A04_Spec_Sheets.pdf
PDF 2 MB Posted
- Attached to
- GATE-TROUBLESHOOT & REPAIR HVAC-BLDG 65
- Solicitation number
- 140P4525Q0047
About this file
These specification sheets detail Mitsubishi Electric CITY MULTI VRF (Variable Refrigerant Flow) heat pump system components for a maintenance facilities relocation project at Sandy Hook, with Contract # 106806-S-007 under Prime Contract P17PC00406. The documentation covers multiple system components including:
The primary outdoor unit is a 16-ton PURY-P192TSLMU-A (-BS) heat pump system consisting of two PURY-P96TLMU-A (-BS) modules and a CMY-ER200CBK twinning kit. The system uses R410A refrigerant and operates across a temperature range of -13°F to 126°F, with a nominal cooling capacity of 192,000 BTU/h and heating capacity of 215,000 BTU/h. Electrical requirements are 208/230V, 3-phase, 60Hz, with additional components including a main BC controller (CMB-P1013NU-GA1) and a sub BC controller (CMB-P108NU-GB1) to manage refrigerant piping and indoor unit connections.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P4525Q0047_Amd_0001.pdf | ||
| Sol_140P4525Q0047.pdf | ||
| A06_Pages_from_SAHO_Construction_Drawings.pdf | ||
| B03_NJ20250037.pdf | ||
| B08_References_Worksheet_(1)_(1).pdf | ||
| A04_2025-03_SOW_Heat_pump_TS_and_Repair.docx | DOCX document | |
| A06_Photos_of_HVAC_systems_at_B65.docx | DOCX document | |
| B08_Price_Schedule_GATE_Troubleshoot_B65.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Specifications are subject to change without notice. © 2016 Mitsubishi Electric US, Inc.
Job Name:
System Reference: Date:
Specifications System Module 1 Module 2 Unit Type PURY-P192TSLMU-A (-BS) PURY-P96TLMU-A (-BS) PURY-P96TLMU-A (-BS)
Nominal Cooling Capacity (208/230V) Btu/h 192,000 96,000 96,000
Nominal Heating Capacity (208/230V) Btu/h 215,000 108,000 108,000
Operating Temperature Range *1
Cooling (Outdoor) *2 Refer to Module Data 23~126° F (-5~52° C) DB Heating (Outdoor) -13~60° F (-25~15.5° C) WB
External Dimensions (H x W x D) In. (mm) Refer to Module Data 64-31/32 x 48-1/16 x 29-5/32
(1,650 x 1,220 x 740) 64-31/32 x 48-1/16 x 29-5/32
(1,650 x 1,220 x 740) Net Weight Lbs. (kg) 1,006 (456) 503 (228) 503 (228) External Finish Refer to Module Data Pre-coated galvanized steel sheet Electrical Power Requirements Voltage, Phase, Hertz Refer to Module Data** 208 / 230V, 3-Phase, 60Hz
Minimum Circuit Ampacity (MCA) A Refer to Module Data** 33 / 30 33 / 30
Maximum Overcurrent Protection (MOP) A Refer to Module Data** 50 / 50 50 / 50
Piping Diameter (Brazed) From From Twinning Kit to BC Controller (In. / mm)
Liquid (High Pressure) 7/8 (22.2) Refer to System Data
Gas (Low Pressure) 1-1/8 (28.58) Max. Total Refrigerant Line Length Ft. 2,461
Refer to System DataMax. Refrigerant Line Length (Between ODU & IDU) Ft. 541
Max. Control Wiring Length Ft. 1,640
Indoor Unit Total Capacity 50~150% of ODUs Refer to System Data Model / Quantity P06~P96/1~48 Refer to System Data
Sound Pressure Level dB(A) 61.0 Refer to System Data Fan Type x Quantity Refer to Module Data Propeller fan x 1 Propeller fan x 1 Airflow Rate CFM 6,550 6,550 External Static Pressure In. WG Refer to Module Data Selectable; 0, 0.12 or 0.24”WG; factory set to 0”W.G.
Compressor Operating Range 6% to 100% Refer to System Data
Compressor Type x Quantity Refer to Module Data Inverter-driven Scroll Hermetic x 1
Inverter-driven Scroll Hermetic x 1
Refrigerant Refer to Module Data R410A; 17 lbs. + 10 oz. (8.0 kg) R410A; 17 lbs. + 10 oz. (8.0 kg)
Protection Devices
High Pressure
Refer to Module Data
High pressure sensor, High pressure switch at
4.15 MPa (601 psi)
High pressure sensor, High pressure switch at
4.15 MPa (601 psi)
Inverter Circuit (Comp. / Fan) Over-current protection Over-current protection
Fan Motor Thermal switch Thermal switch
AHRI Ratings (Ducted/Non-Ducted)
EER 11.4 / 12.1
Refer to System Data
IEER 23.5 / 23.9
COP 3.53 / 3.59
SCHE 23.0 / 28.0
Outdoor Unit: 16-TON PURY-P192TSLMU-A (-BS) (Consists of Two PURY-P96TLMU-A (-BS) and One CMY-ER200CBK Twinning Kit)
UNIT OPTION
□ Standard Model…...…...…………......………PURY-P192TSLMU-A
□ Seacoast (BS) Model…….....……......….PURY-P192TSLMU-A-BS
ACCESSORIES
□ Twinning Kit (required)..............................................…CMY-ER200CBK
□ Joint Kit.............................…for details see Pipe Accessories Submittal
□ BC Controller (required)…..............for details see BC Controller Submittals
□ Low Ambient Kit ...............…..for details see Low Ambient Kit Submittal
□ Snow/Hail Guards Kit......…for details see Snow/Hail Guards Kit Submittal
□ Base Pan Heater Kit.............for details see Base Pan Heater Kit Submittal
OUTDOOR VRF HEAT PUMP WITH
HEAT RECOVERY SYSTEM
NOTES:
*1. When applying product below -4° F, consult your design engineer for cold climate application best practices, including the use of a backup source for heating.
*2. For details on extended cooling operation range down to -10° F DB, see Low Ambient Kit Submittal.
** Each individual module requires a separate electrical connection.
Refer to electrical data for each individual module.
B65 0057 Relocate Maintenance Facilities, Sandy Hook Contract# 106806-S-007 (Prime Contract P17PC00406)
Specifications are subject to change without notice. © 2016 Mitsubishi Electric US, Inc.
Outdoor Unit: PURY-P192TSLMU-A (-BS) – DIMENSIONS
NOTES:
SEACOAST PROTECTION
• Anti-corrosion Protection: A coating treatment is applied to condenser coil for protection from air contaminants.
• Standard: Salt Spray Test Method - no unusual rust development to 480 hours.
• Sea Coast (BS): Salt Spray Test Method (JRA 9002) - no unusual rust development to 960 hours.
Fr on t v ie w
Le ft vi ew
O ut do or u ni t 2 O ut do or u ni t 1
To B
C c on tro lle r
To B
C c on tro lle r a b e f c d
Tw in ni ng p ip e( H ig h pr es su re
<o pt io na l p ar ts
Tw in ni ng p ip e( Lo w p re ss ur e)
<o pt io na l p ar ts
In ta ke ai r In ta ke ai r
D is ch ar ge a ir
In ta ke ai r
Lo w pr es su re
U ni t m od el C om po ne nt un it m od el c e d f
Hi gh p re ss ur e
O ut do or u ni t Tw in ni ng K it Lo w pr es su re
Tw in ni ng p ip e co nn ec tio n si ze
O ut do or u ni t 1 C om po ne nt u ni t n am e
P ac ka ge u ni t n am e
BC
c on tro lle r~
Tw in ni ng p ip e a b
Hi gh p re ss ur e O ut do or T w in ni ng
K it( op tio na l p ar ts
C
M Y-
E R
0C
B K
O ut do or u ni t 2 ø2 8.
(1
-1 /8 ø2
2.
2(
7/ 8)
N ot e 1.
C on ne ct th e pi pe s as s ho w n in th e fig ur e ab ov e.
R ef er to th e ta bl e ab ov e fo r t he p ip e si ze
.T w in ni ng p ip e
(H ig h pr es su re ) s ho ul d no t b e til te d m or e th an de gr ee s fro m th e ho riz on ta l p la ne
B e su re to s ee th e In st al la tio n M an ua l f or d et ai ls o f T w in ni ng p ip e in st al la tio n.
.T he p ip e se ct io n be fo re th e Tw in ni ng p ip e
(s ec tio n
"a " i n th e fig ur e) m us t h av e at le as t 5 m m
(1 9-
/1
6) o f s tra ig ht s ec tio n in cl ud in g th e st ra ig ht p ip e th at is s up pl ie d w ith th e Tw in ni ng p ip e)
.O nl y us e th e
Tw in ni ng p ip e by
M its ub is hi (o pt io na l p ar ts
.C on ne ct th e ou td oo r u ni t 1 w ith th e Tw in ni ng p ip e
(L ow p re ss ur
e) (s ec tio n "d
" i n th e fig ur e)
PU
RY
-P
2T
SL
M U-
A( -B
S)
PU
RY
-P
TL
M U-
A( -B
S)
PU
RY
-P
TL
M U-
A( -B
S) ø1 9.
(3
/4
P
P
(N ot e 5) ø1
9.
(3 /4
P ø2 2.
2( 7/
8)
(1
-3 /1
6)
(4
8- 1/
(4 8-
1/
1650(65)
0(
-3
/1 6)
PURY-P192TSLMU-A(-BS)
Unit: mm (in.)
B65 0057 Relocate Maintenance Facilities, Sandy Hook Contract# 106806-S-007 (Prime Contract P17PC00406)
Specifications are subject to change without notice. © 2016 Mitsubishi Electric US, Inc.
Modules 1 and 2: PURY-P96TLMU-A (-BS) – DIMENSIONS
NOTES:
SEACOAST PROTECTION
• Anti-corrosion Protection: A coating treatment is applied to condenser coil for protection from air contaminants.
• Standard: Salt Spray Test Method - no unusual rust development to 480 hours.
• Sea Coast (BS): Salt Spray Test Method (JRA 9002) - no unusual rust development to 960 hours.
Le ft si de v ie w
B ot to m v ie w
Fr on t v ie w
To p vi ew
(1-3/16) (1-3/16) (Mounting pitch)
(26-3/4~26-15/16)
(26-13/16)
(M ou nt in g pi tc h)
(2 -1
/4
(2 -1
/4
(1 3/
(1 3/
<S no w h oo d at ta ch m en t h ol e >
4× 5-ø4 .6
(3 /1
6) H ol e
(M ak e ho le a t t he p la st ic fa n gu ar d fo r s no w h oo d at ta ch m en t )
In ta ke ai r
D is ch ar ge a ir
C on tro l b ox
In ta ke ai r
S er vi ce pa ne l
In ta ke ai r
<S lin g ho le
2× 2-
(9
/1 6)
×2 0(
/1
6) O va l h ol e
2× 2-
(3
-3 /1
6) ×3
5( 1-
7/
) O va l h ol e
R ef rig er an t s er vi ce v al ve
<H ig h pr es su re
R ef rig er an t s er vi ce v al ve
<L ow p re ss ur e>
Fr on t v ie w S er vi ce v al ve
B ot to m v ie w S er vi ce v al ve
A
(10-3/8)
(9 -5
/8
(5 -9
/1 6)
(5-3/4)
A
(1 3/
(2-13/16)=(5-15/16)×4
(5-15/16)
(23-5/8) (8-9/16)
(3-9/16)(3-1/16)
(9 -1
5/
(1
0- 3/
4)
(11-15/16)
(1 3/
(740)(29-3/16)
(3 -3
/1 6)
(3 -3
/1 6)
(4-13/16)
(7-3/4)
(3-5/16) (3-3/4)
(1 0-
3/ 4)
(8 -1
5/
(9 -5
/1 6)
(5-3/4)
(5 -1
5/
.A t b ra zi ng o f p ip es ,w ra p th e re fri ge ra nt s er vi ce v al ve w ith w et c lo th a nd k ee p th e te m pe ra tu re o f re fri ge ra nt s er vi ce v al ve u nd er
°C (2
F)
(3 -1
/1 6)
(5 -9
/1 6)
(3 -3
/4
(5 -1
5/
(2 -1
/2
(2 -9
/1 6)
(1 -3
/8
(1 -1
3/
P ip e
(ID
ø2
8.
(1 -1
/8
O D ø2 2.
2( 7/
8) pc
E lb ow
(ID
ø2
8.
(1 -1
/8
O D ø2 8.
(1
-1 /8
● 1 pc
<A cc es so rie s>
●C on ne ct in g pi pe
Lo w p re ss ur e>
<H ig h pr es su re
P ip e
(ID
ø2
5.
4(
1) ×I
D ø1
9.
(3 /4
● 1 pc
P ip e
(ID
ø2 5.
4( 1)
×O D ø1 9.
(3
/4 pc
*1 U se th e in cl ud ed c on ne ct in g pi pe a nd c on ne ct to th e re fri ge ra nt s er vi ce va lv e pi pi ng
C on ne ct in g pi pe s pe ci fic at io ns
H ig h pr es su re ø2
5.
Lo w pr es su re
S er vi ce v al ve R ef rig er an t p ip e
D ia m et er
*1
H ig h pr es su re Lo w pr es su re
M od el
PU
R
Y- P9
6T
LM
U ø2
8.
ø 2 2.
Br az ed ø1 9.
B ra ze d *1
(U se s w he n tw in ni ng k it
(o pt io na l p ar ts
) i s m ou nt ed ø4
K no ck ou t h ol e
S pe ci fic at io ns ø4 3.
or ø
.2 K no ck ou t h ol e ø6 2.
or ø
.5 K no ck ou t h ol e
Fr on t t hr ou gh h ol e
Bo tto m th ro ug h ho le
Bo tto m th ro ug h ho le
Fr on t t hr ou gh h ol e
Fr on t t hr ou gh h ol e
Fo r w ire s
U sa ge
Fr on t t hr ou gh h ol e
Fr on t t hr ou gh h ol e
K no ck ou t h ol e
K no ck ou t h ol e Bo tto m th ro ug h ho le
Fo r p ip es ø5
K no ck ou t h ol e
Fo r t ra ns m is si on c ab le s ø3
K no ck ou t h ol e ø6
K no ck ou t h ol e
(1
(1 -1
/8
(7 /8
(3
/4
(1 -3
/4
(7 /8
(1 -3
/8
(2 -1
/1 6)
1 2 43 5 6 7N O
29.5
54(2-3/16)
(2
-5 /1
6)
(4
1- 3/
4)
6(
-1
/8
600=150×4
(3
(4 8-
1/
1650(65)
1347(53-1/16)
29.5
740(29-3/16)
(4 6-
1/ 2)
0(
5- 9/
681(678~684)
.5
.5
327(12-7/8)
N ot e1 .P le as e re fe r t o th e en gi ne er in g m an ua l f or in fo rm at io n ga rd in g ne ce ss ar y sp ac in g ar ou nd th e un it an d fo un da tio n w or k.
O ut do or u ni t m us t b e m ou nt ed a t l ea st
" o ff th e gr ou nd o r 1
2" a bo ve th e hi gh es t a ve ra ge s no de pt h, w hi ch ev er is g re at er
PURY-P96TLMU-A(-BS)
B65 0057 Relocate Maintenance Facilities, Sandy Hook Contract# 106806-S-007 (Prime Contract P17PC00406)
Specifications are subject to change without notice. © 2016 Mitsubishi Electric US, Inc.
1340 Satellite Boulevard. Suwanee, GA 30024 Toll Free: 800-433-4822 www.mehvac.com
Twinning Kit: CMY-ER200CBK
FORM# PURY-P192TSLMU-A (-BS) - 201605
2 - 265
R
9. OPTIONAL PARTS DATA U11
MEE14K031
9-2. OUTDOOR TWINNING KIT
The following optional Outdoor Twinning Kit is needed to use to combine multiple refrigerant pipes. Refer to the chapter entitled System Design Section for the details of selecting a proper twinning kit.
High-pressure twinning pipe
Low-pressure pipe twinning kit <Elbow pipe(Accessory)>
<Accessory> Fixing screw • • • 1 Pipe cover • • • 1 Cable tie • • • 2 Insulation cover • • • 1 Buffer • • • 1(Outside diameter)
(Outside diameter)
<Pipe for routing through the front (Accessory)>
(Outside diameter)
<Pipe for routing through the bottom (Accessory)> high-pressure side
Slope of the twinning pipe is at an angle within ±15° to the horizontal plane.
Note 1:Refer to the figure below for the installation position of the twinning pipe.
2:Pipe diameter is indicated by inside diameter.
Twinning pipe on the
(Outside diameter)
(Outside diameter)
(Outside diameter)
(Outside diameter)
<Deformed pipe(Accessory)>
<Deformed pipe(Accessory)>
50(2)
(2
(1
-7 /1
6)
80(3-3/16) ø28.58(ø1-1/8) ø28.58(ø1-1/8) ø22.2(ø7/8) ø22.2(ø7/8)
100(3-15/16)
7 30 ø28.58(ø1-1/8) ø28.58(ø1-1/8)
407(16-1/16)
17(11/16)117(4-5/8) ø22.2(ø7/8)
6(
5- 3/
4) ø19.05(ø3/4) ø22.2(ø7/8) ø25.4(ø1) ø19.05(ø3/4)
±1 5° ø19.05(ø3/4) ø25.4(ø1) ø19.05(ø3/4)
182(7-3/16)
1(
6- 3/
4)
303(11-15/16) ø22.2(ø7/8) ø19.05(ø3/4) ø19.05(ø3/4) ø22.2(ø7/8) ø15.88(ø5/8)ø19.05(ø3/4) ø19.05(ø3/4)ø15.88(ø5/8)
(1 -7
/1 6)
(3Pcs.)
(2 -1
/2
(1 -7
/1 6)
(5/16) (1-3/16)
(2 -3
/1 6)
(1-7/16)
(2-1/2)
(2-1/2)
(2-1/2)
(3-3/8)
Unit: mm (in.)CMY-ER100CBK
<Accessory>
Pipe cover • • • 1 Fixing screw • • • 1
Cable tie • • • 2 Insulation cover • • • 1
(Outside diameter)
(Outside diameter)
(Outside diameter)
(Outside diameter)
High-pressure twinning pipe
Low-pressure pipe twinning kit
<Elbow pipe(Accessory)>
<Deformed pipe(Accessory)>
<Deformed pipe(Accessory)>
<Pipe for routing through the front (Accessory)>
(Outside diameter)
(Outside diameter)
(Outside diameter)
<Pipe for routing through the bottom (Accessory)>
(Outside diameter)
(Outside diameter)
(Outside diameter)
(Outside diameter)
(Outside diameter)
(Outside diameter)
(Outside diameter)
108(4-5/16)
26(1-1/16)
62 17 6(
6-
/1 6)
427(16-13/16) ø31.75(ø1-1/4) ø28.58(ø1-1/8) ø28.58(ø1-1/8) ø22.2(ø7/8) ø34.93(ø1-3/8) ø19.05(ø3/4) ø41.28(ø1-5/8)
160(6-5/16)50(2)
(2 ø28.58(ø1-1/8) ø28.58(ø1-1/8) ø19.05(ø3/4) ø19.05(ø3/4)ø28.58(ø1-1/8) ø31.75(ø1-1/4) ø31.75(ø1-1/4) ø19.05(ø3/4) ø22.2(ø7/8) ø34.93(ø1-3/8)ø31.75(ø1-1/4) ø25.4(ø1) ø19.05(ø3/4) ø25.4(ø1) ø19.05(ø3/4)
303(11-15/16)
182(7-3/16)
0(
3-
/1 6) ø22.2(ø7/8) ø31.75(ø1-1/4) ø28.58(ø1-1/8) ø22.2(ø7/8) ø28.58(ø1-1/8) ø28.58(ø1-1/8)
136(5-3/8) ø22.2(ø7/8) ø19.05(ø3/4) ø19.05(ø3/4) ø22.2(ø7/8) ø15.88(ø5/8)ø19.05(ø3/4) ø22.2(ø7/8)ø28.58(ø1-1/8)
(1) (1-7/16)
(2 -1
/2
1- 5/
(2-1/2)
(2-1/2)
(2-3/4)
(2-1/8)
(2 -1
/8
(2-1/2)
(2-3/4)
(2-1/2)
(1 -7
/1 6)
(3-3/16)
(2-1/2)
(2-1/2)
(2-1/2)
(2-1/2)
(3Pcs.)
(2 -3
/1 6) high-pressure side
Slope of the twinning pipe is at an angle within ±15° to the horizontal plane.
Note 1:Refer to the figure below for the installation position of the twinning pipe.
2:Pipe diameter is indicated by inside diameter.
Twinning pipe on the
±1 5°
Unit: mm (in.)CMY-ER200CBK
The angle of the branch pipe for hign pressure is within against the horizontal plane.
2. Use the attached pipe to braze the port-opening of the distributer.
3. Pipe diameter is indicated by inside diameter.
4. Only use the Twinning pipe by Mitsubishi (optional parts) .
Note 1. Reference the attitude angle of the branch pipe below the fig.
Distributer
0000003529.BOOK 265 ページ 2015年3月19日 木曜日 午後8時10分
Unit: mm (inch)
B65 0057 Relocate Maintenance Facilities, Sandy Hook Contract# 106806-S-007 (Prime Contract P17PC00406)
System Reference: Date:
Specifications are subject to change without notice. © 2018 Mitsubishi Electric US, Inc.
SAMPLE IMAGE FOR REFERENCE
ACCESSORIES:
□ Joint Kit..........................................................................................CMY-R160-J1
□ Branch Joint (T-Branch)...........................................................CMY-Y102SS-G2
□ Condensate Pump (BlueDiamond)…….................................................X87-721
□ Condensate Pump (Sauermann)…........................................……...SI3100-230
□ Ball Valve (3/8” SAE Brazed)……......................................................BV38BBSI
□ Ball Valve (5/8” SAE Brazed)…….......................................................BV58BBSI
□ Sub BC Controller……........................................................CMB-1016NU-HB1*
□ Sub BC Controller……..........................................................CMB-104NU-GB1*
□ Sub BC Controller……..........................................................CMB-108NU-GB1*
*See Submittal for information on each option.
SPECIFICATIONS:
Indoor Unit Capacity Connectable To 1 Branch Btu/h 54,000
Number Of Branches 13
Electrical Requirements
Electrical Power Requirements 208 / 230V, 1 phase, 60Hz
Minimum Circuit Ampacity (MCA) A 1.08 / 0.97
Power Input (208 / 230V)
Cooling kW
0.178
Heating 0.086
Current Input (208 / 230V)
Cooling A
0.86 / 0.77
Heating 0.41 / 0.37
External Dimensions In.(mm) 11-13/32 x 43-23/32 x 20-1/2 (289 x 1,110 x 520)
Net Weight Lbs.(kg) 148 (67)
External Finish Galvanized steel plate
Refrigerant Piping Diameter to Indoor Unit (Brazed)
Liquid Gas less than 18,000 Btu/h In.(mm) 1/4 (6.35) 1/2 (12.7)
18,000 to 54,000 Btu/h In.(mm) 3/8 (9.52) 5/8 (15.88)
54,000 to 72,000 Btu/h In.(mm) 3/8 (9.52) 3/4 (19.05) greater than 72,000 Btu/h In.(mm) 3/8 (9.52) 7/8 (22.2)
Refrigerant Piping Diameter to Air-source Outdoor Units (Brazed)
High Pressure Low Pressure to 72,000 Btu/h In.(mm) 5/8 (15.88) 3/4 (19.05)
73,000 to 108,000 Btu/h In.(mm) 3/4 (19.05) 7/8 (22.2)
109,000 to 126,000 Btu/h In.(mm) 3/4 (19.05) 1-1/8 (28.58)
127,000 to 192,000 Btu/h In.(mm) 7/8 (22.2) 1-1/8 (28.58)
193,000 to 216,000 Btu/h In.(mm) 1-1/8 (28.58) 1-1/8 (28.58)
217,000 to 240,000 Btu/h In.(mm) 1-1/8 (28.58) 1-3/8 (34.93)
Refrigerant Piping Diameter to Water-source Units (Brazed)
High Pressure Low Pressure to 72,000 Btu/h In.(mm) 5/8 (15.88) 3/4 (19.05)
73,000 to 108,000 Btu/h In.(mm) 3/4 (19.05) 7/8 (22.2)
109,000 to 126,000 Btu/h In.(mm) 3/4 (19.05) 1-1/8 (28.58)
127,000 to 192,000 Btu/h In.(mm) 7/8 (22.2) 1-1/8 (28.58)
193,000 to 240,000 Btu/h In.(mm) 1-1/8 (28.58) 1-1/8 (28.58)
Refrigerant Piping Diameter to Sub BC Controller (Brazed)
Liquid High Pressure
Low Pressure to 72,000 Btu/h In.(mm) 3/8 (9.52)
5/8 (15.88)
3/4 (19.05)
73,000 to 108,000 Btu/h In.(mm) 3/8 (9.52)
3/4 (19.05) 7/8 (22.2)
109,000 to 126,000 Btu/h In.(mm) 1/2 (12.7)
3/4 (19.05)
1-1/8 (28.58)
Field Drain Pipe Size In.(mm) 1-1/4 (32)
Refrigerant R410A
Connectable Outdoor Unit
PURY-P-T(S)K/LMU
PURY-P-Y(S)K/LMU
PURY-HP-T(S)KMU
PURY-HP-Y(S)KMU
PQRY-P-T(S)H/LMU
PQRY-P-Y(S)H/LMU
Main BC Controller: CMB-P1013NU-GA1
NOTES:
1. Use Single BC Controller when R2-Series unit capacity is 120,000 Btu/h or less.
2. Use the Reducer (standard accessory) when the indoor unit capacity is 18,000 Btu/h or less.
3. Use Ball Valves to isolate individual branches (recommended).
4. Use Joint Pipe to combine branches when connected indoor unit capacity on a single branch exceeds 54,000 Btu/h.
B65 0057 Relocate Maintenance Facilities, Sandy Hook Contract# 106806-S-007 (Prime Contract P17PC00406)
Specifications are subject to change without notice. © 2018 Mitsubishi Electric US, Inc.
Toll Free: 800-433-4822 www.mehvac.com
Model: CMB-P1013NU-GA1 – DIMENSIONS
Form# CMB-P1013NU-GA1 - 201805
Z
D et ai l o f X s ec tio n D et ai l o f Y s ec tio n
D et ai l o f Z s ec tio n
D ra in h os e
I.D .3
2( 1-
1/ 4"
(A cc es so ry
B an d( A cc es so ry
In do or u ni t m od el
(N ot e 5)
P1 or le ss :ø
6.
(1 /4
Br az ed
P1 ov er
:ø 9.
(3
/8
Br az ed
In do or u ni t m od el
(N ot e 5)
P1 or le ss :ø
.7
(1 /2
Br az ed
P1
.8 8(
5/ 8)
<B ra ze d>
C on ne ct io n pi pe o f in do or u ni t(G as
C on ne ct io n pi pe o f in do or u ni t(L iq ui d)
C on ne ct io n pi pe o f
S U
B B
C C
O N
TR
O
LL
E
R
(L ow p re ss ur e)
C on ne ct io n pi pe o f
S U
B B
C C
O N
TR
O
LL
E
R (L iq ui d)
C on ne ct io n pi pe o f
S U
B B
C C
O N
TR
O
LL
(H h pr es su re
<A cc es so rie s>
Re fri ge ra nt
<L ow p re ss ur e> co nn . p ipe
·1 pc
Re fri ge ra nt <H igh p re ss ur e> co nn
. p ipe
2p cs
Dr ain h os e
I.D .3
2( 1-
1/ 4"
·1 pc
Ho se b an d·
1p c.
Tie b an d·
1p c.
No te
1.
Su sp en sio n bo lt( ø1 0)
,w as he r(M
),a nd n ut (M p pa re in th e fie ld.
.Ta ke n ot ice o f s er vic e sp ac e as fo llo ws
Pl ea se g ive a tte nt ion n ot to o cc up y s er vic sp ac e by le ttin g du cts a nd p ipe s t hr ou gh
.P lea se ta ke se rv ice sp ac e fo r c on ne cti on p ipe o f S
UB
B C
CO
NT
RO
LL
ER
.In sta ll t his p ro du ct in a loc at ion w he re n ois e
(re fri ge ra nt n ois m itte d by th e un it w ill no t d ist ur b th e ne igh bo rs
Fo r u se in q uie t e nv iro m en ts wi th lo w ba ck gr ou nd n ois e, po sit ion th
BC
C
ON
TR
OL
LE
R at le as t 5 m a wa y f ro m a ny in do or u nit s.)
.R ef er to th e
In sta lla tio n M an ua l fo r r ef rig er an t p ipi ng d iam et er si he n co nn ec tin g plu ra l in do or u nit s w ith b ra nc h.
P
6~ P
4:
ø2 8.
(1
-1 /8
B ra d>
C ne ct io n pi pe o f o ut do or u ni t p re ss ur e)
To ta l c ap ac ity o f i nd oo r u ni t at
S U
B B
C C
O N
TR
O
LL
E
R P or le ss ø9 .5
2( 3/
8) <B ra ze d> P
.7
(1 /2
B ra ze d> (u se a tta ch m en t p ip e of
S U
B B
C C
O N
TR
O
LL
E
R
To ta l c ap ac ity o f i nd oo r u ni t at
S U
B B
C C
O N
TR
O
LL
E
R P o r l es s :ø
.0
5( 3/
4) <B ra ze d> (u se a tta ch m en t p ip e of
S U
B B
C C
O N
TR
O
LL
E
R
P
~P
:ø
.2
(7 /8
B ra ze d> P
.5
8( 1-
1/ 8)
<B ra ze d>
(u se a tta ch m en t p ip e of S
U B
B C
C O
N
TR
O
LL
E R
To ta l c ap ac ity o f i nd oo r u ni t at
S U
B B
C C
O N
TR
O
LL
E
R P o r l es s :ø
.8
8( 5/
8) <B ra ze d> (u se a tta ch m en t p ip e of
S U
B B
C C
O N
TR
O
LL
E
R
P o ve r :ø
.0
5( 3/
4) <B ra ze d>
C on tro l b ox
X Y
(Lifting bolt pitch)
(L ift in g bo lt pi tc h)
C ut tin g po in t
C ut tin g po in t
(In do or u ni t M od el
:P o ve r)
(In do or u ni t M od el
:P o r l es s)
B A 9
0(
-7
/1 6)
CM
B- P1
6N
U-
GA
0(
-3 /8
0(
-9 /3
2)
0(
-9 /1
6)
CM
B-
P1
3N U-
GA
CM
B-
P1
NU
-G
A1
CM
B- P1
0N
U-
GA
(3 -9
/1 6)
(1 -1
3/
(1-3/32)
(2-5/16)
(2 -3
/8
(25-17/32)
(10-1/4)
(11-13/32)
(2 -3
/8
(7 -7
/8
(3
(5-1/8)(4-1/16) (9-25/32)
(5-1/8)(3-5/32) (9-31/32)
(5 -1
/8
(2 9/
(4 5-
/3
2)
(4 3-
/3
2)
(15-9/32)
(17-23/32)
(2-25/32) (10-9/16)
(8-9/32) (4-1/16)
(2 -5
/8
(5 -1
/1 6)
(2 -1
5/
(3 -9
/1 6)
(1-1/4)
(1/2)
(1-3/16)
(9 /1
6)
(N ot e 2,
3) A cc es s do or
0□
S er vi ce sp ac e
(7 -7
/8
(7 -7
/8
(9-27/32)(27-9/16)
(7 -7
/8
(1 7-
/3
2) ø31
103 130
(2
-3 /8
A
=B
(2
-3 /8
A
=B
25380
(700)
(2
P
4~ P
4:
ø2 8.
(1
-1 /8
B ra ze d> (u se a tta ch m en t p ip
e) P
4~
P
2:
ø2
2.
2(
7/ 8)
<B ra ze d>
C on ne ct io n pi pe o f o ut do or u ni t(H ig h pr es su
P
6:
ø1
9.
(3 /4
B ra ze d> (u se a tta ch m en t p ip e)
S ec on da ry dr ai n
O
.D .3
2( 1-
1/ 4"
P rim ar y dr ai n pi pe O
.D .3
2( 1-
1/ 4"
Units: mm (in.)
B65 0057 Relocate Maintenance Facilities, Sandy Hook Contract# 106806-S-007 (Prime Contract P17PC00406)
Specifications are subject to change without notice. © 2018 Mitsubishi Electric US, Inc.
System Reference: Date:
SAMPLE IMAGE FOR REFERENCE
ACCESSORIES:
□ Joint Kit..........................................................................................CMY-R160-J1
□ Branch Joint (T-Branch)...........................................................CMY-Y102SS-G2
□ Condensate Pump (BlueDiamond)…….................................................X87-721
□ Condensate Pump (Sauermann)…........................................……...SI3100-230
□ Ball Valve (3/8” SAE Brazed)……......................................................BV38BBSI
□ Ball Valve (5/8” SAE Brazed)…….......................................................BV58BBSI
SPECIFICATIONS:
Indoor Unit Capacity Connectable To 1 Branch Btu/h 54,000
Number Of Branches 8
Electrical Requirements
Electrical Power Requirements 208 / 230V, 1 phase, 60Hz
Minimum Circuit Ampacity (MCA) A 0.64/0.58
Power Input (208 / 230V)
Cooling kW
0.106
Heating 0.053
Current Input (208 / 230V)
Cooling A
0.51 / 0.46
Heating 0.25 / 0.23
External Dimensions In.(mm) 11-3/16 x 25-17/32 x 17-1/32 (284 x 648 x 432)
Net Weight Lbs.(kg) 82 (37)
External Finish Galvanized steel plate
Refrigerant Piping Diameter to Indoor Unit (Brazed)
Liquid Gas less than 18,000 Btu/h In.(mm) 1/4 (6.35) 1/2 (12.7)
18,000 to 54,000 Btu/h In.(mm) 3/8 (9.52) 5/8 (15.88)
54,000 to 72,000 Btu/h In.(mm) 3/8 (9.52) 3/4 (19.05) greater than 72,000 Btu/h In.(mm) 3/8 (9.52) 7/8 (22.2)
Refrigerant Piping Diameter to Sub BC Controller (Brazed)
Liquid High Pressure
Low Pressure to 72,000 Btu/h In.(mm) 3/8 (9.52)
5/8 (15.88)
3/4 (19.05)
73,000 to 108,000 Btu/h In.(mm) 3/8 (9.52)
3/4 (19.05) 7/8 (22.2)
109,000 to 126,000 Btu/h In.(mm) 1/2 (12.7)
3/4 (19.05)
1-1/8 (28.58)
Field Drain Pipe Size In.(mm) 1-1/4 (32)
Refrigerant R410A
Sub BC Controller: CMB-P108NU-GB1
NOTES:
1. Use the Reducer (standard accessory) when the indoor unit capacity is 18,000 Btu/h or less.
2. Use Ball Valves to isolate individual branches (recommended).
3. Use Joint Pipe to combine branches when connected indoor unit capacity on a single branch exceeds 54,000 Btu/h.
B65 0057 Relocate Maintenance Facilities, Sandy Hook Contract# 106806-S-007 (Prime Contract P17PC00406)
Specifications are subject to change without notice. © 2018 Mitsubishi Electric US, Inc.
Toll Free: 800-433-4822 www.mehvac.com
Model: CMB-P108NU-GB1 – DIMENSIONS
Form# CMB-P108NU-GB1 - 201805
Z
D et ai l o f X s ec tio n D et ai l o f Y s ec tio n
D et ai l o f Z s ec tio n
D ra in h os e
I.D .3
2( 1-
1/ 4"
(A cc es so ry
)B an d( A cc es so ry
In do or u ni t m od el
(N ot e 5)
P o r l es s
:ø 6.
(1
/4
B ra ze d>
P o ve r :ø
9.
(3 /8
B ra ze d>
In do or u ni t m od el
(N ot e 5)
P o r l es s
:ø
.7 (1
/2
B ra ze d>
P o ve r :ø
.8
8( 5/
8) <B ra ze d>
Y
To ta l c ap ac ity o f i nd oo r u ni ts a t S U
B B
C C
O N
TR
O
LL
E
R P o r l es s :ø
.0
5( 3/
4) <B ra ze d> (u se a tta ch m en t p ip
e) P
~P
:ø
.2 (7
/8
B ra ze d>
P
.5 8(
1- 1/
8) <B ra ze d> (u se a tta ch m en t p ip e)
To ta l c ap ac ity o f i nd oo r u ni ts a t S U
B B
C C
O N
TR
O
LL
E
R P o r l es s :ø
.8
8( 5/
8) <B ra ze d> (u se a tta ch m en t p ip
e) P o ve r
:ø
.0 5(
3/ 4)
<B ra ze d>
To ta l c ap ac ity o f i nd oo r u ni ts a t S U
B
BC
C O
N
TR
O
LL
ER
P1 o r l es s :
ø9
.5 2(
3/ 8)
<B ra ze d>
P1 o ve r :ø
.7
(1 /2
Br az ed us e at ta ch m en t p ip e)
<A cc es so rie s>
Re fri ge ra nt
<L ow p re ss ur e> co nn . p ipe
··4 pc s.
Re fri ge ra nt <H igh p re ss ur e> co nn
. p ipe
·2 pc s.
Re fri ge ra nt
<L iqu id> co nn . p ipe
··2 pc s.
Dr ain h os e
I.D .3
2( 1-
1/ 4"
··1 pc
Ho se b an d·
·1 pc
Tie b an d·
·1 pc
No te
1.
Su sp en sio n bo lt( ø1 0)
,w as he r(M
),a nd n ut (M p pa re in th e fie ld.
.Ta ke n ot ice o f s er vic e sp ac e as fo llo ws
Pl ea se g ive a tte nt ion n ot to o cc up y s er vic s pa ce b y l et tin g du cts a nd p ipe s t hr ou gh
.C an
't u se si ng len es s.( M
AI
N
BC
C
ON
TR
OL
LE
R is ne ce ss ar y.)
.In sta ll t his p ro du ct in a loc at ion w he re n ois e (re fri ge ra nt n ois m itte d by th e un it w ill no t d ist ur b th e ne igh bo rs
Fo r u se in q uie t e nv iro m en ts wi th lo w ba ck gr ou nd n ois e, po sit ion t
B
C
CO
NT
RO
LL
ER
a t le as t 5 m a wa y f ro m a ny in do or u nit s.)
.R ef er to th e
In sta lla tio n M an ua l fo r r ef rig er an t p ipi ng d iam et er si n co nn ec tin g plu ra l in do or u nit s w ith b ra nc h.
ne ct io n pi pe o f M
A
IN
B C
C O
N
TR
O
LL
E R
(L iq ui d) ne ct io n pi pe o f M
A
IN
B C
C O
N
TR
O
LL
(H h pr es su re
C on ne ct io n pi pe o f M
A
IN
B C
C O
N
TR
O
LL
p re ss ur e )
C on tro l b ox
(Lifting bolt pitch)
(L ift in g bo lt pi tc
h) C on ne ct io n pi pe o f in do or u ni t(L iq ui d)
C on ne ct io n pi pe o f in do or u ni t(G as
X
C ut tin g po in t
C ut tin g po in t
(In do or u ni t M od el
:P o ve r)
(In do or u ni t M od el
:P o r l es s)
A B
CM
B-
P1
NU
-G
B1
CM
B- P1
NU
-G B1
0( 7-
3/
0(
-9 /1
6)
P rim ar y dr ai n
O .D
.3 2(
1- 1/
4"
(1-1/4)
(1/2)
(1-3/16)
(9 /1
6)
(3 -9
/1 6)
(1 -1
3/
(1-3/32)
(2-5/16)
(2 -3
/8
(5-1/16)
(10-1/16)
(11-3/16)
(2 -3
/8
(7 -7
/8
(3
(5-1/8)(4-1/16)
(9-25/32)
(5-1/8)(3-3/32) (7-5/32)
(5 -1
/8
(2 9/
(2 7-
/3
2)
(2 5-
/3
2)
(6-21/32)
(11-3/4)
(14-9/32) (2-25/32)
(1 -2
5/
(N ot e 2)
S er vi ce s pa ce
A cc es s do or
0 □
(7 -7
/8
(9-27/32) (27-9/16)
(7 -7
/8
(1 7-
/3
2) ø31
130 23
60 60
(2 -3
/8
A =B
(2
-3 /8
A
=B
(700)
(2
S ec on da ry d ra in p ip e O
.D .3
2( 1-
1/ 4"
CMB-P104, 108NU-GB1
B65 0057 Relocate Maintenance Facilities, Sandy Hook Contract# 106806-S-007 (Prime Contract P17PC00406)
| Job Name_8: |
| System Reference_8: |
| Date_8: |
| Standard Model_8: Off |
| Seacoast BS Model_8: Off |
| Twinning Kit required_3: On |
| Joint Kit_8: Off |
| BC Controller required_8: On |
| Low Ambient Kit_8: Off |
| SnowHail Guards Kit_8: Off |
| Job Name: |
| System Reference: |
| Date: |
| Joint Kit: Off |
| Branch Joint TBranch: Off |
| Condensate Pump BlueDiamond: Off |
| Ball Valve 38 SAE Brazed: Off |
| Ball Valve 58 SAE Brazed: Off |
| Sub BC Controller: Off |
| Sub BC Controller_2: Off |
| Sub BC Controller_3: Off |
| Job Name_2: |
| System Reference_2: |
| Date_2: |
| Joint Kit_2: Off |
| Condensate Pump Sauermann_2: Off |
| Ball Valve 38 SAE Brazed_2: Off |
| Ball Valve 58 SAE Brazed_2: Off |
File details come from the government source that posted it. Updated .