A05 - SOW_CSU Fire Suppression Monitoring.pdf

PDF 114 KB Posted

Attached to
Fire Suppression Monitoring and Pump Inspections
Solicitation number
75H70926BAO-012-RFQ
Issued by

About this file

This Statement of Work (SOW) details annual fire protection system inspections for the Crow Service Unit's healthcare facilities in Montana. The contract covers comprehensive fire safety services at three locations: Crow/Northern Cheyenne Hospital, Pryor Health Clinic, and Lodge Grass Health Clinic. Specific requirements include one annual and three quarterly fire system inspections, fire pump and sprinkler testing, annual fire extinguisher inspections for 67 units, semi-annual kitchen hood suppression system certification, live fire training for 354 individuals, annual backflow testing, and fire alarm monitoring services. The contractor must have technicians certified to NICET level two in fire alarm, fire sprinkler, and clean agent systems. The period of performance is from 02/01/2026 to 01/31/2027, with inspection reports due within one week of service completion. Contractors will be escorted by facilities staff and do not require security clearances.

View the file

Other files

File Type Posted
75H70926BAO-021-RFQ.pdf PDF
Wage Determination.txt TXT text file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW)

1. PROJECT TITLE: CSU Annual Fire Sprinkler, Fire Alarm, Monitoring and Pump

Inspection

2. BACKGROUND/PURPOSE: The contractor shall perform annual inspection on all fire sprinkler, fire alarm systems and jockey pumps at the Crow Service Unit. Sites will include Crow/Northern Cheyenne Hospital, Pryor Health Clinic and Lodge Grass Health Clinic.

SCOPE: Inspection for the Automatic Fire Protection System at the Crow Hospital, Pryor Health Clinic and Lodge Grass Health Clinic. The survey will include:

• One Annual Inspection-Survey and Fire Pump Test to include testing the antifreeze solution and appropriate valves.

• Three (3) Quarterly Inspection—Testing the Supervisory Switches and Alarms at each location.

• One complete Annual inspection of the Fire Alarm System as outlined in NFPA-

72. Testing shall include fire alarm initiating devices, notification devises, fire alarm control panel functions, and any auxiliary functions that may be connected to the FACP Written documentation of the testing. Documentation shall be provided to owner.

• Ancillary Devices to be tested: Remote Annunciator, Kitchen Hood (Ansul Units), Digital Dialer (check out).

• Annual Fire Extinguisher Inspections and certification, sixty-seven (67)

• Semi-Annual Inspection and Certification of Kitchen Hood Fire Suppression

System (1)

• Hand on live fire training for 354 individuals.

• Fire Sprinkler Inspection and Fire Sprinkler Pump Test for Pryor Clinic, Lodge

Grass Clinic and Crow Northern Cheyenne Hospital.

• Annual back flow testing for each location (3)

• Fire Alarm Monitoring Services for 3 locations.

Excluded Services: Alarm Maintenance, Smoke Detector cleaning and repair of any issues uncovered during the inspection.

3. APPLICABLE DOCUMENTS: All technicians should be certified to a level two in

NICET (National Institute for Certification in Engineering Technologies) in the areas of fire alarm, fire sprinkler and clean agent (kitchen suppression and hood, Novec1230, etc.)

4. TASKS: The contractor shall provide safety inspections for dry sprinkler and wet sprinkler systems. It is the responsibility of the contractor to determine if the systems are in safe operating condition. The contracting officer representative (COR) will coordinate and make the necessary arrangements for any appointments.

5. DELIVERABLES AND DELIVERY SCHEDULE: The contractor shall provide the inspection report to the COR within a week of performing services. All inspection checks will be performed during normal business hours of coverage unless requested or approved by the COR or his/her designee.

6. PLACE OF PERFORMANCE:

a. Crow/Northern Cheyenne Hospital, Crow Agency, MT 59022

b. Lodge Grass Health Clinic, Lodge Grass, MT 59050

c. Pryor Health Clinic, Pryor MT, 59066

7. PERIOD OF PERFORMANCE: 02/01/2026-01/31/2027

8. SECURITY: Contractor does not need any security clearances. Contractor will be escorted while in buildings by security cleared facilities staff.