A06 - ATT- 8Mobilization Details.pdf

PDF 24 KB Posted

Attached to
72 - Malheur National Forest Picnic Tables
Solicitation number
1240BEQ230051A0001
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

881 -Mobilization/Equipment Moving 1

881 MOBILIZATION / EQUIPMENT MOVING

881.01 Service Required

A. Mobilization of personnel, equipment, and material to the project site.

B. Moving of equipment outside the established work schedule as ordered.

881.02 Performance Standards

A. Make equipment available for inspection before it is used on National Forest System lands.

B. Moving is complete, when the contractor has moved from the present work site to the ordered work site and returned to the previous location.

C. Equipment will be clean and weed free before it arrives on National Forest System lands.

881.03 Location of Work:

As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.

881.04 Measurement:

Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.

A. Mile: Work activity will be measured along the shortest feasible route to the nearest one (1) mile, from the starting location of the move, to the ordered work site.

881 -Mobilization/Equipment Moving 2

881.05 Payment

A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 881 pay items listed in the schedule of items.

Mobilization is complete when all equipment, personnel, and materials are moved to the project site and work has been started. Payment will be full compensation for the work prescribed in this Section.

Pay Item Pay Unit

881(1) Mobilization Lump Sum 881(2) Mobilization Each 881(3) Equipment Moving Miles

881 -Mobilization/Equipment Moving 3

881.06 Acceptable Quality Levels

Description Major Minor

Allowable Defects Required Action

Defect Defect Major Minor Major Minor

Weed free equipment Equipment not weed free. N/A 0 N/A Equipment rejected until it can be made weed free N/A

Ordered Movement of Equipment

Equipment not moved within designated time

N/A X N/A

Reduce unit cost by 5% for 10 days amount of time over designated time

N/A

Equipment meets all state and federal regulations

Does not meet state and federal regulations

N/A 0 N/A

Bring equipment up to state and federal regulations or replace equipment

N/A

Equipment leaks

Equipment leaks in sensitive areas or leaks that are large and not typically inherent in the specific equipment

Small leaks inherent in the specific type of equipment 0 N/A

Replace equipment and restore affected site as directed by the Contracting Officer

Place absorbent pads under equipment when not operating.

* Forests have the option to choose a pay reduction in lieu of rework. However, each Forest must establish a threshold where rework is required and define pay reductions for each defect.

Intent and use: User to establish threshold for the acceptable level of quality.

File details come from the government source that posted it. Updated .