This is a Statement of Work (SOW) for native prairie habitat restoration at Altus Air Force Base in Altus, Oklahoma, issued by the U.S. Fish and Wildlife Service (USFWS), Fisheries and Aquatic Conservation Program, Region 2. The project involves restoring native grassland across two locations: a 21.87-acre West Location and a 4.97-acre 6.4 Acre Location. The contractor must procure and apply native grass seeds according to USFWS specifications without tilling and must meet Altus AFB security access requirements. Work must be completed between 0600–1800 Monday through Friday during daylight hours, with all deliverables and final billing due by March 24, 2026. The contractor may proceed any weekday between award date and March 24 after providing at least two days' notice to technical points of contact. Work cannot proceed during conditions that compromise safety or seed viability, such as heavy rain, flooding, or frozen ground.
The primary tasks include submitting a detailed draft and final work plan with project timeline; obtaining and transporting all field equipment, grass seed, and supplies; and seeding designated areas at specified rates using appropriate methods. For the 6.4 Acre Location, the contractor must seed the mixed native grass areas at 10 PLS (Pure Live Seeds) lbs. per acre using a specified 17-species native grass mix. For the West Location, the contractor must seed turf grass areas bordering the sidewalk and fenceline at 43 PLS lbs. per acre and remaining prairie areas at 10 PLS lbs. per acre with a specified 17-species mixed native grass mix. Seed shall not be covered in more than ¼ inch of soil or hydro mulch. Acceptance is based on visual inspection confirming ≥95% coverage of designated areas with seed applied at specified rates and depth. The USFWS biologist, Donna Nolan, will conduct quality control checks and measurement via field inspection. Any unused seed must be transferred to USFWS upon project completion, along with a written summary documenting acreage seeded, estimated depth and rate, seed quantities used per species, and remaining seed quantities.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
Native Prairie Habitat Restoration
Altus Air Force Base / FWS Military Lands Conservation Program
February 13, 2026
1. General:
1.1 Requesting Office
U.S. Fish and Wildlife Service (USFWS, FWS) Fisheries and Aquatic Conservation Program, Region 2 Assistant Regional Director Office, 500 Gold Ave SW, Albuquerque, NM 87102
Type of Service: Habitat Restoration
Worksite: Altus Air Force Base, Altus, OK 73523-5000
1.2 Purpose:
The objective of this project is to restore native grassland on Altus Air Force Base. The contractor will be responsible for procuring grass seeds to the specifications provided by the USFWS. Two locations will be seeded, including a 21.87-acre area (West Location) and a 4.97-acre area (6.4 Acre Location) (ref. below maps).
1.3 Contractor Qualifications:
• Contractors must be capable of effectively seeding native grass seeds without tilling to the specifications listed below.
• Must meet Altus AFB security access requirements.
1.4 Other:
The 6.4-acre site will be prepared by the Government for seeding on soil (excluding any remaining open space for a large hole). The West Location, bermuda grass, has been treated with herbicide and will be burned prior to seeding.
U.S. Fish and Wildlife Service assistance to the U.S. Air Force for natural resource conservation and planning shall be provided as authorized in the Sikes Act (16 U.S.C. § 670 et seq.) and other authorities as per an Inter-Agency Agreement. The scope of this assistance includes, but is not limited to, efforts to support stewardship of natural resources on DoD and non-DoD lands.
2. Place of Performance and Period of Performance
2.1 Location:
This work is to be completed at the Altus Air Force Base, West Location and 6.4 Acre Location, (see below maps). The installation address is: 308 N. 1st St, Altus AFB, OK 73521.
2.3 Work must be accomplished between 0600 – 1800 Monday thru Friday during daylight hours.
In the event of emergencies, Contractor shall provide contact information. Work shall not proceed during conditions that compromise safety or seed viability (e.g., heavy rain, flooding, or frozen ground). Work may proceed any weekday between the date of award and March 24th after at least two days notice are provided to the technical points of contact, as listed below. Deliverables and final billing must be completed by March 24th, 2026. If weather prevents completion, contractor shall notify CO within 24 hours and submit written request for extension.
2.4 Non-duty hours include weeknights, weekends, and Government holidays (New Year’s Day, Martin Luther King JR.s’s Birthday, Memorial Day, Independence Day, Labor Day, Columbus
Day, Veteran’s Day, Thanksgiving Day, Christmas Day).
3. Scope
3.1 General Requirements:
• The contractor shall coordinate access to Altus AFB according to current access procedures.
o The Government will assist with credentialing, to include initiating and obtaining base access credentials by facilitating application submission.
o The contractor is responsible for providing required documentation and complying with all Altus AFB security requirements.
o The contractor must work with the Government to initiate credentialling on the date of award.
o The contractor is responsible for delays caused by incomplete documentation.
• The contractor shall coordinate all work with FWS staff.
• The contractor shall provide an orientation meeting, monthly updates and a meeting prior to seeding.
3.2 Specific Tasks:
• Task 1.0: Work Plan (Draft, Final) o The Contractor must create a detailed work plan to include a timeline for project work.
o The Contractor must meet the requirements for base access and required inspections and provided at least 2 days notice prior to seeding.
• Task 2.0: Native Grass Planting o The Contractor must obtain and transport all field equipment, grass seed, and supplies to the work sites.
o If a no till seed drill is used, the contractor must achieve a rate of 10 PLS lbs. per acre for the mixed grass native seed areas and a rate of 43 PLS lbs. per acre for the turf grass areas as specified per the below maps.
o No seed shall be covered in more than ¼ inch of soil or hydro mulch.
o Any unused seed shall be transferred to USFWS upon project completion.
o Task 2.1: Mixed Native Grass Planting at 6.4 Acre Location
▪ A grass seed mix as specified below must be seeded in all areas of open soil as indicated on the map. If using a no till seed drill the contractor shall achieve a rate of 10 PLS lbs. per acre.
• The Air Force is actively filling a large hole at the 6.4-acre site. If the entirety of the hole is not filled in, the seeding shall be completed where it is safe to operate equipment around the hole.
The contractor will not be liable for not seeding any remaining hole in the work area and any unused seed shall be turned over to
USFWS at the conclusion of the project. The grass shall be seeded as described above in Task 2.0
*In the event species specified below are not available, USFWS must approve substitutions and or changes in composition.
o Task 2.2: Turf Grass Planting at West Location
• A turf grass seed mix as specified below must be seeded in two 6 ft swaths bordering the sidewalk noted on the attached map. The sidewalk is not installed yet but a corridor marking the sidewalk will be flagged off on site prior to seeding. The contractor shall seed 6 ft from each flag with the turf grass seed mix. A turf grass seed mix as specified below will also be seeded in one 6 ft swath immediately bordering the western and southern fenceline. The seeding shall be at a rate of 43 PLS lbs. per acre.
*In the event species specified below are not available, USFWS must approve substitutions and or changes in composition.
o Task 2.3 Native Grass Planting at West Location
• A grass seed mix as specified below must be seeded in all areas within the prairie area boundary indicated on the map except for those areas seeded with the turf grass mixture as noted in Task 2.2.
The contractor shall achieve a rate of 10 PLS lbs. per acre.
*In the event species specified below are not available, USFWS must approve substitutions and or changes in composition.
Species % Composition Blue Grama, (Bouteloua gracilis) 15 Curly Mesquite, (Hilaria belangeri) 15 Buffalo Grass, "Topgun" or "Cody" Primed KNO3 (Bouteloua dactyloides ) 70
Turf Grass Mix - 43 PLS lbs per acre
Contractor shall comply with all applicable OSHA standards and Air Force safety requirements.
Contractor is responsible for hazard identification, fall protection, and excavation safety during operations.
4. Deliverables and/or Delivery Schedule o Task 1.0
• Draft and final work plan submitted electronically to the technical coordinators.
o Task 2.0, 2.1, 2.2, 2.3
• Seeding according to specifications above and quality control on the dates of seeding.
▪ Acceptance will be based on visual inspection confirming ≥95% coverage of designated areas with seed applied at specified rates and depth.
▪ Measurement will be conducted via field inspection by the
Technical Coordinator.
• Transferring the remaining seeds to the USFWS upon completion of the project.
• A brief written summary for each of the two work sites of the acreage seeded, estimated seeding depth and rate, estimate of the quantity of seeds used per species and quantity of remaining seeds to be transferred to the FWS.
Species % Composition Grama, Sideoats "Vaughn" (Bouteloua curtipendula) 10 Grama, Blue "Lovington" (Bouteloua gracilis) 10 Buffalograss, "Topgun" or "Cody" Primed KNO3 (Bouteloua dactyloides) 10 Canada Wildrye (Elymus canadensis) 2.5 Wildrye, Virginia (Elymus virginicus) 5 Lovegrass Sand, "Bend" (Eragrostis trichodes) 5 Green Sprangletop, "Van Horn" (Leptochloa dubia) 2.5 Switchgrass, "Blackwell" (Panicum virgatum) (upland race) 5 Bluestem, Little "Cimarron" (Schizachyrium scoparium) 20 Indiangrass, "Cheyenne" (Sorghastrum nutans) 2.5 Sacaton Alkali (Sporobolus airoides) 5 Prairie Cordgrass (Spartina pectinata) 2.5 Dropseed, Sand (Sporobolus cryptandrus) 5 Tall Dropseed (Sporobolus asper/compositus) 2.5 Tridens, "Purpletop" (Tridens flavus) 5 Wheatgrass, Western "Arriba" (Pascopyrum smithii) 2.5 Big Bluestem (Andropogon gerardii) 5
Mixed Grass Mix 10 PLS lbs per acre
5. Government-Furnished Equipment (GFE) / Government-Furnished Information
(GFI)
5.1 None
6. Evaluation and Acceptance
6.1 The contractor will be evaluated as detailed herein. Government acceptance is contingent upon:
• Successful seeding to the specifications described in this statement of work. The contractor is responsible for proper application of seed in accordance with specified depth, rate, and method. Long-term germination success is not guaranteed and is not a condition of acceptance.
• Quality control checks will be conducted by Ms. Donna Nolan a USFWS biologist.
Acceptance will be based on visual inspection confirming ≥95% coverage of designated areas with seed applied at specified rates and depth.
7. Quality Control/Quality Assurance:
7.1 If using a no till seed drill the following quality control measures are required.
If using a hydro seeder, brillion or other seeding method the following quality control measures are required.
Quality Control USFWS Contractor Seed is stratified and of an appropriate ecoregion for germination at Altus AFB.
Seed hopper is checked routinely to ensure it is fi l led to level recommened by dril l manufacturer.
Seeder is operated such that tubes do not become plugged.
Seeder is operated such that picker wheels turn appropriately.
Tractor and seeder are operated at the speed set by manufacturer for seeding rates.
Rows are checked during seeding for the appropriate seeding depth and to ensure seed is sown in the manner specified by the dril l seeder manufacturer.
USFWS biologist is on site during seeding to ensure the above specifications are met and to advise if corrective action is needed for no less than 90% of the seeding.
Quality Control USFWS Contractor
Seed is stratified and of an appropriate ecoregion for germination at Altus
AFB.
Equipment is operated such that seed is not suspended deeper than 1/4 in matrix or soil
Adequate coverage is achieved over area of site
8. Technical Coordinator:
8.1 Jonathan Martinez, Military Lands Conservation Program Coordinator, Region 2 Fish and
Aquatic Conservation Assistant Regional Director Office, 505-206-4617
8.2 Donna Nolan, Military Lands Conservation Program Fish and Wildlife Biologist, 7200 SE 59th
St, Tinker AFB OK, 73145, (505) 601-7460
Prepared By:
CSU-CEMML
cemml_afcec_env_gis_tsc@mail.colostate.edu
Coordinate System: GCS WGS 1984
Scale: 1:1,620
Prairie Restoration Project
Altus Air Force Base
Map created for presentation purposes only. Although efforts have been made to verify data, accuracy cannot be guaranteed
Cooperative Agreement Number:
W9126G-20-2-0004
1:1,620
0 350175 Feet
Legend
NE Prairie
6.4Acres Mixed Grass
Prepared By:
CSU-CEMML
cemml_afcec_env_gis_tsc@mail.colostate.edu
Coordinate System: GCS WGS 1984
Scale: 1:2,400
Prairie Restoration Project
Altus Air Force Base
Map created for presentation purposes only. Although efforts have been made to verify data, accuracy cannot be guaranteed
Cooperative Agreement Number:
W9126G-20-2-0004
1:2,400
0 520260 Feet
Pond Area
2.5 Acres
Po nd
8 F t
6 Ft
6 Ft
Feature Acres
Fence 6ft Buffer (turfgrass) 0.72
Sidewalk 6ft Buffer (turfgrass) 1.23
Pond (turfgrass) 0.28
Total Area w/out Pond (mixed grass) 19.49
Legend
Prairie Area
Sidewalk
Fence
Sidewalk 6ft Buffer
Fence 6ft Buffer
Prairie Pond
Prairie Pond 8ft Buffer
Installation Boundary
| A04 - 0001 - 2026 Altus Prairie Restoration Contract SOW 02132026.pdf |
| A04 - Praire Restoration Project 6.4 Acre Location.pdf |
| A04 - Praire Restoration Project West Location 10242025.pdf |
File details come from the government source that posted it. Updated .