A04_Statement_of_Work_(SOW)_Carter_Ponds.docx
DOCX document 1 MB Posted
- Solicitation number
- 140FC124R0032
About this file
This statement of work outlines rehabilitation requirements for repairing levees and resurfacing roads at the Carter Ponds/Impoundment located within the Panther Swamp National Wildlife Refuge. The project involves reshaping approximately 7,500 linear feet of exterior levee side slopes to between 3:1 and 4:1, clearing vegetation from 93,130 square feet of banks, furnishing and installing 93,130 square feet of seed, mulch, and fertilizer, and placing 2 inches of limestone and gravel over approximately 8,000 linear feet and 12 feet wide of roads. The contractor will be responsible for quality control and safety plans, permitting, layout, and closeout procedures including waste removal and site restoration. The related federal contract opportunity is solicitation number 140FC124R0032 for the Carter Ponds Impoundment Levee repairs issued by the U.S. Fish and Wildlife Service.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140FC124R0032_Amd_0001.pdf | ||
| Sol_140FC124R0032.pdf | ||
| B03_Gen__Wage_Decision_No__MS20240071_1_5_24.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK – REHABILITATION
For Repairing Carter Ponds/Impoundment Levees At Panther Swamp National Wildlife Refuge Near Carter, Mississippi May 30, 2023 Project #2017296078
A. DESCRIPTION OF THE WORK: Rehabilitation to exterior levees and levee tops on the Southeastern Quadrant of the Carter Ponds/Impoundment Levees at Panther Swamp National Wildlife Refuge (NWR) in Yazoo and Humphreys Counties, MS. (See Image 1) This project includes earthen levees totaling approximately 7,500 LF in length that require reshaping side slopes and adding surface material to approximately 8,000 LF in length. The ponds/impoundments support intensive waterfowl management and provide infrastructure to support a cooperative farming program for wildlife. Exterior levees requiring rehabilitation adjoin ditches to the east and west, but ditches will not be excavated. No off-site fill material is permitted. There is no levee work required on the south, exterior levee. Cleaning and reshaping the north, exterior levee is part of another project and not included in this Statement of Work. Interior levees are not included in this rehabilitation project; however, resurfacing is required per the details and map. (See Image 2) Steep side slopes make for unsafe maintenance operations, tend to erode quickly, and are difficult to manage. Insufficient surface materials negatively impact access by equipment and fuel supplies, management of three diesel powered wells, and general access by Refuge and cooperative staff. Side slopes need to provide safe tractor access for mowing.
1. Clear and grub/strip vegetation along side slopes and adjoining ditches to the preferred restored/graded levee slope between 3:1 and 4:1. Due to distance from ditch (toe of slope) to edge of road, variations from 4:1 will be needed and allowed with prior approve from Refuge Manager. Slope can begin no closer than 3 feet from edge of road. See reference photos at end of document.
2. Reshape and regrade levee side slopes along the eastern and western boundaries using existing materials for embankment. Woody debris will be piled in two central locations indicated on Image 3.
3. Compact embankment material as to avoid erosion and prepare for seed, fertilizer, and mulch application.
4. Furnish, transport, and install seed, fertilizer, and mulch on approximately 8 acres of side slopes. Hydroseeding is allowed or mulching with Bermuda grass hay post seed and fertilizer application. Fertilizer applied at 200 lbs/ac and Bermuda seed applied at 50 lbs/ac on approximately 8 acres.
5. Reshape and regrade road surfaces, then place new 610 limestone and #57 washed gravel graded to drain from centerline of road. Road surface is 610 limestone for approximately 3500 ft x 12 ft x 2 in. Other road surface is #57 wash gravel for approximately 4500 ft x 12 ft x 2 in. Limestone is calculated at 145 lbs/cf and totals 507.5 tons. #57 wash gravel is calculated at 95 lbs/cf and totals 427.5 tons. 610 limestone and #57 wash gravel must be weighed, and scale tickets provided per load to total amounts indicated above. See reference photos at end of document.
6. Matting must be installed at each well location for truck passage. Matts must provide protection for a minimum of 20 ft each at 9 locations – 3 wells and 6 underground pipe crossings. Matts to be removed at the end of project.
7. Contractor responsible for calling 811 to locate any possible underground utilities.
B. The work shall include all labor, materials, and equipment to repair levees and resurface roads as called for in this Statement of Work (SOW).
C. Contractor will be required to obtain all necessary federal, state, or local permits unless noted otherwise. Contractor responsible for bathroom facilities/portable toilets.
D. The Government has not field verified dimensions or quantities listed in this SOW. Bidders shall make their own measurements in preparation of their bid.
1.2 PROJECT CONTACTS, LOCATIONS AND SITE ACCESS
A. The overall Contract Administration for this contract is the responsibility of the Contracting Officer (CO). All questions shall be directed to:
Khanhthong S. Moody U.S. Fish and Wildlife Service Joint Administrative Office Email: Khanhthong_Moody@fws.gov
B. Physical Address:
Panther Swamp National Wildlife Refuge
12595 MS HWY 149
Yazoo City, MS 39194
Contact: Seth R. Swafford, Refuge Manager Phone: (662) 836-3004
C. FWS Site Representative for this project is Seth R. Swafford. Any questions regarding the scope of work and technical matters shall be directed to Seth R.
Swafford, U.S. Fish and Wildlife Service, 12595 MS HW 149, Yazoo City, MS 39194.
D. The work site is located on Refuge lands and is accessible from U.S.
Highway 49W near Carter, MS and Belle Prairie Road which is gravel.
See Image 1. Project site coordinates are: N 33.011372° W -90.412717°.
1.3 QUALITY ASSURANCE
A. Construction activities shall be supervised at all times by a competent superintendent who is deemed acceptable to the Government; authorized to act on the contractor’s behalf; and be present on the job site at all times when contract work is being performed (FAR Clause 52.236-6).
B. Contractor shall be responsible for preparing and implementing Quality Control and Safety Plans for the work activity.
1.4 COORDINATION AND WORK PHASES
A. This work effort will require a collaborative approach to complete the Project. The Service and the contractor will meet at the site to identify and resolve areas of uncertainty in permitting, construction, scheduling and coordination, materials, inspections, acceptance, and close-out requirements.
B. The amount of contractor effort required shall vary as to the activity and type of work required by the contract. The typical phases of work under this contract will consist of:
Construction. This task will be the physical construction of the task order in accordance with approved contract documents, including executing effective construction quality control.
Inspections, Acceptance and Close-Out. Following the completion of construction with final inspection/acceptance by the Service, the contractor shall submit final close-out documents.
C. REFERENCED STANDARDS
A. Refer to the Mississippi Department of Environmental Quality (MDEQ) Erosion and Sediment Control and Stormwater Runoff Management Manuals, 2011 Ed.
B. Refer to the Mississippi Department of Transportation (MDOT) Standard Specifications for Road and Bridge Construction, 2017 Ed.
C. Refer to American Society of Testing and Materials (ASTM) Annual Book of Standards.
1.5 GOVERNMENT FURNISHED MATERIALS AND SERVICES
A. The Government will not provide labor, equipment, materials, utilities, or security.
B. Borrow excavation is not available from adjacent ditches on Refuge property.
C. The Government will make site visits for observation of construction progress.
D. The Government has the option of providing materials, supplies and other services to the contractor as may be identified in the task order.
| E. |
| E. The Government will perform inspections of the progress of work for its |
own benefit, but the contractor is responsible for performing their own inspections.
1.6 MATERIAL, PRODUCT, AND DESIGN SUBMITTALS
A. Transmit for review the plans and specifications prepared by or for the contractor to be implemented as called for in this SOW.
B. Transmit for review the information for materials and products to be installed as called for in this SOW.
1.7 LAYOUT WORK
A. The contractor is responsible for laying out the work as called for by this Statement of Work.
1.8 WORKING CONDITION
A. The Contractor shall be responsible for damages to Refuge property including trees, paved or unpaved roads, vegetative groundcover, gates, signs, culverts, docks, wells, underground piping or water control structures.
B. Buried utilities have not been located by the Government. Contractor shall have buried utilities located prior to beginning grading and shall protect all buried utilities.
C. Unmanned aerial systems, including drones and similar technology, are not permitted for use per Department of the Interior Secretarial Order No. 3379.
1.9 CONSTRUCTION
A. Repair the levee slopes in accordance with this SOW and the approved construction information.
B. Furnish, transport, and install new materials as called for in the approved construction information.
C. Retain and protect existing features not called out for demolition or replacement.
1.10 CLOSEOUT
A. Remove and legally dispose of offsite all waste material, trash, debris, and unused material.
B. Remove equipment, portable toilets, vehicles, trailers, storage containers, temporary reference monuments, temporary barricades and warning devices.
C. Restore access roads, driveways, and paths to preconstruction or better condition.
D. Coordinate and participate in pre-final and final punchlist inspection sessions. Record punchlist items and provide resolution of such items to the Contracting Officer.
G. Submit release of claims certification using Government’s standard form to the Contracting Officer.
1.11 PERMITS
A. Notice of Endangered Species Act (ESA), Section 7 Concurrence is not required.
B. National Historic Preservation Act, Section 106 Request for Cultural Resources Assessment is not required.
1.12 SUMMARY OF QUANTITIES
Item No. Description Unit Quantity 1 Project Design LS 1 2 Mobilization LS 1 3 Demobilization LS 1 4 Clear vegetation from banks SF 93,130 5 Strip vegetation below the WSE SF 111,756 6 Backfill Eroded Slope CY 4,140 7 Furnish, Transport, Install & Remove Temporary Construction Exit EA 2 8 Furnish, Transport, & Install Seed, Mulch, & Fertilizer SF 93,130 9 Bonds LS 1
Image 1: Aerial photograph with approximate project site.
Image 2: Detailed site map with levee rehabilitation and gravel overlay.
Image 3: Woody debris piles/brush piles.
Reference photo of limestone road and western exterior levee that requires reshaping.
Reference photo of eastern exterior levee that requires reshaping and clear/grub.
Reference photo of eastern exterior levee that requires reshaping.
END OF STATEMENT OF WORK