A04_Statement_of_Work_HalfwayCreek.pdf
PDF 137 KB Posted
- Attached to
- CONSTRUCTION, REPLACE ROOF AT OCHOPEE RANGER STATI Federal contract opportunity
- Solicitation number
- 140P5223R0024
About this file
This statement of work outlines a contract to replace the roof on the Ochopee Ranger Station in Big Cypress National Preserve. The contractor will remove the existing shingles and felt paper from the roof and dispose of them properly. New 25-year shingles and black felt paper will be installed. Up to 20% of the underlayment wood may be replaced if necessary. The work must be completed within 30 days and take no more than 2 weeks to perform. The contractor will work onsite from 7am to 3pm Monday through Friday, following all OSHA and National Park safety rules. The contractor will be responsible for travel and other expenses associated with the project. The government will periodically evaluate the contractor's performance according to the terms of the statement of work.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P5223R0024_Amd_0002.pdf | ||
| B09_Questions_0002.docx | DOCX document | |
| Sol_140P5223R0024_Amd_0001.pdf | ||
| B03_DOL_SOL_Wages.pdf | ||
| B09_QUESTIONNAIRE.pdf | ||
| Sol_140P5223R0024.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
Replace Roof on Ochopee Ranger Station
Big Cypress National Preserve
1. Background: Big Cypress National Preserve (BICY) is a United States
National Preserve located in South Florida, about 45 miles west of Miami on the
Atlantic coastal plain. The 720,000-acre Big Cypress, along with Big Thicket
National Preserve in Texas, became the first national preserves in the United
States National Park System when they were established on October 11, 1974.
2. Objectives:
Remove/Replace the shingled roof with new shingles, and up to 20% of the underlayment wood, if necessary.
3. Place of Performance:
Big Cypress National Preserve
33100 Tamiami Trail E. Ochopee, Fl 34141
Ranger Station
4. Period of Performance:
30 days for completion and invoicing. Work shall only take 2 weeks.
5. Scope:
Remove and replace the shingles with 25-year shingles and black felt paper. Cleaning up the work area.
6. Tasks:
Under this contract, the Contractor SHALL complete the following tasks and requirements:
• Contractor shall work five 8-hour days excluding weekends and holidays, Monday through Friday. From 7 a.m. to 3 p.m.
Unless otherwise directed from NPS personnel.
• Contractor shall remove existing shingles and felt paper from roof and dispose of properly in a dumpster supplied by them.
Also, use some kind of magnet at the end of each shift daily, to pick up loose nails on the grounds around the project.
• They shall use a good quality shingle and felt paper to replace on the new roof (25+ year shingle). Replace up to 20% of underlayment if needed.
• Contractor should hire a company to bring in a portable toilet for their use. There are no facilities open to them near the project.
• Contractor should bring with them portable generators in case the power supply is not sufficient at the Ranger station.
• Contractor should do an on-site visit before the job starts to get correct measurements and location of project.
• 7.Government-Furnished Property, Material, Equipment, or
Information:
8. Safety:
The contractor is to follow at a minimum all OSHA rules and procedures.
Obey all National Park rules and regulations while on park property.
9. Security:
N/A
10.Travel:
Contractor shall be responsible for all travel related expenses for this project (i.e. tools, materials, manpower, meals, per diem)
11. Special Material Requirements:
N/A
12. Quality Assurance Requirement:
The Government will periodically evaluate the contractor’s performance in accordance with the statement of work.