A06_Drawings_Specifications_2022_ONAQUI_FENCE_REMOVAL.pdf

PDF 3 MB Posted

Attached to
ONAQUI FENCE REMOVAL
Solicitation number
140L3522Q0003
Issued by

View the file

Other files

File Type Posted
IMG_2051_0003.JPG JPG image
IMG_8591_0003.jpg JPG image
IMG_8590_0003.jpg JPG image
Sol_140L3522Q0003_Amd_0003.pdf PDF
IMG_2053_0003.JPG JPG image
IMG_2052_0003.JPG JPG image
Sol_140L3522Q0003_Amd_0002.pdf PDF
Sol_140L3522Q0003_Amd_0001.pdf PDF
B03_DOL_Wage_Determinations.pdf PDF
Sol_140L3522Q0003.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2021 Onaqui Fence Removal General Requirements 01009 - 1

DIVISION 1 SECTION 01009

GENERAL REQUIREMENTS GENERAL INFORMATION AND REQUIREMENTS

PART 1: GENERAL

1.01 SUMMARY:

A. Description of Work: Furnishing labor and equipment to remove up to 7.3 miles of 4-wire (3- barbed and 1 barbless wire) fence on the Onaqui fence project. Period of Performance is 30 calendar days from the date of the contract being awarded. The following generally describes the type and quantity of work.

B. Location: Work under this Contract is in Tooele County, Utah just outside the area of Dugway, Utah. The work location is as shown on the map.

C. Work Data Sheet: Designates the type and quantity of work required at each project location, and dimensions required for typical drawings.

1.02 QUALITY ASSURANCE:

A. Codes and Standards: The work shall comply with codes and standards applicable to each type of work and as listed in the individual sections of these specifications. This Contract incorporates materials, applications, and tests by reference, with the same force and effect as when they were given in full text.

B. Conflict: Where a conflict occurs between reference documents and project specifications, the project specifications shall govern.

1.03 DELIVERY, STORAGE, AND HANDLING:

A. Delivery: The Contractor shall protect products incorporated into the work from damage while in transit from the site including all reusable T-Posts, barbed wire and barbless (smooth) wire, all large and small Easy fence braces and all gate closers. All T-Posts removed must be palletized and banded in quantities 50 and of 200 per pallet. All wire removed must be rolled up individually in rolls at an approximate length of 1,320-foot rolls. All large and small braces must be banded in quantities of 20. All gate closers can be loose. All fence clips and fence stays (if deemed not to be re-usable) will be properly disposed of by the contractor at an approved recycling facility.

01009 - 2

B. Storage: The Contractor shall provide temporary storage facilities for products. Storage shall comply with the government’s instructions. The storage area shall permit access for inspection and handling.

C. Handling: The Contractor shall load and unload products in such a manner that protects them from damage.

1.04 PROJECT/SITE CONDITIONS:

A. Access to the Work: Access to this fence is straight-forward since the fence is located along the county-maintained South Government Creek Road.

The terrain is flat and there are very few rocks. The vegetation is primarily grass and there are not any trees. The entire portion of fence line is easily accessible by a standard 4WD truck or with a 4WD Utility Terrain Vehicle (UTV). Access should occur only at points along the fence line where an existing road or trail parallels or crosses.

B. Environmental Considerations: Driving shall be limited to along the fence line and along existing roads and trails.

1.05 SEQUENCING AND SCHEDULING:

A. Work Schedule: The schedule shall be submitted at the pre-work conference.

When requested, the Contractor shall submit an updated schedule within 3 calendar days.

PART 2: PRODUCTS

2.01 GOVERNMENT FURNISHED PROPERTY

A. Section Includes: Materials to be returned to the Government and their respective location.

B. Location: The Government-furnished property will be returned by the

Contractor and will be made available as follows:

Fence materials previously identified above will be returned to the Bureau of Land Management’s Vernon Field Station. The physical building address is 450 North Silver Sage Road, Vernon, Utah, 84080.

David Fresques is the BLM point of contact and can be reached at

(801)232-7488. An alternate BLM representative is Jared Redington and he can be reached at (801)712-3186. It is absolutely necessary to make arrangements 3 days in advance for access to be allowed into said facility.

01009 - 3

C. Time: Returned property access will be available Monday through Thursday, 8:00 AM to 4:00 PM, except on Federal holidays.

A BLM representative shall be on site during the initial time of unloading materials transported to Vernon Field Station from the Onaqui fence project for quality assurance purposes.

D. Return of Used Government Owned Property: Return all reusable T-Posts, all reusable barbed and barbless (smooth) wire, all large and small fence panels and gate closers accordingly.

E. Loading, Offloading and Transporting Property: The Contractor shall be responsible for providing the necessary material-handling equipment to load and offload materials. The Contractor shall load, secure and safely transport materials from the worksite to Vernon Field Station.

PART 3: PRODUCTS

3.01 MATERIALS:

A. Materials to be Furnished by the Government: Not Applicable

PART 4: EXECUTION

3.01 PROJECT MEETINGS:

A. Pre-Work Conference:

1. A pre-work conference will be held prior to the start of work. The Contractor will be notified in advance of meeting time, date and place.

The purpose will be to review required work, specifications, and fence removal schedule, payroll and payments, and administrative provisions of the Contract.

2. The Contractor, subcontractors and the persons responsible for coordination of the work shall be present at the meeting.

3. The Contractor shall be prepared to summarize and explain procedures planned for the project.

01009 - 4

B. Progress Meetings:

1. Meetings shall be held at the project site, or as determined by the Contracting Officer.

2. Meetings may be called by either the Contracting Officer or the

Contractor. Requests shall state who should attend and include an agenda.

C. Final Inspection:

1. Meetings shall be held at the respective project site.

2. The Contractor shall notify the Contracting Officer in writing at least 3(three) working days before the completion date so the Government can schedule final inspection.

3. The Contractor shall be present during this inspection.

PART 4: MEASUREMENT AND PAYMENT

4.01 METHOD OF MEASUREMENT:

A. Units: Work described in this section will not be measured for payment.

4.02 BASIS OF PAYMENT:

A. Payment: No direct payment for the work described under this section will be made. The Contractor shall include consideration for this item in the bid price for other items of the Contract.

END OF SECTION

2021 Onaqui Fence Removal WIRE FENCES AND GATES 02824 - 1

DIVISION 2 SECTION 02824

SITE CONSTRUCTION WIRE FENCES AND GATES

PART 1: GENERAL

1.1 SUMMARY

A. Section Includes: Removal and transport of used Government property including all reusable T-Posts, barbed and barbless (smooth) wire, all large and small Easy fence braces and all gate closers, to Vernon Field Station. The proper disposal of all fence clips and all fence stays, at an authorized and pre-approved recycling facility, is the responsibility of the contractor. Only a portion (up to 7.3 miles) on the Onaqui fence will be removed as specified and shown on the map.

PART 2: PRODUCTS

2.1 GOVERNMENT-FURNISHED MATERIALS

A. Requirements: See Section 01009 – General Requirements.

PART 3: EXECUTION

3.1 REMOVAL OF EXISTING FENCE

A. Requirements: Furnish equipment required to remove fence and gates.

B. Removal of Existing Fence: Where applicable, remove existing fences

(including T-Posts, wire, large and small fence braces and gate closers) as indicated on the drawings. Disposal of fence clips and fence stays offsite at a proper and approved recycling facility. These specified materials are to be properly banded, palletized, secured and backhauled to the Vernon Field Station fence materials staging area, where they are to be offloaded by the contractor.

3.2 INSTALLATION

A. General: Steel posts shall be carefully removed, banded and placed on pallets, consisting of 50 per bundle and 200 per pallet. The T-Posts are to be loaded, secured transported and unloaded at Vernon Field Station in a pre-determined and clearly identified location. All wire removed must be rolled up individually in rolls at an approximate

02824 - 2 length of 1,320-foot rolls. All large and small fence braces must be banded in quantities of 20. All gate closers can be loose.

C. Driving Posts: Not Applicable.

D. Corner Post, Gate Post, Corner Panel, Brace, End Panel and Stress Panel

Assemblies: Not Applicable

E. Wire: Not Applicable.

F. Gates: Not applicable.

G. Mechanical Gate Closers: Not Applicable.

END OF SECTION

02824 - 3

DATA WORKSHEET

for

SECTION 02824 - WIRE FENCES AND GATES

Type of fence to be removed: 4 Wire (3 Barbed and 1 Barbless)

Type of top wire: Barbed Wire

Type of intermediate wires: Barbed Wire

Type of bottom wire: Barbless Wire

Type of Panels: Steel Fence Panels

Wire Spacing Intervals (total height in parentheses):

D: 10 inches (42 inches)__

C: 8 inches (32 inches)

B: 8 inches (24 inches)

A: 16 inches

Line post spacing (L): 16 ft 6 inches

Type of Gate Stays: Twisted Wire 32” Qty.4 Juniper wood 4’0” Qty. 3 per gate.

Fence line stay spacing (l): two wire stays per rod (16.5 feet)

Length of steel posts (H2): ft inches

Depth of steel posts in ground (h2): _ ft inches

Length of steel posts for Steel Fence Panel Installation: ___ft ____inches

Depth of steel posts for Steel Fence Panel Installation: ___ft ____inches

Number of Mechanical gate closers: ______At Least Two (2)____

Number of Pine Poles for gates: _________Not Applicable ___

BID SCHEDULE

Fence Removal: Onaqui fence project.

BASIS FOR AWARD:

Bids will be received on the Schedule below. No bid will be considered for only a part of the schedule. Award will be made to the lowest responsive, responsible bidder, based on the unit price quoted. Bidders are cautioned, therefore, to be sure that a unit price is shown for each item. Failure to show a unit price for each item may result in rejection of the bid as non-responsive.

Fire Name Total Distance (Miles)

Unit Cost per Mile

Total Amount

Onaqui Remove Fence – up to 5.0 (approximately 26,400 ft.)

Mile

Onaqui Remove Fence – up to 6.0 (approximately 31,680 ft.)

Onaqui Remove Fence – up to 7.3 (approximately 38,544 ft.)

Total Bid Schedule:

Onaqui Complex ESR - Fence Removal

T:\UT\GisData\ut\sl\projects\Fire\ESR\2017\arcprojects\20211019_OnquiComplex_FenceRemoval.mxd

G

G

G

G

G

R 6 WR 7 WR 8 W

T 6 S

T 7 S

T 8 S

112°32'W112°33'W112°34'W112°35'W112°36'W112°37'W112°38'W112°39'W112°40'W112°41'W112°42'W112°43'W112°44'W112°45'W

°18

.5' N

°18

'N

°17 .5'

N

°17 'N

°16

.5' N

°16

'N

°15 .5'

N

°15 'N

°14

.5' N

°14

'N

°13 .5'

N

°13 'N

°12

.5' N

°12

'N

°11 .5'

N

°11 'N

°10

.5' N

°10

'N

°9.

5'N

°9'

N

°8.

5'N

°8'

N

°7.

5'N

°7'

N

°6.

5'N

0 2 4 Miles¯U.S. DEPARTMENT OF THE INTERIOR

BUREAU OF LAND MANAGEMENT

No warranty is made by the Bureau of Land Management as to the accuracy, reliability, or completeness of these data for individual use or aggregate use with other data.

UTAH

G Cattleguard Fence to be removed: 7.3 Miles Existing Fence: 8.4 Miles Drill Seeding

Land Status

BLM

DOD

Private State

Map Created Oct 19, 2021

(when plottted at 8.5" x 11") 1:100,000

West Desert District

Area Enlarged

Pine Post Pine Post

2021_ONAQUI_FENCE_01009_GENERAL_REQUIREMENTS_10-18-2021_DDF
2021_ONAQUI_FENCE_02824_WIRE_FENCES_AND_GATES_10-18-2021
2021_ONAQUI_FENCE_BID_SCHEDULE_10-18-2021_DDF
2021_ONAQUI_COMPLEX_FENCE_REMOVAL_10-19-2021_PANUNTO
2021_FENCE_DRAWINGS
DRAWING_2_PANEL_AND_BRACE
DRAWING_5_FENCE_DRAINAGE_CROSSING

File details come from the government source that posted it. Updated .