A06 40512685 Afterbay Details Sht2.pdf
PDF 339 KB Posted
- Attached to
- REPAIR AFTERBAY RIVER BOAT LAUNCH RAMP Federal contract opportunity
- Solicitation number
- 140P1421R0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P1421R0001_Amd_0001.pdf | ||
| A06 40512685 Afterbay Site Plan Sht1.pdf | ||
| A06 40512685 Specifications.doc | DOC document | |
| B03 40512685 Wage Determination.pdf | ||
| Sol_140P1421R0001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLASS I RIPRAP EDGE
PROTECTION,
2' X 2' ADJACENT TO
SLAB, (TYPICAL)
8'
6" OF 34" GRAVEL LEVELING COARSE
TO BE SCREEDED TO TOP OF RAILS
SIX (6) W6 x 20 STEEL BEAMS, FABRICATE CROSS MEMBERS
AS REQUIRED TO KEEP PARALLEL
SEE ELEVATION VIEW BELOW
NOTES:
1. FORM PUSH-IN SLAB AT EXISTING BOAT GRADE, CONTRACTOR TO SUBMIT MEANS AND METHODS OF
CONSTRUCTION FOR REVIEW.
2. THE PUSH-IN SECTION SHALL BE CAST ON THE EXISTING RAMP AND ALLOWED TO CURE FOR MINIMUM OF 14 DAYS. SHORTER CURE TIMES MAY BE ALLOWED IF A HIGHER STRENGTH CONCRETE IS USED, IF
APPROVED BY OWNER.
3. THE EXISTING RAMP SHALL BE COVERED WITH A MIN. OF 2" LAYER OF SAND AND 2 LAYERS OF POLYETHYLENE BARRIER PRIOR TO CASTING THE PUSH-IN SECTION TO PROVIDE A SEPARATION AND SLIP
PLANE WHEN PUSHING THE SLAB INTO POSITION.
4. ALL SEPARATE POURS WILL REQUIRE REBAR PLACEMENT AS DESCRIBED IN NOTE 5.
5. JOINING REBAR SHALL BE EPOXIED INTO FIRST SLAB AND EXTENDED A MINIMUM OF 20" INTO SUBSEQUENT SLAB(S). CONTRACTOR MAY CAST TRANSITION SLAB FOR LEVELING THE TWO RAMPS VIA CAST IN PLACE CONCRETE, JOINING REBAR & EPOXY AS NOTED, REBAR MAY BE WELDED TOGETHER UPON
APPROVAL BY OWNER.
6. REINFORCEMENT: TWO(2) MATS CONSISTING OF #4 GRADE 40 REBAR 2' ON CENTER EACH WAY, OFFSET UPPER & LOWER MATS 1', ALLOW 2" OF CONCRETE COVER, EACH BAR SHALL HAVE A 4" HOOK AT
PERIMETER AND TIED TO PERIMETER BARS.
7. CONTRACTOR MAY ELECT TO FABRICATE ANGLE IRON ALONG EDGE OF OUTER STEEL SUPPORT BEAMS TO HELP DIRECT PUSH-IN SLAB DURING INSTALLATION. CONTRACTOR TO PROVIDE TYPE AND NUMBER OF
EQUIPMENT OF SUFFICIENT SIZE TO PUSH SLAB INTO FINAL POSITION.
8. CONTRACTOR IS RESPONSIBLE FOR PROTECTING THE EXISTING BOAT RAMP FROM DAMAGE. ANY
DAMAGE TO EXISTING RAMP WILL BE REPAIRED AT THE CONTRACTOR'S EXPENSE.
9. PROVIDE 2" CLEAR COVER FOR ALL REBAR REINFORCEMENT.
10. PLACE RIPRAP EDGE PROTECTION AT THE SAME GRADE OF PUSH-IN SLAB. KEY IN RIPRAP BY
MECHANICAL TAMPING METHODS TO PROVIDE FLUSH SURFACE.
PUSH-IN CONCRETE SLAB RAMP DETAIL
40'
(TYP).
SECTION VIEW
3"X3" CHAMFER LONG SIDE EDGES
6" OF 34" GRAVEL LEVELING COARSE TO
BE SCREEDED TO TOP OF RAILS
GRADE RIPRAP AT SAME RAMP GRADE
4' BEYOND END OF RAMP
W6 x 20 STEEL BEAMS, FABRICATE CROSS
MEMBERS AS REQUIRED TO KEEP PARALLEL
# 4 @ 24" ON CENTER - SEE
NOTE 6 ABOVE
PUSH-IN CONCRETE SLAB RAMP DETAIL
ELEVATION VIEW
EXISTING BOAT RAMP
MECHANICALLY PLACED CLASS I RIPRAP
10' (typ.)
(1.5" DEPTH)
8"1/2"RADIUS
30°
CONTRACTION CONTROL JOINT DETAIL
SAW CUT CONTROL JOINT
2. SCREED CONCRETE FOLLOWED BY GROOVING THE SURFACE.
1. CONCRETE FOR NEW RAMP IS A 3/4" MINUS; 6-1/2 BAG MIX
WITH A MIN 28 DAY STRENGTH OF 4000 PSI.
NOTE:
SLAB CONTROL JOINT DETAIL
NOTE:
GROOVE DEPTH - 3/4"
R A M
P S
LO
PE
GROOVED SURFACE PLAN
3. SAW CUT CONTRACTION JOINTS AFTER RAMP IS GROOVED.
40' A A'
PLAN VIEW
PLAN VIEW
PLYWOOD BULKHEAD :
LEAVE IN-PLACE.
JOINING REBAR,
SEE NOTE 5
8" THICK
SLAB
1. GROOVING SHALL
MATCH EXISTING BOAT
RAMP, CONFIRM WITH
NATIONAL PARK SERVICE
TRANSITION SPACE BETWEEN
RAMPS TO LEVEL TOGETHER
W/CAST IN PLACE, JOINING REBAR
& EPOXY REQ'D AS NOTED
SLOPE SAME AS EXIST. RAMP
(8-10% ±)
EDGES.
6"x 6" CHAMFER LONG SIDE
12" 21"
2-#4 REBAR CONTINUOUS
THROUGHOUT FOOTING
18"
6"
THICKENED EDGE DETAIL
6" 24"
# 4 @ 12" SPACING
FOR CAST IN PLACE RAMP
BOTH WAYS, SEE NOTE 2.
NOTES
1. THIS DETAIL APPLIES TO ANY TRANSITION PIECES
BETWEEN PUSH-IN-SLAB AND EXIST. RAMP.
CONTINUE THICKENED EDGE FOOTING AROUND
ENTIRE PERIMETER OF CAST-IN-PLACE CONCRETE.
2. EXTEND AND EXPOXY #4 BARS MIN 20" (12"
O.C.) IN EXISTING CONCRETE CONNECTIONS.
PROVIDE EXPANSION JOINT MATERIAL
ALONG COLD JOINT CONNECTIONS.
3. NO CHAMFER ALONG
SIDEWALK/BULKHEAD/EXISTING CONCRETE
CONNECTIONS.
4. PROVIDE 21
2" CLEAR COVER FOR ALL REBAR
REINFORCEMENT.
TRANSITION PIECES
DRAWN BY: DATE:
CHECKED BY: DATE:
APPROVED BY: DATE:
APPROVED BY: DATE: SH
EE
T:
of
APPROVED BY: DATE:
REVISED BY: DATE: Detail Sheet -P. Jagoda 9/18/20
Bighorn Canyon National Recreation Area Afterbay Boat Ramp Extension
P. Jagoda 9/18/20
AutoCAD SHX Text 8"
| Sheets and Views |
| Details |
File details come from the government source that posted it. Updated .