A06_-140L1722Q0031-Section_013300_1.docx
DOCX document 25 KB Posted
- Attached to
- GAOA LSFO IRISH CANYON VAULT TOILET REPL
- Solicitation number
- 140L1722Q0031
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A06_-_140L1722Q0031-Section_033533_1.docx | DOCX document | |
| A06_-_140L1722Q0031-Maps_and_Plans_1.pdf | ||
| A06_-_140L1722Q0031-Section_311000_1.docx | DOCX document | |
| A06_-__140L1722Q0031-Section_033000_1.docx | DOCX document | |
| A06_-_140L1722Q0031-_Section_329200_1.docx | DOCX document | |
| A06__-_140L1722Q0031-_Section_034150_1.docx | DOCX document | |
| A04_-140L1722Q0031-_Bid_Schedule_1.pdf | ||
| A06_-_140L1722Q0031-_Section_129300_00_1.docx | DOCX document | |
| A06_-_140L1722Q0031-Section_013201_1.docx | DOCX document | |
| A06_-_140L1722Q0031_-_Section_010090_1.docx | DOCX document | |
| A06_-_140L1722Q0031-Section_033550_1.docx | DOCX document | |
| A06_-__140L1722Q0031-Section_312000_1.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bureau of Land Management - Colorado State Office SECTION 01 33 00 Submittal Procedures
GENERAL
SUBMITTALS
Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only.
INFORMATION ONLY SUBMITTALS
Normally submittals for information only will not be returned. Approval of the Contracting Officer's Representative is not required on information only submittals. The Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract.
This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications; will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work; and does not relieve the Contractor of the requirement to furnish samples for testing by the Government laboratory or for check testing by the Government in those instances where the technical specifications so prescribe.
GOVERNMENT APPROVING AUTHORITY
The Contracting Officer's Representative will:
Note the date on which the submittal was received.
Review submittals for approval within 10 days of receipt.
Identify returned submittals with one of the actions defined in paragraph REVIEW NOTATIONS and with markings appropriate for action indicated.
Upon completion of review of submittals requiring Government approval, one copy of the submittal will be retained by the Contracting Officer's Representative and one copy of the submittal will be returned to the Contractor.
Review Notations Submittals will be returned to the Contractor with the following notations:
Submittals marked "approved" or "accepted" authorize the Contractor to proceed with the work covered.
Submittals marked "approved as noted" or "approved, except as noted, resubmittal not required," authorize the Contractor to proceed with the work covered provided the Contractor takes no exception to the corrections.
Submittals marked "not approved" or "disapproved," or "revise and resubmit," indicate noncompliance with the contract requirements or design concept, or that submittal is incomplete. Resubmit with
| 2022-04-25 | Submittal Procedures |
| LSFO - IRISH CANYON RESTROOM REPLACEMENT | 01 33 00- 1 of 6 |