A04_Bid_Schedule.pdf

PDF 93 KB Posted

Attached to
AZ-IMPERIAL NWR-MAINTENANCE SHOP REPAIR
Solicitation number
140FC126R0024
Issued by

About this file

This document is an Amended Bid Schedule for a Firm Fixed Price construction contract located at Imperial National Wildlife Refuge in Yuma, Arizona. The contractor is required to provide all labor, materials, equipment, and supervision for the complete replacement of a 26'x44'x12'4" shade structure unit in accordance with an attached Statement of Work.

The bid schedule is structured as eight line items, all priced on a lump sum basis: Item 0001 covers repair, removal, and replacement of the shade structure; Item 0002 addresses miscellaneous materials; Item 0003 includes personnel costs; Item 0004 accounts for mobilization and demobilization; Item 0005 covers overhead costs; Item 0006 is for insurance; and Item 0007 is for profit. Item 0008 represents the grand total for base plus options. Bidders are required to provide unit prices and total costs for each line item, with all quantities specified as one lump sum unit of measure. The document indicates this is Section B of a larger solicitation package and references an attached Statement of Work for detailed project specifications.

View the file

Other files

File Type Posted
Sol_140FC126R0024.pdf PDF
A04_Statement_of_Work_(SOW).pdf PDF
B03_General_Decision.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1 Amended Bid Schedule

This requirement is for one (1) Firm Fixed Price Construction contract for The contractor shall provide all labor, materials, equipment, and supervision required for the complete replacement of the specified shade structure unit as per the attached Statement of Work (SOW). Location: Imperial National Wildlife Refuge 12812 N Wildlife Way Yuma, Arizona 85365

Item no. Item Description Quan tity

Unit of

Meas ure Unit Price Total

0001 Repair, Remove, Replace 26’x44’x12’4” shade structure

1 LS $ $

0002 Miscellaneous material (detail) 1 LS $ $ 0003 Personnel 1 LS $ $ 0004 Mobilization & Demobilization 1 LS $ $ 0005 Overhead Cost 1 LS $ $ 0006 Insurance 1 LS $ $ 0007 Profit 1 LS $ $ 0008 GRAND TOTAL – Base plus

Options

1 LS $ $

* Estimated Quantity LS = Lump Sum LF = Linear Feet

(End of Section B)