A06_Drawings.pdf

PDF 983 KB Posted

Attached to
LOWE_REPLACE TWO AIR HANDLERS
Solicitation number
140P4325R0046
Issued by

About this file

These are HVAC ductwork design drawings for the Lowell National Historical Park, specifically detailing first and second floor HVAC systems and mechanical room configurations. The drawings (H3, H5, and H16) provide technical specifications for existing and proposed mechanical systems, with key notes indicating requirements such as:

  1. Replacing two air handlers in the existing mechanical room, with instructions to connect to all related ducts and pipes. The drawings specify replacing components to meet fire, building codes, and design requirements, including verifying mechanical room dimensions and ensuring proper maintenance clearances. Specific equipment mentioned includes ACU-2 and ACU-4, with detailed routing for supply, return, and exhaust air ducts across multiple floors. Additional notes highlight specific system details like return air filtering for the weave room, cotton fiber considerations, and a separate humidity control system.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

glittle Callout EXISTING MECHNICAL ROOM ABOVE: WORK INCLUDES CONNECTIONS TO ALL RELATED DUCTS AND PIPES.

glittle Callout

NOTE: HUMIDITY PROVIDED BY SEPARATE SYSTEM

glittle

NOTE: RETURN AIR INCLUDES FILTERING FOR WEAVE ROOM COTTON FIBERS

ACU-2

glittle Rectangle glittle Rectangle glittle Callout

ACU-4

glittle Callout

EXISTING MECHNICAL ROOM

REPLACE TWO AIR HANDLERS, AND CONNECT TO ALL RELATED DUCTS AND PIPES.

H16

Callout

WITHIN THE EXISTING MECHANICAL ROOM:

REPLACE TWO AIR HANDLERS AND PROVIDE ALL CONNECTIONS AND COMPONENTS AS NECESSARY TO MEET FIRE, BUILDING CODES, AND DESIGN REQUIREMENTS PER SPECIFICATIONS AND SCOPE OF WORK.

glittle Callout

MECHANICAL ROOM:

VERIFY DIMENSIONS, ALL REPLACEMENT COMPONENTS TO BE INSTALLED WITH MAINTENANCE CLEARANCES PROVIDED.

H3 1st floor ducts
H5 2nd floor ducts
H16 AHU section-plan

File details come from the government source that posted it. Updated .