOCUMENTS CAREFULLY. CONTRACTOR SHALL CONTACT CONTRACTING OFFICER, FOR RESOLUTION OF ANY DISCREPANCIES, OMISSIONS, OR CLARIFICATIONS, BEFORE BID DATE. IN THE EVENT THAT AN INTERPRETATION OF BID DOCUMENTS IS NECESSARY AFTER THE BID DATE, THE DECISION
OF CONTRACTING OFFICER SHALL BE FINAL AND BINDING.
G. PRODUCT DELIVERY, STORAGE, AND HANDLING: PROVIDE EQUIPMENT AND PERSONNEL TO HANDLE PRODUCTS BY METHODS TO PREVENT DAMAGE. PROMPTLY INSPECT SHIPMENTS TO ENSURE THAT PRODUCTS ARE UNDAMAGED. STORE AND PROTECT PRODUCTS IN ACCORDANCE WITH MANUFACTURERS’ INSTRUCTIONS.
H. THE CONTRACTOR IS RESPONSIBLE FOR THE COSTS OF ALL CHANGE ORDERS, WHICH THE OWNER AND ENGINEER HAVE NOT APPROVED IN WRITING PRIOR TO THE
EXECUTION OF THE ASSOCIATED WORK.
I. CONTRACTOR SHALL COORDINATE WORK WITH OTHER TRADES AND NOTIFY CONTRACTING OFFICER IF ANY CONFLICTS OCCUR.
J. THERMOSTAT LOCATIONS AND HEIGHTS TO BE COORDINATED WITH BUILDING MANAGEMENT, VERIFIED BY THE ENGINEER. HEATING THERMOSTATS MUST REMAIN OPERATIONAL AT ALL TIMES. IF REQUIRED FOR BETTER PROTECTION, THERMOSTATS MAY BE TEMPORARILY MOUNTED IN THE CEILING PLENUM.
K. PROVIDE ALL THERMOSTATS ON EXTERIOR WALLS WITH INSULATED BASES.
L. PROVIDE VOLUME DAMPERS AT ALL DIFFUSER TAKEOFFS.
M. ALL TAKEOFFS, RUNOUTS, AND FLEX DUCTWORK TO DIFFUSERS SHALL BE THE SAME SIZE AS DIFFUSER INLET UNLESS OTHERWISE NOTED.
N. THERMOSTAT CONTROL LINES SHALL BE SUPPORTED AT INTERVALS NOT TO EXCEED 4’ 0".
O. PROVIDE EXTERNAL INSULATION ON ALL NEW CONCEALED RIGID ROUND DUCTWORK.
P. PROVIDE INTERNAL INSULATION ON ALL NEW EXPOSED RIGID ROUND DUCT WORK.
Q. PROVIDE ACCESS DOORS IN DUCTWORK AS REQUIRED FOR ACCESS TO FIRE DAMPERS, FIRE/SMOKE DAMPERS, OR ANY OTHER MECHANICAL EQUIPMENT REQUIRING
MAINTENANCE OF SERVICE.
3.1
3.3 3.4
3.5 3.6
3.7
3.9
3.A
3.B
3.C
3.D
3.2
3.8
3.1 3.3 3.4
3.5 3.6
3.7
3.9
3.A
3.B
3.C
3.D
3.2
3.8
DESIGNED:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
TITLE OF SHEET
OF
200607 A
127962
CWC
SUB SHEET NO.
REVIEWED BY:
DMD
GATEWAY NATIONAL RECREATION AREA6
/2
/2
:1
:3
A
M C
U s e rs
\c c ro w \D o c u m e n ts
\2 N
P S
S A
H O
M P c c ro w S
C H
U C
.r v t
RELOCATE MAINTENANCE FACILITIES TO MORE
SUSTAINABLE LOCATIONS - SANDY HOOK UNIT
BUILDING #65 MECHANICAL
DEMO PLANS
06.30.2017 229
M3.11
SCALE A
M3.11
BUILDING #65 FIRST FLOOR MECHANICAL DEMO PLAN1
SCALE A
4’ 0’ 4’
SCALE OF FEET
8’ 16’
KEY NOTES:
EXISTING BOILER AND ASSOCIATED PIPING AND CONTROLS WITHIN LEAN−TO SHALL BE REMOVED. RE: HAZMAT
REPORT.
EXISTING STEAM RADIANT HEATER TO BE DECOMMISSIONED. HEATER TO BE CLEANED AND PAINTED WITH VERTICAL PIPING STILL ATTACHED. VERTICAL PIPING TO BE CLEANED, PAINTED, AND CAPPED AT ENDS.
RELOCATE HEATER AS REQUIRED. RE: ARCHITECTURAL PLANS FOR NEW HEATER LOCATIONS.
DEMOLISH ALL HORIZONTAL RUNS OF STEAM PIPING SERVING EXISTING STEAM RADIATORS IN FIRST FLOOR
SPACE AND CRAWL SPACE. PROPERLY DISPOSE OF ALL MATERIALS OFF SITE.
DEMOLISH EXISTING EXHAUST DUCT AND PROPERLY DISPOSE OF ALL MATERIALS OFF SITE.
NO DEMO WORK ON THIS FLOOR.
SCALE A
M3.11
BUILDING #65 SECOND FLOOR MECHANICAL DEMO PLAN2
GENERAL NOTES:
REMOVE ALL EXISTING MECHANICAL EQUIPMENT SERVING BUILDING AND
DISPOSE OF PROPERLY OFF SITE (UNLESS OTHERWISE NOTED).
8"x8"8"x8"
3.1
3.3 3.4
3.5 3.6
3.7
3.9
3.A
3.B
3.C
3.D
3.2
3.8
8"x8"
UNISEX
OFFICE
SERVER
OFFICE
SHED
WORK ROOM
UNISEX
MECH/JANITOR
FILE STORAGE
OPEN
OFFICE/RECEPTION
CONFERENCE
ROOM
AC−1
AC−3
AC−4
AC−2
AC−17
AC−5
EBB−3
EBB−4
EUH−1
AC−6
AC−7
AC−18
AC−8
HP−2
BC−1
BC−2
8"x8"
8" Ø
140 CFM
C
8" x 8"
100 CFM
C
8" x 8"
100 CFM
C
8" x 8"
100 CFM
C
3.1 3.3 3.4
3.5 3.6
3.7
3.9
3.A
3.B
3.C
3.D
3.2
3.8
OFFICE
STORAGE
STORAGE
OFFICE
CLOSET
324A
CLOSET
321A
CLOSET
322A
CLOSET
323A
MECHANICAL
OFFICE
OFFICE
OPEN OFFICE
"x
"x
AC−9
AC−10
AC−15
AC−16
AC−11
AC−12
AC−13
AC−14
ERV−3
M7.30
18" x 6"
400 CFM
A
18" x 6"
400 CFM
B
(TYP. OF 4)
(TYP. OF 4)
DESIGNED:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
TITLE OF SHEET
OF
200607 A
127962
CWC
SUB SHEET NO.
REVIEWED BY:
DMD
GATEWAY NATIONAL RECREATION AREA6
/2
/2
:1
:4
A
M C
U s e rs
\c c ro w \D o c u m e n ts
\2 N
P S
S A
H O
M P c c ro w S
C H
U C
.r v t
RELOCATE MAINTENANCE FACILITIES TO MORE
SUSTAINABLE LOCATIONS - SANDY HOOK UNIT
BUILDING #65 MECHANICAL
PLANS
06.30.2017 230
M3.21
SCALE A
M3.21
BUILDING #65 FIRST FLOOR MECHANICAL PLAN1
SCALE A
4’ 0’ 4’
SCALE OF FEET
8’ 16’
KEY NOTES:
PROVIDE NEW AIR CONDITIONING UNIT, AC−1. MOUNT HIGH ON WALL.
PROVIDE NEW AIR CONDITIONING UNIT, AC−2. MOUNT HIGH ON WALL.
PROVIDE NEW AIR CONDITIONING UNIT, AC−3. MOUNT HIGH ON WALL.
PROVIDE NEW AIR CONDITIONING UNIT, AC−4. MOUNT HIGH ON WALL.
PROVIDE NEW ELECTRIC UNIT HEATER, EUH−1. PROVIDE WITH REMOTE HEATING ONLY THERMOSTAT.
PROVIDE NEW AIR CONDITIONING UNIT, AC−5. MOUNT HIGH ON WALL.
STACK REFRIGERANT LINES AND DUCT WORK IN THIS ROOM. COORDINATE ROUTING AROUND THE TOP
OF SERVER RACKS..
PROVIDE NEW ELECTRIC BASEBOARD HEATER, EBB−3.
PROVIDE NEW ELECTRIC BASEBOARD HEATER, EBB−4.
PROVIDE NEW AIR CONDITIONING UNIT, AC−6. MOUNT HIGH ON WALL.
PROVIDE NEW AIR CONDITIONING UNIT, AC−17. MOUNT HIGH ON WALL.
PROVIDE NEW AIR CONDITIONING UNIT, AC−7. MOUNT HIGH ON WALL.
SCALE A
M3.21
BUILDING #65 SECOND FLOOR MECHANICAL PLAN2
GENERAL NOTES:
RE: VRF FLOW DIAGRAM ON SHEET M7.40 FOR REFRIGERANT PIPING SIZES.
CONTRACTOR TO INSTALL HARD 90 DEG ELBOWS ON ALL REFRIGERANT PIPING AT FLOOR PENETRATIONS.
ROUTE ALL REFRIGERANT LINES AND DUCT WORK ON FIRST FLOOR RUNNING NORTH TO SOUTH TIGHT TO STRUCTURE. ROUTE ALL REFRIGERANT LINES AND DUCT WORK ON FIRST FLOOR RUNNING EAST TO WEST IN BETWEEN WOOD STRUCTURE.
PROVIDE SCREEN ON ALL OA ENDS AT UNITS.
MOUNT ALL WALL MOUNTED AC UNITS 2" BELOW CEILING.
KEY NOTES:
PROVIDE NEW AIR CONDITIONING UNIT, AC−8. MOUNT HIGH ON WALL. PROVIDE UNIT WITH DIFFERENT OCCUPIED COOLING SETPOINT (72 DEG. F), TO PROVIDE TWO STAGES OF COOLING IN SERVER ROOM.
PROVIDE NEW OUTDOOR HEAT PUMP, HP−2. ROUTE RL AND RS LINES TO BC CONTROLLER IN
MECHANICAL ROOM. ROUTE LINES DOWN UNDER PLATFORM AND INTO BUILDING THROUGH CRAWL
SPACE. COME UP THROUGH FLOOR TO BRANCH CONTROLLER IN MECHANICAL ROOM. RE: DETAIL 7 ON
SHEET M7.20.
PROVIDE NEW BRANCH CIRCUIT CONTROLLER, BC−1, IN MECHANICAL ROOM.
PROVIDE NEW AIR CONDITIONING UNIT, AC−9. RE: DETAIL 5 ON SHEET M7.20 FOR MOUNTING. PROVIDE
WITH REFRIGERANT LIQUID AND SUCTION LINES, AND 4" OA DUCT FROM BELOW.
PROVIDE NEW AIR CONDITIONING UNIT, AC−10. RE: DETAIL 5 ON SHEET M7.20 FOR MOUNTING. PROVIDE
WITH REFRIGERANT LIQUID AND SUCTION LINES, AND 4" OA DUCT FROM BELOW.
PROVIDE NEW AIR CONDITIONING UNIT, AC−15. RE: DETAIL 5 ON SHEET M7.20 FOR MOUNTING. PROVIDE
WITH REFRIGERANT LIQUID AND SUCTION LINES, AND 4" OA DUCT FROM BELOW.
PROVIDE NEW AIR CONDITIONING UNIT, AC−16. RE: DETAIL 5 ON SHEET M7.20 FOR MOUNTING. PROVIDE
WITH REFRIGERANT LIQUID AND SUCTION LINES, AND 4" OA DUCT FROM BELOW.
PROVIDE NEW AIR CONDITIONING UNIT, AC−11. MOUNT ON FLOOR. PROVIDE WITH REFRIGERANT LIQUID
AND SUCTION LINES, AND 3" OA DUCT FROM BELOW.
PROVIDE NEW AIR CONDITIONING UNIT, AC−12. MOUNT ON FLOOR. PROVIDE WITH REFRIGERANT LIQUID
AND SUCTION LINES, AND 3" OA DUCT FROM BELOW.
PROVIDE NEW AIR CONDITIONING UNIT, AC−13. MOUNT ON FLOOR. PROVIDE WITH REFRIGERANT LIQUID
AND SUCTION LINES, AND 3" OA DUCT FROM BELOW.
PROVIDE NEW AIR CONDITIONING UNIT, AC−14. MOUNT ON FLOOR. PROVIDE WITH REFRIGERANT LIQUID
AND SUCTION LINES, AND 3" OA DUCT FROM BELOW.
PROVIDE NEW SUB BRANCH CONTROLLER, BC−2, IN MECHANICAL ROOM.
KEY NOTES:
PROVIDE NEW ENERGY RECOVERY VENTILATOR, ERV−3. RE: DETAIL 2 ON SHEET M7.30 FOR ELEVATION.
ROUTE DUCT IN BETWEEN STRUCTURE TIGHT TO BOTTOM OF ROOF DECK UP TO EXISTING VENT. RE: DETAIL 4 ON SHEET M7.20.
PROVIDE NEW AIR CONDITIONING UNIT, AC−18. MOUNT HIGH ON WALL.
3" OA UP TO AC UNIT ON SECOND FLOOR.
4" OA UP TO AC UNIT ON SECOND FLOOR.
REFRIGERANT LIQUID AND SUCTION LINES UP TO AC UNIT ON SECOND FLOOR.
3.1 3.3 3.4 3.5
3.6 3.7
3.9
3.A
3.B
3.C
3.D
3.2
3.8
DESIGNED:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
TITLE OF SHEET
OF
200607 A
127962
CWC
SUB SHEET NO.
REVIEWED BY:
DMD
GATEWAY NATIONAL RECREATION AREA6
/2
/2
:1
:5
A
M C
U s e rs
\c c ro w \D o c u m e n ts
\2 N
P S
S A
H O
M P c c ro w S
C H
U C
.r v t
RELOCATE MAINTENANCE FACILITIES TO MORE
SUSTAINABLE LOCATIONS - SANDY HOOK UNIT
BUILDING #65 ROOF
MECHANICAL PLAN
06.30.2017 231
M3.22
SCALE A
M3.22
BUILDING #65 ROOF MECHANICAL PLAN1
SCALE A
4’ 0’ 4’
SCALE OF FEET
8’ 16’
KEY NOTES:
EXISTING ATTIC VENT TO REMAIN AND BE USED FOR OA
AND EA FOR ERV. RE: DETAIL 4 ON SHEET M7.20 FOR
DUCTING DETAIL.
BUILDING 65 INDOOR AIR CONDITIONING UNIT SCHEDULE
TAG
AC-1
AC-2
AC-3
AC-4
AC-5
AC-6
AC-7
AC-8
AC-9
AC-10
AC-11
AC-12
AC-13
AC-14
AC-15
AC-16
AC-17
AC-18
REMARKS:
1.
2.
NOTES:
1.
2.
3.
SERVING
OFFICE 310
OFFICE307
CONFERENCE 309
CONFERENCE 309
OPEN OFFICE 301
FILE STORAGE 303
WORK ROOM 302
STORAGE 308
OPEN OFFICE 320
OPEN OFFICE 320
OFFICE 323
OFFICE 324
OFFICE 322
OFFICE 321
OPEN OFFICE 320
OPEN OFFICE 320
OPEN OFFICE 301
STORAGE 308
7-DAY PROGRAMMABLE THERMOSTAT.
DIRECTIONAL DISCHARGE AIR GRILLE.
NOMINAL COOLING CAPACITIES ARE BASED ON INDOOR COIL EAT OF 80/67°F (DB/WB), OUTDOOR OF 95°F (DB).
NOMINAL HEATING CAPACITIES ARE BASED ON INDOOR COIL EAT OF 70°F (DB), OUTDOOR OF 43°F (WB).
SEE OUTDOOR UNIT SCHEDULE FOR OUTDOOR AMBIENT CONDITIONS, CONNECTED CAPACITY, AND OTHER FACTORS ASSOCIATED WITH CORRECTED CAPACITIES.
MANUFACTURER
MITSUBISHI
MITSUBISHI
MITSUBISHI
MITSUBISHI
MITSUBISHI
MITSUBISHI
MITSUBISHI
MITSUBISHI
MITSUBISHI
MITSUBISHI
MITSUBISHI
MITSUBISHI
MITSUBISHI
MITSUBISHI
MITSUBISHI
MITSUBISHI
MITSUBISHI
MITSUBISHI
MODEL
PKFY-P08NHMU-E2
PKFY-P24NKMU-E2.TH
PKFY-P08NHMU-E2
PKFY-P08NHMU-E2
PKFY-P12NHMU-E2
PKFY-P12NHMU-E2
PKFY-P15NHMU-E2
PKFY-P24NKMU-E2.TH
PVFY-P12NAMU-E
PVFY-P12NAMU-E
PFFY-P06NEMU-E
PFFY-P06NEMU-E
PFFY-P08NEMU-E
PFFY-P08NEMU-E
PVFY-P12NAMU-E
PVFY-P12NAMU-E
PKFY-P12NHMU-E2
PKFY-P24NKMU-E2.TH
TYPE
WALL MOUNTED
WALL MOUNTED
WALL MOUNTED
WALL MOUNTED
WALL MOUNTED
WALL MOUNTED
WALL MOUNTED
WALL MOUNTED
VERTICAL TYPE
VERTICAL TYPE
EXPOSED FLOOR STANDING
EXPOSED FLOOR STANDING
EXPOSED FLOOR STANDING
EXPOSED FLOOR STANDING
VERTICAL TYPE
VERTICAL TYPE
WALL MOUNTED
WALL MOUNTED
COOL EAT/DB
COOL EAT/WB
TOTAL BTUH
6,605.7
19,817.2
6,605.7
6,605.7
9,908.6
9,908.6
12,385.7
19,817.2
9,908.6
9,908.6
4,954.3
4,954.3
6,605.7
6,605.7
9,908.6
9,908.6
9,908.6
19,817.2
HEAT EAT/DB
TOTAL BTUH
5,619.5
16,858.4
5,619.5
5,619.5
8,429.2
8,429.2
10,614.6
16,858.4
8,429.2
8,429.2
4,183.4
4,183.4
5,619.5
5,619.5
8,429.2
8,429.2
8,429.2
16,858.4
VOLTAGE
PHASE
MCA
0.38
0.63
0.38
0.38
0.38
0.38
0.38
0.63
0.86
0.86
0.32
0.32
0.32
0.32
0.86
0.86
0.38
0.63
MOCP
REMARKS:
1,2
1,2
1,2
1,2
1,2
1,2
1,2
1,2
1,2
1,2
1,2
1,2
1,2
1,2
1,2
1,2
1,2
1,2
BUILDING 65 HEAT PUMP CONDENSING UNIT
TAG
HP-2
REMARKS:
1.
2.
3.
4.
5.
6.
MFG
MITSUBISHI ELECTRIC
PROVIDE WITH HAIL GUARDS.
HP IS (2) UNITS TWINNED TOGETHER. EACH UNIT WILL REQUIRE A SEPARATE ELECTRICAL CONNECTION WITH THE GIVEN ELECTRICAL DATA.
PROVIDE WITH TWINNING KIT.
PROVIDE WITH LOW AMBIENT KIT.
PROVIDE WITH COATING FOR CORROSION PROTECTION FROM SEA COAST CLIMATE.
PROVIDE WITH HEAT RECOVERY FOR SIMULTANEOUS HEATING AND COOLING.
MODEL
PURY-P192TSLMU-A-BS
EER
12.1
COOLING
BTUH
NOM.
192000
HEATING
BTUH
NOM.
215,000
OPERATING TEMP RANGE
COOLING
(DEG F)
23-126
HEATING
(DEG F)
-13-60
ELECTRICAL
MCA
TOTAL
MOP
VOLT
PH
REMARKS
1,2,3,4,5,6
BUILDING 65 ENERGY RECOVERY VENTILATION UNIT SCHEDULE
TAG
ERV-3
REMARKS:
1.
2.
MFG
RENEWAIRE
PROVIDE WITH FACTORY MOUNTED FILTER ALARMS.
PROVIDE WITH BACKDRAFT DAMPERS.
MODEL#
HE1XINV
SA (CFM)
EA (CFM)
SUPPLY FAN / EXHAUST FAN
ESP (IN W.G)
0.4
OA DB
3.
4.
OA WB
MECHANICAL CONTRACTOR TO PROVIDE WITH 7-DAY PRGRAMMABLE TIMECLOCK.
INTERLOCK WITH FIRE ALARM CONTROL PANEL FOR SHUTDOWN IN CASE OF FIRE. RE: ELEC PLANS.
SUMMER
RA DB
RA WB
62.6
SA DB
79.3
SA WB
62.8
OA DB
OA WB
-2
WINTER
RA DB
RA WB
54.4
SA DB
50.1
SA WB
41.0
V/PH
208/3
ELECTRICAL
MCA
5.2
MOCP
REMARKS
1,2,3,4
BUILDING 65 VRF BRANCH CONTROLLER SCHEDULE
TAG
BC-1
BC-2
REMARKS:
SERVICE
MAIN BRANCH CONTROLLER
SUB BRANCH CONTROLLER
MANUFACTURER
MITSUBISHI
MITSUBISHI
MODEL
CMB-P1013NU-GA1
CMB-P108NU-GB1
# OF BRANCHES
WEIGHT (LBS)
MCA
1.08
0.64
VOLTAGE
PHASE
REMARKS:
DESIGNED:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
TITLE OF SHEET
OF
200607 A
127962
CWC
SUB SHEET NO.
REVIEWED BY:
DMD
GATEWAY NATIONAL RECREATION AREA6
/2
/2
:1
:2
A
M C
U s e rs
\c c ro w \D o c u m e n ts
\2 N
P S
S A
H O
M P c c ro w S
C H
U C
.r v t
RELOCATE MAINTENANCE FACILITIES TO MORE
SUSTAINABLE LOCATIONS - SANDY HOOK UNIT
BUILDING #65 MECHANICAL
SCHEDULES
06.30.2017 236
M6.30
BUILDING 65 ELECTRIC HEAT SCHEDULE
TAG
EUH-1
EBB-3
EBB-4
REMARKS:
1.
2.
MANUFACTURER
CHROMALOX
BERKO
BERKO
PROVIDE WITH INTEGRAL TAMPERPROOF THERMOSTAT SET AT 70 DEG F.
PROVIDE WITH INTEGRAL ELECTICAL DISCONNECT
MODEL#
LUH-04
BKOC2515W
BKOC2515W
LENGTH
5'-0"
5'-0"
WATTS
VOLTAGE
AMPS
11.2
10.4
10.4
ELEC. PH
REMARKS
1,2
1,2
1,2
GRILLES, REGISTERS & DIFFUSERS
TAG
A
B
C
REMARKS:
1.
2.
MANUFACTURER
PRICE
PRICE
PRICE
PROVIDE WITH GYP BOARD MOUNTING KIT WHERE REQUIRED.
CONFIRM COLOR AND FINISH WITH ARCHITECT PRIOR TO ORDERING.
MODEL NUMBER
SERVICE
SUPPLY
RETURN
EXHAUST
FACE SIZE
18x6
18x6
12x12
MATERIAL
STEEL
STEEL
STEEL
REMARKS:
1,2
1,2
1,2
DESIGNED:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
TITLE OF SHEET
OF
200607 A
127962
CWC
SUB SHEET NO.
REVIEWED BY:
DMD
GATEWAY NATIONAL RECREATION AREA6
/2
/2
:1
:2
A
M C
U s e rs
\c c ro w \D o c u m e n ts
\2 N
P S
S A
H O
M P c c ro w S
C H
U C
.r v t
RELOCATE MAINTENANCE FACILITIES TO MORE
SUSTAINABLE LOCATIONS - SANDY HOOK UNIT
BUILDING #65 MECHANICAL
SCHEDULES
06.30.2017 237
M6.40
SCALE: NTS
EXHAUST/TRANSFER FAN DETAIL2
M7.20
SCALE: NTS
DUCT TO ATTIC VENT DETAIL4
M7.20
SCALE: NTS
CONCEALED FLOOR MOUNTED AC UNIT DETAIL5
M7.20
110 VAC SUPPLY CABLE
(PROVIDED)
POWER DISCONNECT
CABLE
(PROVIDED)AIRFLOW
RANGE HOOD
(PROVIDED)
CABINET
SOFFIT
PLENUM READY
SUPPLY CABLE TO
FAN (PROVIDED)
INLINE DUCT
FAN
(PROVIDED)
ROOF CAP
(BY OTHERS)
10" DUCTWORK
7" TO 10"
TRANSITION
SCALE: NTS
RANGE HOOD VENT DETAIL3
M7.20
CONNECT CUSTOM SHEET METAL BOX
TO EXISTING ATTIC VENT. SEAL OUTER
EDGES AS TIGHT AS POSSIBLE. WOOD
STRUCTURE DIRECTLY BELOW
EXISTING VENT TO REMAIN.
PROVIDE BDD
MOUNT FAN FROM
& VIBRATION ISOLATION
WITH METAL STRAPS
STRUCTURE ABOVE
CONNECTION
FLEXIBLE
CONNECTION
FLEXIBLE
SCALE: NTS
AUTO SHOP AHU DETAIL1
M7.20
AHU−1
CUSTOM UNISTRUT
STAND, UNIT SHALL BE
1’−0" ABOVE CRITICAL
EQUIPMENT LEVEL MIN.
FLEXIBLE DUCT
CONNECTION (TYP.)
FLOOR
AC UNIT
CUSTOM UNISTRUT
STAND, UNIT SHALL BE
1’−0" ABOVE FINISHED
FLOOR
FLEXIBLE
DUCT
CONNECTION
(TYP.)
FLOOR
W A L L
WALL
GRILLE LOW
ON WALL
FOR
RETURN AIR
WALL
GRILLE HIGH
ON WALL
FOR SUPPLY
AIR
OA DUCT FROM BELOW STUBBED UP THRU
FLOOR TO FEED INTO UNITS RETURN AIR
ELBOW WITH
TURNING
VANES
SCALE: NTS
BUILDING #49 SPLIT SYSTEM HEAT PUMP PIPING DETAIL6
M7.20
FILTER DRYER
HEAT PUMP
HP−1
CONDENSING UNIT
SOLENOID VALVE SIGHT GLASS
CHARGING VALVE
LIQUID LINE
EXPANSION VALVE
AHU-1F
E X T E R
IO
R
IN
T E R
IO
R ROUTE HIGH INSIDE OF BUILDING
TO MECHANICAL ROOM
SCALE: NTS
BUILDING #65 SPLIT SYSTEM HEAT PUMP PIPING DETAIL7
M7.20
FILTER DRYER
HEAT PUMP
HP−2
CONDENSING UNIT
SOLENOID VALVE
SIGHT GLASS
CHARGING VALVE
LIQUID LINE
EXPANSION VALVE
BC-1
AND 2
F
E X T E R
IO
R
IN
T E R
IO
R
ROUTE HIGH INSIDE OF BUILDING
TO MECHANICAL ROOM
CRAWLSPACE
DUCT TO ERV
CONNECT DUCT FROM
ERV TO CUSTOM SHEET
METAL BOX.
ROUTE DUCT TIGHT TO BOTTOM
OF ROOF DECK IN BETWEEN
WOOD STRUCTURE.
GYP. CEILING
WOOD STRUCTURE
WOOD STRUCTURE
GYP. CEILING
WOOD STRUCTURE
DUCT TO ERV
CONNECT DUCT FROM
ERV TO CUSTOM SHEET
METAL BOX.
EXISTING ATTIC VENT
ROUTE DUCT TIGHT TO
BOTTOM OF ROOF DECK
IN BETWEEN WOOD
STRUCTURE.
CONNECT CUSTOM SHEET METAL BOX TO
EXISTING ATTIC VENT. SEAL OUTER
EDGES AS TIGHT AS POSSIBLE. WOOD
STRUCTURE DIRECTLY BELOW EXISTING
VENT TO REMAIN.
EXISTING ATTIC VENT
ROUTE PIPING INTO MECHANICAL ROOM
UNDER EXTERIOR PLATFORM AND UP
THRU FLOOR IN WALL
EXTERIOR PLATFORM
EXTERIOR PLATFORM
COMPONENT LOCATED
INSIDE HP−1 CABINET
COMPONENT LOCATED
INSIDE HP−2 CABINET
ROUTE PIPING INTO MECHANICAL ROOM
UNDER EXTERIOR PLATFORM AND UP
THRU FLOOR IN WALL
DESIGNED:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
TITLE OF SHEET
OF
200607 A
127962
CWC
SUB SHEET NO.
REVIEWED BY:
DMD
GATEWAY NATIONAL RECREATION AREA6
/2
/2
:1
:2
A
M C
U s e rs
\c c ro w \D o c u m e n ts
\2 N
P S
S A
H O
M P c c ro w S
C H
U C
.r v t
RELOCATE MAINTENANCE FACILITIES TO MORE
SUSTAINABLE LOCATIONS - SANDY HOOK UNIT
MECHANICAL DETAILS
06.30.2017 243
M7.20
(E.) #49 T.O. RIDGE
120' - 0"
AUTOSHOP ROOF
PEAK
129' - 0"
AUTO SHOP FLOOR
100’ − 0"
CRITICAL SYSTEMS #68
106’ − 5"
12"x24"
12"x24"
12"x24"
12"x24"
ERV−4
VEHICLE/LIFT CLEARANCE
MOUNT ERV ABOVE HOIST
STRUCTURAL BEAMS
BUILDING #65
SECOND FLOOR
110' - 0"
(E) #65 SECOND FLOOR
110’ − 2"
3.3 3.4 3.5 3.6 3.7 3.8
12"ø
12"x8" 12"ø 14"x6"
8"x12"
ERV−3
oa/ea up in between wood structure to existing vent on roof
DESIGNED:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
TITLE OF SHEET
OF
200607 A
127962
CWC
SUB SHEET NO.
REVIEWED BY:
DMD
GATEWAY NATIONAL RECREATION AREA6
/2
/2
:1
:3
A
M C
U s e rs
\c c ro w \D o c u m e n ts
\2 N
P S
S A
H O
M P c c ro w S
C H
U C
.r v t
RELOCATE MAINTENANCE FACILITIES TO MORE
SUSTAINABLE LOCATIONS - SANDY HOOK UNIT
MECHANICAL DETAILS
06.30.2017 244
M7.30
SCALE A
M7.30
AUTO SHOP ERV ELEVATION1
SCALE A
M7.30
BUILDING #65 ERV ELEVATION2
SCALE A
4’ 0’ 4’
SCALE OF FEET
8’ 16’
P1 P1 P1 P1 P1
SCALE: NTS
BUILDING #65 VRF FLOW DIAGRAM1
M7.40
OPEN OFFICE 320 CONFERENCE 309 OFFICE 324 OFFICE 323 STORAGE 308 CONFERENCE 309 STORAGE 308 OFFICE 307 OFFICE 310 OPEN OFFICE 320 OPEN OFFICE 301 FILE STORAGE 303 OPEN OFFICE 320 OFFICE 322 OFFICE 321 WORK ROOM 302
AC−10 AC−9 AC−3 AC−12 AC−11 AC−18 AC−4 AC−8 AC−2 AC−1 AC−15 AC−17 AC−5 AC−6 AC−16 AC−13 AC−14 AC−7
AE−200A−A
M−NET
TB3 LAN
TB5 TB15
L1L2 G
GP1 TB5TB15
L1L2 G
GP2 TB5 TB15
L1L2 G
GP3 TB5 TB15
L1L2 G
GP4 TB5 TB15
L1L2 G
GP5 TB5 TB15
L1L2 G
GP6 TB5 TB15
L1L2 G
GP7 TB5 TB15
L1L2 G
GP8 TB5 TB15
L1L2 G
GP9 TB5 TB15
L1L2 G
GP10 TB5 TB15
L1L2 G
GP11 TB5 TB15
L1L2 G
GP12 TB5 TB15
L1L2 G
GP13 TB5 TB15
L1L2 G
GP14 TB5 TB15
L1L2 G
GP15 TB5 TB15
L1L2 G
GP16 TB5 TB15
L1L2 G
GP17 TB5 TB15
L1L2 G
GP18
PVFY−
P12E00A
PVFY−
P12E00A
PKFY−
P08NHMU−E2
PVFY−
P12E00A
PVFY−
P12E00A
PFFY−
P06NEMU−E
PKFY−
P08NHMU−E2
PKFY−
P08NHMU−E2
PFFY−
P06NEMU−E
PKFY−
P24NKMU−E2.TH
PKFY−
P24NKMU−E2.TH
PKFY−
P24NKMU−E2.TH
PKFY−
P12NHMU−E2
PKFY−
P12NHMU−E2
PKFY−
P12NHMU−E2
PKFY−
P15NHMU−E2
PFFY−
P08NEMU−E
PFFY−
P08NEMU−E
P1 P1 P1 P1 P1 P1 P1 P1 P1 P1P2 P2 P2
J1 J1 J1 J1 J1 J1 J1 J1 J1 J1 J1 J1 J1 J1 J1
1 2 3 4 5 6 7 8 9 10 11 12 13 1 2 3 4 5 G G
BC CONTROLLER 1
CMB−P1013NU−GA1
SUB CONTROLLER
CMB−P108NU−GB1
P3 TB2 054
TO MAIN BC
P5
TB2 053
P4
TO SUB BC
16−2 AWG(S)
16−2 AWG(S) P6
P6P7
TB3 G
P0
TB3 G
PURY−P96TLMU−A
PURY−P96TLMU−A
TB7TB7 DIP SWITCH 3−8 ON HIGH HEATING
PERFORMANCE MODE
SYSTEM 1
OUTDOOR UNIT 1
PURY−
P192TSLMU−A
16−2 AWG(S)
P1
P2
P3
P4
P5
P6
P7
1/4
3/8
3/8
7/8
3/4
7/8
1/2
5/8
3/4
1−1/8
SYMBOL LIQUID GAS PIPE SIZE
J1 REDUCER
SYMBOL BRANCH PIPE MODEL
NAME
PIPING LIST
REF PIPE
CONTROL WIRE
DISPLAY DESCRIPTION
DIAGRAM SYMBOL LEGEND
DESIGNED:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
TITLE OF SHEET
OF
200607 A
127962
CWC
SUB SHEET NO.
REVIEWED BY:
DMD
GATEWAY NATIONAL RECREATION AREA6
/2
/2
:1
:3
A
M C
U s e rs
\c c ro w \D o c u m e n ts
\2 N
P S
S A
H O
M P c c ro w S
C H
U C
.r v t
RELOCATE MAINTENANCE FACILITIES TO MORE
SUSTAINABLE LOCATIONS - SANDY HOOK UNIT
BUILDING #65 VRF FLOW
DIAGRAM
06.30.2017 245
M7.40
DESIGNED:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
TITLE OF SHEET
OF
200607 A
127962
CWC
SUB SHEET NO.
REVIEWED BY:
DMD
GATEWAY NATIONAL RECREATION AREA6
/2
/2
:1
:3
A
M C
U s e rs
\c c ro w \D o c u m e n ts
\2 N
P S
S A
H O
M P c c ro w S
C H
U C
.r v t
RELOCATE MAINTENANCE FACILITIES TO MORE
SUSTAINABLE LOCATIONS - SANDY HOOK UNIT
MECHANICAL CONTROLS
06.30.2017 246
M7.50
BUILDING #49 CONTROLS SEQUENCE:
AHU−1: PROVIDE 7−DAY PROGRAMMABLE THERMOSTAT FOR AHU−1 WITH ONE STAGE OF COOLING AND TWO STAGES OF HEATING. FIRST STAGE OF HEAT SHALL BE THE OUTDOOR HEAT PUMP, HP−1. SECOND STAGE OF HEAT SHALL BE THE GAS FIRED SECTION OF AHU−1.
OCCUPIED HOURS: COOLING SETPOINT = 75° F
HEATING SETPOINT = 70° F
UNOCCUPIED HOURS: COOLING SETPOINT = 80° F
HEATING SETPOINT = 65° F
PROVIDE 2−HOUR OVERRIDE BUTTON ON THERMOSTAT TO ALLOW OCCUPANT TO CHANGE UNOCCUPIED MODE TO OCCUPIED MODE FOR A PERIOD OF 2−HOURS.
INTERLOCK AHU−1 TO ERV−2 SUCH THAT ERV−2 RUNS ANYTIME AHU−1 IS RUNNING.
ERV−1: PROVIDE 7−DAY PROGRAMMABLE TIME CLOCK TO TURN ERV ON/OFF. ERV SHALL BE ON DURING ALL OCCUPIED HOURS AND SHALL BE OFF DURING UNOCCUPIED HOURS. PROVIDE OVERRIDE BUTTON/SWITCH TO ALLOW FOR ERV TO BE CHANGED FROM UNOCCUPIED MODE TO OCCUPIED MODE FOR A PERIOD OF TWO HOURS BY THE
OCCUPANT.
WHEN UNIT IS OFF THE OUTSIDE AIR AND EXHAUST AIR DAMPERS SHALL BE CLOSED.
ERV−2: INTERLOCK TO AHU−1 TO OPERATE WHENEVER AHU−1 IS IN OPERATION.
WHEN UNIT IS OFF THE OUTSIDE AIR AND EXHAUST AIR DAMPERS SHALL BE CLOSED.
TF−1: PROVIDE COOLING ONLY THERMOSTAT FOR TRANSFER FAN IN SERVER ROOM #208. SET THERMOSTAT TO 75° F (ADJ.). FAN SHALL TURN ON WHENEVER THE
SPACE TEMPERATURE EXCEEDS 75° F.
EBB−1 AND EBB−2: PROVIDE WALL MOUNTED THERMOSTAT FOR ELECTRIC BASEBOARD HEATERS IN THE RESTROOMS. SET THERMOSTAT TO MAINTAIN 70°F. PROVIDE INSULATED WALL BACKING ON THERMOSTATS IN BOTH RESTROOMS.
EF−1: CONNECT EXHAUST FAN TO 7−DAY PROGRAMMABLE TIMECLOCK ASSOCIATED WITH ERV−1. EXHAUST FAN SHALL OPERATE DURING OCCUPIED TIMES AND BE OFF
DURING UNOCCUPIED TIMES.
EF−2: PROVIDE OCCUPANCY SENSOR TO TURN FAN ON UPON ACTIVATION OF SENSOR. PROVIDE MANUAL OVERRIDE SWITCH NEXT TO OCCUPANCY SENSOR TO ALLOW THE
OCCUPANT TO TURN THE FAN ON WHEN THE ROOM IS NOT OCCUPIED.
GUH−1, 2, 3, 4, 11, & 12: PROVIDE HEATING ONLY THERMOSTAT FOR GAS UNIT HEATERS. LOCATE THERMOSTATS AS SHOWN ON THE PLANS. GUH−3 AND GUH−4 SHALL BE
CONTROLLED VIA THE SAME THERMOSTAT. SET THERMOSTAT TO MAINTAIN 65° F (ADJ.).
BUILDING #65 CONTROLS SEQUENCE:
AC UNITS & HP−2: PROVIDE SYSTEM CONTROLS TO ALLOW INDOOR AIR CONDITIONING UNITS TO PROVIDE HEATING AND COOLING BASED ON SPACE TEMPERATURE.
EACH AC UNIT SHALL BE PROVIDED WITH A SEPARATE 7−DAY PROGRAMMABLE THERMOSTAT WITH A 2−HOUR OCCUPANCY OVERRIDE.
OCCUPIED HOURS: COOLING SETPOINT = 75° F
HEATING SETPOINT = 70° F
UNOCCUPIED HOURS: COOLING SETPOINT = 80° F
HEATING SETPOINT = 65° F
IN LOCATIONS WHERE THERMOSTATS ARE LOCATED ON EXTERIOR WALLS, PROVIDE A INSULATED WALL BACKING ON THE THERMOSTAT.
HP−2 SHALL BE CAPABLE OF PROVIDING SIMULTANEOUS HEATING AND COOLING FOR THE SPACE SUCH THAT MULTIPLE UNITS CAN BE IN COOLING MODE AND
MULTIPLE UNITS CAN BE IN HEATING MODE AT THE SAME TIME.
ERV−3: PROVIDE 7−DAY PROGRAMMABLE TIME CLOCK TO TURN ERV ON/OFF. ERV SHALL BE ON DURING ALL OCCUPIED HOURS AND SHALL BE OFF DURING UNOCCUPIED HOURS. PROVIDE OVERRIDE BUTTON/SWITCH TO ALLOW FOR ERV TO BE CHANGED FROM UNOCCUPIED MODE TO OCCUPIED MODE FOR A PERIOD OF TWO HOURS BY
THE OCCUPANT.
WHEN UNIT IS OFF THE OUTSIDE AIR AND EXHAUST AIR DAMPERS SHALL BE CLOSED.
EBB−3 AND EBB−4: PROVIDE WALL MOUNTED THERMOSTAT FOR ELECTRIC BASEBOARD HEATERS IN THE RESTROOMS. SET THERMOSTAT TO MAINTAIN 70°F. PROVIDE
INSULATED WALL BACKING ON THERMOSTATS IN BOTH RESTROOMS.
EUH−1: PROVIDE HEATING ONLY THERMOSTAT FOR ELECTRIC UNIT HEATERS. LOCATE THERMOSTATS AS SHOWN ON THE PLANS. SET THERMOSTAT TO MAINTAIN
65° F (ADJ.).
AUTO SHOP CONTROLS SEQUENCE:
AHU−2: PROVIDE 7−DAY PROGRAMMABLE THERMOSTAT FOR AHU−2 WITH ONE STAGE OF COOLING AND TWO STAGES OF HEATING. FIRST STAGE OF HEAT SHALL BE THE OUTDOOR HEAT PUMP, HP−3. SECOND STAGE OF HEAT SHALL BE THE GAS FIRED SECTION OF AHU−2.
OCCUPIED HOURS: COOLING SETPOINT = 75° F
HEATING SETPOINT = 70° F
UNOCCUPIED HOURS: COOLING SETPOINT = 80° F
HEATING SETPOINT = 65° F
PROVIDE 2−HOUR OVERRIDE BUTTON ON THERMOSTAT TO ALLOW OCCUPANT TO CHANGE UNOCCUPIED MODE TO OCCUPIED MODE FOR A PERIOD OF 2−HOURS.
ERV−4: PROVIDE 7−DAY PROGRAMMABLE TIME CLOCK TO TURN ERV ON/OFF. ERV SHALL BE ON DURING ALL OCCUPIED HOURS AND SHALL BE OFF DURING UNOCCUPIED HOURS. PROVIDE OVERRIDE BUTTON/SWITCH TO ALLOW FOR ERV TO BE CHANGED FROM UNOCCUPIED MODE TO OCCUPIED MODE FOR A PERIOD OF TWO HOURS BY
THE OCCUPANT.
WHEN UNIT IS OFF THE OUTSIDE AIR AND EXHAUST AIR DAMPERS SHALL BE CLOSED.
TF−2: PROVIDE COOLING ONLY THERMOSTAT FOR TRANSFER FAN IN IT CLOSET. SET THERMOSTAT TO 75° F (ADJ.). FAN SHALL TURN ON WHENEVER THE SPACE
TEMPERATURE EXCEEDS 75° F.
EF−3: CONNECT EXHAUST FAN TO 7−DAY PROGRAMMABLE TIMECLOCK ASSOCIATED WITH ERV−4. EXHAUST FAN SHALL OPERATE DURING OCCUPIED TIMES AND BE
OFF DURING UNOCCUPIED TIMES.
EF−4: PROVIDE ON/OFF SWITCH ON WALL TO ALLOW THE OCCUPANT TO CONTROL THE FAN.
EUH−3 AND EUH−4: PROVIDE WALL MOUNTED THERMOSTAT FOR ELECTRIC BASEBOARD HEATERS IN THE RESTROOMS. SET THERMOSTAT TO MAINTAIN 70°F. PROVIDE
INSULATED WALL BACKING ON THERMOSTATS IN BOTH RESTROOMS.
GUH−5, 6, 7, 8, 9 & 10: PROVIDE HEATING ONLY THERMOSTAT FOR GAS UNIT HEATERS. LOCATE THERMOSTATS AS SHOWN ON THE PLANS. SET THERMOSTAT TO
MAINTAIN 65° F (ADJ.).
EUH−2: PROVIDE HEATING ONLY THERMOSTAT FOR ELECTRIC UNIT HEATERS. LOCATE THERMOSTATS AS SHOWN ON THE PLANS. SET THERMOSTAT TO MAINTAIN
65° F (ADJ.).
DVE−1 & 2: PROVIDE SPRING DAMPER AT HOSE REEL OUTLET TO TURN ASSOCIATED EXHAUST FAN ON/OFF WHEN HOSE REEL IS IN USE.
DRAWING NO.
PMIS/PKG NO.
SHEET
TITLE OF SHEET
OF
200607 A
127962
CWC
SUB SHEET NO.
REVIEWED BY:
DMD
GATEWAY NATIONAL RECREATION AREA6
/2
/2
:1
:3
A
M C
U s e rs
\c c ro w \D o c u m e n ts
\2 N
P S
S A
H O
M P c c ro w S
C H
U C
.r v t
RELOCATE MAINTENANCE FACILITIES TO MORE
SUSTAINABLE LOCATIONS - SANDY HOOK UNIT
BUILDING #65 COMCHECK
06.30.2017 250
M8.30
DRAWING NO.
PMIS/PKG NO.
SHEET
TITLE OF SHEET
OF
200607 A
127962
CWC
SUB SHEET NO.
REVIEWED BY:
DMD
GATEWAY NATIONAL RECREATION AREA6
/2
/2
:1
:3
A
M C
U s e rs
\c c ro w \D o c u m e n ts
\2 N
P S
S A
H O
M P c c ro w S
C H
U C
.r v t
RELOCATE MAINTENANCE FACILITIES TO MORE
SUSTAINABLE LOCATIONS - SANDY HOOK UNIT
BUILDING #65 COMCHECK
06.30.2017 251
M8.40
File details come from the government source that posted it. Updated .