A04_Statement_of_Work.docx
DOCX document 15 KB Posted
- Attached to
- Replace Existing Fire Panel at Bunkhouse Facility Federal contract opportunity
- Solicitation number
- 140FC124Q0034
About this file
This document is a Statement of Work (SOW) for replacing the fire panel, alarms, and pull switches in the Bunkhouse facility at the Merritt Island National Wildlife Refuge in Titusville, Florida.
The objective is to replace the existing fire panel, alarms, and pull switches with a new system that meets all relevant federal and state safety standards and connects to the NASA Kennedy Space Center monitoring system. The scope of work includes removing the existing equipment, procuring and installing the new fire panel, alarms, pull switches and accessory equipment, and testing and commissioning the new system. The contractor is responsible for providing a detailed proposal, coordinating the installation, and delivering documentation including as-built drawings, manuals, and warranty information.
The related federal contract opportunity, Solicitation Number 140FC124Q0034, is issued by the Department of the Interior Fish and Wildlife Service to replace the existing fire panel at the Bunkhouse facility.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140FC124Q0034_Amd_0001.pdf | ||
| Gen__Wage_Decision_FL20240196_11_01_2024.pdf | ||
| Sol_140FC124Q0034.pdf | ||
| A06_Bunkhouse_Fire_System_Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work To replace fire panel and associated pull switches and alarms and accessory equipment in the Bunkhouse at Merritt Island National Wildlife Refuge, Titusville, FL 32780
1. Objective:
The objective of this project is to replace the existing fire panel, alarms, and pull switches and accessory equipment in the Bunkhouse facility at the Merritt Island National Wildlife Refuge, Titusville, FL 32781. The new system should meet all relevant federal and state safety standards and regulations, and connect to the NASA Kennedy Space Center monitoring system, ensuring the effective detection and response to fire emergencies.
2. Project Overview:
The scope of work includes the following tasks:
- Removal of the existing fire panel, alarms, and pull switches.
- Procurement of a new fire panel, alarms, and pull switches and accessory equipment that meet the required specifications and standards.
The following is an estimated list of all items to be provided and installed by the contractor along with the proper quantity of each item.
· Fire Alarm Control Panel QTY (1)
· Parallel Protector w/Lockout Kit (1)
· Sealed Lead Acid Battery (2)
· System Record Documents Box (1)
· Fixed Temp/Rate of Rise Heat Sensor (1)
· 6” Sensor Base, Bone Color (1)
· Photoelectric Smoke Sensor (7)
· 6” Sensor Base, Bone Color (7)
· Horn Strobe 24VDC, Multi Candela, Wall Mount, Red (5)
· Work Electrical Outlet Box (1-Gang) (5)
· Addressable Manual Pull Station, Dual Action (3)
· Addressable Duct Detector (1)
· Duct Detector Sampling Tube (1)
· Strobe 24VDC, Multi Candela, Wall Mount, Red (2)
- Installation of the new fire panel, alarms, pull switches and accessory equipment in the bunkhouse.
- Testing and commissioning of the new system, including testing with NASA to ensure proper functionality.
3. Responsibilities:
The responsibilities of the contractor include:
- Conducting a site visit to assess the existing system and determine the requirements for the replacement.
- Providing a detailed proposal outlining the recommended fire panel and pull switches, including specifications, costs, and delivery timelines.
- Procuring the approved equipment from reliable suppliers.
- Coordinating with the Refuge to schedule the installation and minimize disruption to the facility's operations.
- Carrying out the installation in accordance with industry best practices and manufacturer guidelines.
- Conducting thorough NASA/KSC testing and commissioning of the new system to ensure its proper functioning.
- Providing documentation, including as-built drawings, user manuals, and warranty information.
4. Deliverables:
The contractor shall provide the following deliverables upon completion of the project:
- Installed and fully functional fire panel, alarms, and pull switches.
- Testing and commissioning reports, including any necessary certifications.
- Documentation, including as-built drawings, user manuals, and warranty information.
6. Safety and Compliance:
The contractor shall ensure that all work is carried out in compliance with relevant safety regulations and standards. They shall also obtain any necessary permits or approvals required for the installation and commissioning of the new fire panel and pull switches.
8. Warranty:
The contractor shall provide a warranty for the installed fire panel and pull switches, covering any defects in materials or workmanship for a specified period. The warranty terms and conditions shall be clearly defined in the contract.
Note: This scope of work is a general outline and may need to be customized based on the specific requirements of the project.