This Statement of Work (SOW) details a roofing replacement project for the Ballard House and Smokehouse at Colonial National Historical Park in Yorktown, Virginia. The project involves removing and replacing approximately 3,400 square feet of cedar shake shingle roof on two historic structures built in 1709, including comprehensive restoration work such as replacing damaged plywood sheeting, repairing roof supports, installing new flashing, ice/water shield, and "cedar breather" underlayment, and installing new Number 1 Blue Label Certigrade cedar shake shingles.
The contract requires the contractor to provide all necessary personnel, equipment, and materials, with work to be performed between 8 AM and 4:30 PM. Key requirements include using new materials that match existing shingles in size, color, and texture, following OSHA guidelines, and providing liability insurance. The project mandates a minimum 1-year warranty on building components and a 5-year warranty on workmanship. Closeout involves submitting a cut-sheet binder with product information and completing a final inspection, with final payment processed after satisfactory completion and correction of any identified deficiencies.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A06_Drawings.pdf | ||
| A06__Appendix_A.pdf | ||
| Sol_140P4225Q0024.pdf | ||
| B03_Wage_Determination_VA_20250169_28_February_2025.pdf | ||
| B08_Construction_Contract_Administration.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COLO PMIS 315132 March 01 2025
COLONIAL NATIONAL HISTORICAL PARK
Yorktown, Virginia
Replace Roof on Ballard House and Smokehouse
PROJECT MANUAL
Summary of Work
NATIONAL PARK SERVICE
March 01, 2025
STATEMENT OF WORK
REMOVE/REPLACE CEDAR SHAKE SHINGLE ROOF ON BALLARD HOUSE AND SMOKEHOUSE
214 Nelson St. Yorktown VA 23690 Colonial National Historical Park
Virginia
PART 1 - GENERAL
1.01 DESCRIPTION OF WORK
A. This contract provides for the removal and replacement of approximately 3,400 -SF of cedar shake shingles and underlayment, repair/replace damaged plywood sheeting or skip sheathing, replace flashing around chimney(s), replace damaged fascia, install ice/water shield & “cedar breather” underlayment on the Ballard House and Smokehouse.
1. The building is a two-story housing unit and single-story smokehouse with wood shingle roofs. The structures were built in 1709.
2. The buildings will not be occupied during this contract.
B. The contract work includes:
1. Remove and dispose of the existing wood shingle roof(s) and roofing underlayment off site
2. Protect the building structure and contents from weather and other potentially damaging elements
3. Inspect the existing roof supports (rafters) and fascia boards, replace damaged facia, trim boards in-kind
4. Repair or replace in kind as necessary damaged roof supports (rafters), decking, s k i p sheathing revealed by inspection. Note: It is estimated that 10% of decking or sheathing may need replaced.
5. Replace in kind all existing flashing
6. Install new ice/water shield & “cedar breather” roofing underlayment
7. Install new cedar shake shingles (Number 1 Blue Label Certigrade) with stainless steel ring shank nails
8. Replace in-kind 2 entryway rain diverters
9. Install new waterproof vent collars
10. Disposing properly of all excess materials and debris
11. Erosion prevention and quality assurance testing
12. Reconstruction and restoration of disturbed areas.
C. All work will be performed under a single contract.
D. Work and materials shall adhere to the following mitigations:
1. Replacement cedar shake shingles should match existing shingles in size, color, and texture. New shingles must be approved by COR before installation.
2. Materials shall be stored at work location.
3. Must follow OSHA guidelines for work performed on an elevated surface.
1.02 LOCATION AND ACCESS
A. The project site is located at 214 Yorktown St. Yorktown VA 23690.
1.03 CONTRACTOR-FURNISHED ITEMS
A. The Contractor shall furnish all necessary supervision, personnel, equipment, transportation, materials, and incidentals required to complete the contract requirements.
B. Contractor shall provide proof of liability insurance for all personnel working in completion of this project.
1.04 WORK CONDITIONS AND LIMITATIONS
A. FACILITY USE
1. There are open public restrooms within walking distance of work location.
B. REQUIRED PERFORMANCE PERIOD
1. Work performance period is to be determined; all work shall be performed between 8 AM – 4:30 PM.
C. CONTRACTOR’S USE OF PREMISES
1. Confine on-site material storage, equipment and vehicle parking, and staging to paved parking areas or other areas specifically designated by the Contracting Officer’s Representative (COR).
2. Keep job site clear of trash and debris. Dispose of any trash, debris and other unusable material legally at authorized facilities on non-Federal land.
D. FIELD VERIFICATION
1. The measurements and quantities specified are estimates and provided for information only. The Contractor must verify all locations, dimensions and conditions affecting the work.
1.05 QUALITY ASSURANCE
A. All proposed materials and methods must meet or exceed the current local, state, and federal codes, standards, and regulations applicable to the contract work.
B. All personnel performing work shall be fully qualified and experienced in the type of work they will execute.
1.06 WARRANTIES
A. Building components: Minimum 1-year warranty against defects. Provide a minimum 5-year warranty for workmanship.
B. Prior to beginning work, report to the COR any conflict in warranty requirements, work scheduling or material availability before proceeding with the work.
1.07 MATERIAL HANDLING
A. Deliver materials to the job site as per COR instructions. Comply with all manufacturers’ recommendations for storage, protection and handling.
PART 2 - MATERIAL
2.01 GENERAL
A. Use new materials except as otherwise approved by the Contracting Officer (CO).
2.02 REQUIRED SUBMITTALS AND APPROVALS
A. LIST OF REQUIRED SUBMITTALS
1. Contractor Liability Insurance
2. Warranty Information
B. CHANGES TO MATERIAL REQUIREMENTS
1. Any proposed changes by the Contractor to the construction materials shall be submitted in writing to the
COR
PART 3 - EXECUTION OF WORK
3.01 GENERAL
A. SERVICE INTERRUPTION
1. Indicate by work schedule expected periods of construction to avoid conflict with operations.
B. SITE INVESTIGATION
1. The Contractor is responsible for investigating site conditions in the vicinity of the required work for any hazards or obstacles which may increase time or cost of the work.
C. CHANGES TO CONSTRUCTION METHODS
1. Any proposed change by the Contractor to the specified construction methods and manufacturer’s instructions must be submitted in writing to the CO along with the justification for the proposed change.
Approval from the CO is required for changes in specified construction methods.
D. PROTECTION OF WORK SITE
1. Work site is not protected and is open with no fencing.
2. Maintain the work area and approaches clean and free from trash and debris to reduce interference with ongoing maintenance operations.
3. Provide a safe bypass for NPS employees, and contractor’s personnel.
3.02 PROJECT CLOSEOUT
A. CLEANUP
1. Remove all tools, equipment, excess materials, construction debris, and trash from the project site. Leave project site clean and ready for use at the time of final inspection.
2. Legally dispose of all excess and unusable materials at authorized disposal facilities.
B. FINAL INSPECTION AND ACCEPTANCE OF WORK
1. When all work including any site restoration and cleanup has been completed, the Contractor shall contact the COR to arrange the final inspection.
2. The Contractor shall be notified of any deficiencies found during the final inspection. After all deficiencies have been corrected and all required closeout submittals have been forwarded to the COR, the CO will issue a letter of final acceptance and request the release of claims.
C. CLOSEOUT SUBMITTALS
A. Provide to the COR the following closeout submittals and any other closeout submittals required by the CO:
1. Cut-Sheet Binder: Submit one binder with all manufacturer product information and cut-sheets for all materials installed under this contract. Label binder with project title and include one “contents” page.
PART 4 – PAYMENT
1. Final payment shall be processed upon confirming all noted contractor performance deficiencies have been satisfactorily corrected.
| 1.02 LOCATION AND ACCESS |
| 1.03 CONTRACTOR-FURNISHED ITEMS |
| 1.04 WORK CONDITIONS AND LIMITATIONS |
| A. FACILITY USE |
| 1. There are open public restrooms within walking distance of work location. |
| C. CONTRACTOR’S USE OF PREMISES |
| D. FIELD VERIFICATION |
| 1.05 QUALITY ASSURANCE |
| 1.06 WARRANTIES |
| 1.07 MATERIAL HANDLING |
| PART 2 - MATERIAL |
| 2.02 REQUIRED SUBMITTALS AND APPROVALS |
| A. LIST OF REQUIRED SUBMITTALS |
| B. CHANGES TO MATERIAL REQUIREMENTS |
| PART 3 - EXECUTION OF WORK |
| A. SERVICE INTERRUPTION |
| B. SITE INVESTIGATION |
| C. CHANGES TO CONSTRUCTION METHODS |
| D. PROTECTION OF WORK SITE |
| 3.02 PROJECT CLOSEOUT |
| A. CLEANUP |
| B. FINAL INSPECTION AND ACCEPTANCE OF WORK |
| C. CLOSEOUT SUBMITTALS |
PART 4 – PAYMENT