A06_Drawing_Fiber_Optic_Construction_plan_at_WERO.pdf
PDF 301 KB Posted
- Attached to
- CAJO FIBER OPTIC CONSTRUCTION AT WERO
- Solicitation number
- 140P4221R0028
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P4221R0028.pdf | ||
| Wage_Detremination_Gloucester_County.pdf | ||
| Offerors_Completed_Projects.docx | DOCX document | |
| A04_SOW_Fiber_Optic_Construction_at_WERO.pdf | ||
| References_Worksheet.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MDaugs Line
MDaugs Line
MDaugs Line
MDaugs Line
MDaugs Line
MDaugs Line
MDaugs Line
MDaugs Line
MDaugs Line
MDaugs Text Box 3200' of ug fiber from Hickory Fork Rd to the entrance of Ginny Hill Rd.
MDaugs Line
MDaugs Line
MDaugs Line
MDaugs Line
MDaugs Line
MDaugs Line
MDaugs Line
MDaugs Text Box 2985' of aerial fiber from the entrance of Ginny Hill to the entry gate.
MDaugs Line
MDaugs Line
MDaugs Text Box 1200' of fiber installed into stick pipe sections and laid in the ditchline.
MDaugs Line
MDaugs Line
MDaugs Text Box Vaults with fiber slack installed here.
MDaugs 3x5 Vault
MDaugs 3x5 Vault
MDaugs Line
MDaugs Line
MDaugs Pole Detail 2
MDaugs Text Box Riser up pole and transition into an aerial application.
MDaugs Line
MDaugs Polygonal Line
MDaugs Line
MDaugs Text Box Attach to the side of the house and enter into the building. Install fiber equipment into spare room.
MDaugs Line