GENERAL INFORMATION AND REQUIREMENTS

Canyon Pintado Fence Improvements 11/01

01009 - 1

SECTION 01009

PART 1: GENERAL

1.1 SUMMARY

A. Description of Work: Furnishing labor, equipment, supplies, and materials, to remove wood poles from existing wood posts and place new poles onto the existing posts. Remove barbed wire fence and install new wood post and pole fence along the alignment of the removed barbed wire fence. Construct 2 concrete slab with privacy fencing for placement of existing metal trash dumpsters.

B. Location: Work under this Contract is in Rio Blanco County, Colorado. The work locations are shown on the drawings.

1.2 REFERENCES

A. Referenced Specifications/Standards with Abbreviations and/or Acronyms:

Wherever the following acronyms are used in these specifications or on the drawings, they are to be construed the same as the respective expressions represented. Copies of the referenced specifications/standards referred to herein may be procured by the Contractor, from the following:

AASHTO American Association of State Highway and Transportation

Officials 444 North Capitol Street, N.W., Suite 249 Washington, DC 20001

AASHTO M 147-65 Materials for Aggregate and Soil

Aggregate Subbase, Base and Surface Courses (R1993)

ACI American Concrete Institute

P.O. Box 19150 Detroit, MI 48219

ACI 305R-91 Hot Weather Concreting ACI 306R-88 Cold Weather Concreting ACI 347R-94 Guide to Formwork for Concrete

ASTM American Society for Testing and Materials 100 Barr Harbor Dr.

West Conshohocken PA 19428-2959

ASTM A 615/A 615M REV B-95 Deformed and Plain Billet Steel Bars for Concrete Reinforcement ASTM C 143 REV A-90 Test Methods for Slump of Hydraulic Cement

Concrete ASTM C 260-95 Air-Entraining Admixtures for Concrete ASTM C 309-95 Liquid Membrane-Forming Compounds for

Curing Concrete

01009 - 2

1.3 SUBMITTALS

A. Submittals: Submittals include the contractors work schedule and ready mix concrete batch tickets.

1.4 QUALITY ASSURANCE

A. Codes and Standards: The work shall comply with codes and standards applicable to each type of work and as listed in the individual sections of these specifications. This Contract incorporates materials, applications, and tests by reference, with the same force and effect as when they were given in full text.

B. Conflict: Where a conflict occurs between reference documents and project specifications, the project specifications shall govern.

C. Materials: Prior to ordering materials, verify dimensions and quantities of items required to complete the proposed work.

1.5 DELIVERY, STORAGE, AND HANDLING

A. Delivery: Protect products incorporated into the work from damage while in transit to the site.

B. Handling: Load and unload products protecting them from damage.

1.6 PROJECT/SITE CONDITIONS

A. Access to the Work: As per Federal Acquisitions Regulations Clause 52.236-10. Access to work locations within the sites shall be allowed on existing roads only.

B. Environmental Considerations: As per Federal Acquisitions Regulations

Clause 52.236-9 and 52.236-10.

1.7 SEQUENCING AND SCHEDULING

A. Work Schedule: The schedule shall be submitted within 5 calendar days after signing the Notice to Proceed and as per Federal Acquisitions Regulations Clause 52.236-15. When requested, submit an updated schedule. At a minimum, the schedule will state the estimated timeframes for the work to be performed at each site, see 1.7 B below for additional information.

B. The wood pole fence(s) shall remain functional at the end of each day.

Removal of existing poles and installation of new poles shall be performed in conjunction with one another to prevent livestock from entering the site(s). The construction of the new post and pole fence shall begin immediately after the removal of the barbed wire fence and completed as quickly as possible.

01009 - 3

PART 2: PRODUCTS

(There are no applicable requirements.)

PART 3: EXECUTION

3.1 PROJECT MEETINGS

A. Pre-Work Conference:

1. Will be held prior to the start of work. The Contractor will be notified in advance of meeting time, date and place. The purpose will be to review required work, project drawings and specifications, construction schedules, payroll and payments, and administrative provisions of the Contract.

2. The Contractor, subcontractors and the persons responsible for coordination of the work shall be present at the meeting.

B. Progress Meetings: If applicable, shall be held at the project site, or as determined by the Contracting Officer. Meetings may be called by either the Contracting Officer or the Contractor. Request shall state who should attend and include an agenda.

C. Final Inspection: Shall be held at the project site, or as determined by the Contracting Officer. Notify the Contracting Officer in writing at least 5 working days before the completion date so the Government can schedule final inspection.

3.2 PREPARATION

A. Work Layout: Work locations area as shown on the drawings and shall be limited to the existing fence lines, parking areas, and trails.

B. Work Limits and Control Points: Will be established by the Contracting

Officer.

3.3 DISPOSAL OF DEBRIS

A. Requirements: Items or debris collected from fence removal shall become the property of the Contractor. Disposal of materials in a legal manner and payment of fees required is the Contractor's responsibility.

PART 4: MEASUREMENT AND PAYMENT

4.1 METHOD OF MEASUREMENT

A. Units: The work described in this section will not be measured for payment.

4.2 BASIS OF PAYMENT

A. Payment: No direct payment for the work described under this section will be made. Consideration for this item shall be included in the bid price for other items of the Contract.

END OF SECTION