A06_-_140L1722Q0023_-02339_Watering_1.pdf
PDF 68 KB Posted
- Attached to
- SKINNER TRAIL RESURFACING Federal contract opportunity
- Solicitation number
- 140L1722Q0023
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A06_-_140L1722Q0023_-01009_General_Info_1.pdf | ||
| A04_-_140L1722Q0023_-Schedule_of_Items_1.pdf | ||
| A06_-_140L1722Q0023_-Plan_View-First_Section_1.pdf | ||
| A06_-_140L1722Q0023_-02730_Aggregate_1.pdf | ||
| A06_-_140L1722Q0023_-_Title_Sheet_1.pdf | ||
| A06_-_140L1722Q0023_-02640_CMP_1.pdf | ||
| A06_-_140L1722Q0023_-Plan_View-End_Section_1.pdf | ||
| B04_-_140L1722Q0023_-TPEC_Evaluation_1.pdf | ||
| A06_-_140L1722Q0023_-02315_Ex___Fill_1.pdf | ||
| A06_-_140L1722Q0023_-_Plan_View-Middle_Section_1.pdf | ||
| A06_-_140L1722Q0023_-Details_and_Sections_1.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WATERING
Skinner Trail Resurfacing 5/22
02339 - 1
SECTION 02339
WATERING
PART 1: GENERAL
1.1 SUMMARY
A. Section Includes: Distributing and applying water required for compaction of trail aggregate
1.2 PROJECT/SITE CONDITIONS
A. Water Source: Contractor shall furnish the water source for the work.
PART 2: PRODUCTS
2.1 MATERIALS
A. Water: Shall be clean and free from harmful amounts of oils, acids, alkalis, salts and organic materials. Potable water is acceptable.
2.2 EQUIPMENT
A. Requirements: Provide necessary pumping equipment, piping, tanks, water trucks, water trailers, and measuring devices if applicable.
Water trucks and trailers shall be equipped with a spray bar of adequate capacity and design to ensure uniform application of water.
PART 3: EXECUTION
3.1 APPLICATION
A. Water Application: Water shall be applied by sprinkling to the borrow area and along the trail. Water shall be applied uniformly along the trail over the trail mix aggregate as needed to achieve the desired compaction as stated in Section 02315.
PART 4: MEASUREMENT AND PAYMENT
4.1 METHOD OF MEASUREMENT
A. Units: The work described in this section will not be measured for payment.
4.2 BASIS OF PAYMENT
A. Payment: No direct payment for the work described under this section will be made. Consideration for this item shall be included in the bid price for other items of the Contract.
END OF SECTION