This is a Statement of Work for the replacement and repair of a corrugated metal shade cover roof at the Imperial National Wildlife Refuge Automotive Repair Shop located at 12812 N. Wildlife Way, Yuma, Arizona 85365. The existing shade structure sustained storm damage requiring repair and reinforcement to restore safe and reliable use.
The contractor must be licensed, bonded, and insured in Arizona with experience in structural steel and metal roofing installation/repair, including welding, fabrication, and erection of shade structures. Work shall be completed within 30 days after receipt of order (ARO), scheduled Monday through Thursday, 7:00 a.m. to 4:30 p.m., with after-hours emergency contact information required. The scope includes replacing one damaged 12'4" 3"x3" steel post at the northwest corner with proper anchoring, alignment, and paint matching; reusing structurally sound existing posts; removing and disposing of damaged roofing materials and steel members; replacing all existing 7-inch I-beams with new structural steel of equal or greater load rating; installing new corrugated metal roofing panels matching or exceeding existing specifications; performing all necessary welding and structural alignment; and applying corrosion protection and paint to all new steel components. All work must comply with applicable building codes, OSHA safety standards, and accepted industry practices. The contractor shall provide all labor, materials, tools, equipment, lifting devices, welding equipment, fasteners, coatings, and disposal services. Government shall provide site access and coordination support. Deliverables include product data, paint specifications, installation methodology, site-specific safety plan, proof of licensure and insurance, equipment operation plans if applicable, demolition and installation photos, material certifications, warranty documentation, and final inspection sign-off. Government acceptance is contingent upon compliance with codes, proper installation, quality workmanship, timely completion, and debris removal. The Technical Coordinator is Matthew Miles, Facilities Operations Supervisor, (928) 276-5024, matthew_miles@fws.gov.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140FC126R0024.pdf | ||
| A04_Bid_Schedule.pdf | ||
| B03_General_Decision.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work Replacement and Repair of Corrugated Metal Shade Cover Roofing Imperial National Wildlife Refuge Automotive Repair Shop PR Number:
1. General
1.1 Imperial National Wildlife Refuge-12812 N. Wildlife Way, Yuma, AZ 85365. Replacement and repair of storm-damaged corrugated metal shade cover located at the automotive repair shop.
1.2 The existing shade structure sustained storm damage resulting in compromised structural integrity and loss of functional weather protection for government equipment and operations. Repair and reinforcement are required to restore safe and reliable use.
1.3 Contractor Qualifications: Contractor shall be licensed, bonded, and insured in the State of Arizona and experienced in structural steel and metal roofing installation/repair, including welding, fabrication, and erection of shade structures or similar systems.
2. Place of Performance and Period of Performance
2.1 Work site is located at Imperial NWR, 12812 N. Wildlife Way, Yuma, AZ 85365.
2.2 Work shall be scheduled in coordination with the Government and completed within 30 days ARO.
2.3 Normal duty hours are Monday through Thursday, 7:00 a.m. -4:30 p.m. Contractor shall provide after-hours emergency contact information.
2.4 Non-duty hours include weeknights, weekends, and Government holidays (New Year's Day, Martin Luther King Jr.'s Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran's Day, Thanksgiving Day, Christmas Day).
3. Scope
3.1 Contractor shall furnish all labor, materials, equipment, and supervision necessary to remove, repair, and replace components of the storm-damaged shade cover, including but not limited to:
• Replace one (1) damaged 12'4" 3"x3" steel post at the northwest corner; new post shall be properly anchored, aligned, and painted to match existing structure
• Reuse all remaining structurally sound existing posts
• Remove and dispose of all damaged roofing materials, steel members, and associated debris
• Replace all existing 7-inch I-beams with new structural steel members of equal or greater load rating
• Install new corrugated metal roofing panels to match or exceed existing gauge and profile
• Ensure proper fastening, overlapping, and weather-tight installation of roofing panels
• Perform all necessary welding, cutting, grinding, and structural alignment to ensure integrity of the shade structure
• Apply corrosion protection and paint to all new steel components to match existing finish
• Ensure structure is plumb, level, and capable of withstanding typical regional wind loads
3.2 All work shall comply with applicable building codes, OSHA safety standards, and accepted industry practices for structural steel and roofing systems.
4. Deliverables
4.1 Submittals
• Product data for steel members and roofing materials
• Paint/coating specifications
• Installation methodology (brief description acceptable)
4.2 Safety & Compliance
• Site-specific safety plan (including fall protection if applicable)
• Proof of contractor license, insurance, and bonding
• Equipment operation and lifting plan (if cranes or lifts are used)
4.3 Installation Documentation
• Photos of demolition, installation, and completed work
• Material receipts or certifications (upon request)
4.4 Project Closeout
• Warranty documentation for materials and workmanship
• Final inspection/approval sign-off by Government representative
5. Data Management Plan (DMP)
NIA
6. Government-Furnished Equipment (GFE) / Government- Furnished Information (GFI)
6.1 The Government will provide site access and coordination support.
6.2 Contractor shall provide all labor, materials, tools, equipment, lifting devices, welding equipment, fasteners, coatings, and disposal services required to complete the work.
6.3 Contractor shall coordinate directly with the Government representative to:
• Schedule work at least 48 hours in advance
• Minimize disruption to refuge operations
• Ensure safe work zones around active maintenance areas
7. Evaluation and Acceptance
7.1 Government acceptance is contingent upon:
• Compliance with all applicable codes and safety standards
• Proper installation of structural members and roofing materials
• Quality workmanship including secure connections, welds, and fasteners
• Completion within agreed timeframe
• Removal of all debris and restoration of work area
7.2 Acceptance Criteria
• New steel post is properly installed, aligned, and secured
• All I-beams are replaced and structurally sound
• Roofing panels are securely installed, weather-tight, and properly aligned
• All steel components are coated/painted to prevent corrosion
• Structure is stable, level, and safe for operational use
• Site is clean and free of construction debris
• All required documentation submitted
8. Quality Control / Quality Assurance
8.1 Contractor shall maintain quality control in accordance with accepted structural steel and roofing standards.
All work shall be professional and workmanlike.
8.2 Contractor shall implement QC inspections before, during, and after construction.
Task/Deliverable QC Activity Acceptance Criteria
Pre-work inspection Verify damage and measurements Scope confirmed, materials correct
Material delivery Inspect steel and roofmg No defects, meets specs Structural install Check alignment and welds Plumb, level, secure Roofmg install Inspect fastening and overlap Weather-tight, properly installed Coating/paint Verify coverage and finish Full coverage, matches existing Final inspection Government walkthrough Punch list complete, site clean Documentation Review submitted materials Complete and acceptable
9. Technical Coordinator
9.1 Matthew Miles, Facilities Operations
Supervisor (928) 276-5024 matthew_miles@fws.gov mailto:matthew_miles@fws.gov
| Statement of Work |
| 1. General |
| 2. Place of Performance and Period of Performance |
| 3. Scope |
| 4. Deliverables |
| 4.1 Submittals |
| 4.2 Safety & Compliance |
| 4.3 Installation Documentation |
| 4.4 Project Closeout |
| 5. Data Management Plan (DMP) |
| 6. Government-Furnished Equipment (GFE) / Government-Furnished Information (GFI) |
| 7. Evaluation and Acceptance |
| 7.2 Acceptance Criteria |
8. Quality Control / Quality Assurance