A04_Statement_of_Work_CRLA_Carpet.pdf
PDF 4 MB Posted
- Attached to
- Remove and Replace Carpet, Crater Lake NP Federal contract opportunity
- Solicitation number
- 140P8424Q0096
About this file
This document is a Statement of Work (SOW) for a federal contract opportunity to remove and replace carpet in three buildings at Crater Lake National Park in Klamath County, Oregon.
The National Park Service has a requirement for the removal of existing carpet and installation of new commercial grade, nylon, broadloom, cushion backed carpet in the NPS Administration Sager Building #1, Canfield Ranger Station Building #3, and Resources Building #5. The contractor shall provide all supervision, labor, equipment, testing, and supplies necessary to complete the work. The project is a total small business set-aside, with a NAICS code of 238330. The Government anticipates awarding a firm-fixed-price purchase order based on the most advantageous quote considering price and other factors. The SOW provides detailed requirements for project execution, including quality control, safety, temporary facilities, closeout procedures, and photo documentation of the buildings.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P8424Q0096_Amd_0001.pdf | ||
| B11_Site_Visit_Sign_in_Sheet_CRLA_Carpet_0001.pdf | ||
| B12_Miscellanious_Correspondence_Questions_and_Answers_CRLA_Carpet_0001.pdf | ||
| B08_Solicitation_ATT_5_Tech_Info_Form_140P8424Q0089.pdf | ||
| B03_Wage_Determination_CRLA_Carpet_Klamath_County.pdf | ||
| Sol_140P8424Q0096.pdf | ||
| B08_Attachment_4_140P8424Q0089_52_212-3_Full_Text_(Sep_2023).pdf | ||
| B08_Solicitation_ATT_1_140P8424Q0089_Quote_Sheet.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CRLA 316868 GENERAL REQUIREMENTS Page 1
PROJECT SPECIFICATIONS
GENERAL REQUIREMENTS
PART 1 – SUMMARY OF WORK (SECTION 01 11 00)
1.1 WORK COVERED BY CONTRACT DOCUMENTS
A. General: All work outlined below will be performed under a single contract.
B. Project Location: This project is located at the park headquarters area in Crater Lake National Park, Klamath County, Oregon.
C. Project Scope of Work: New carpet will be installed throughout the NPS Administration Sager Building #1, Canfield Ranger Station Building #3 and Resources Building #5 to include all labor, equipment, supplies and materials. These building are not open to visitors. Old carpet will be removed, and new carpet installed. New carpet will be commercial grade, Nylon, broadloom, cushion backed, adhesive applied, roll stock carpet rated for heavy traffic, cut to fit individual rooms, stairwells, and associated hallways in Sager, Canfield, and Building 5.
Floor preparation will include removal of old adhesive, floor leveling as required, and all other subfloor preparation as needed to meet manufacturer’s recommendations for product installation. Multiple colors shall be provided and selected by the park staff. (Colors will generally be selected to match existing.) Old carpet will be disposal by contractor. Office furniture will need to be relocated by the contractor and put back after new carpet has been laid. Minor woodwork may be required to repair trim work that is damaged as a result of demolition.
1.2 REFERENCE DOCUMENTS / REPORTS
A. General: The following reference documents / reports are attached or available upon request to supplement the information in the specifications:
1. NPS Forms (RFI, CM-16, and QC Daily Report)
2. Site Location Map
3. Park Regulations
1.4 PUBLIC / STAFF USE OF THE SITE
A. General: The project site will be open to staff during construction. The contractor shall at all times conduct operations to ensure the least inconvenience to the staff. Temporary closures may be permitted upon specific written approval of the Contracting Officer.
1.5 CONTRACTOR USE OF SITE
BLewis Typewritten Text Solicitation #140P8424Q0096
CRLA 316868 GENERAL REQUIREMENTS Page 2
A. Park Regulations: Ensure all personnel (contractors, subcontractors, and vendors) entering or working in the park are familiar with and obey all park regulations. Law enforcement rangers will intervene if they perceive any unsafe or unlawful activity.
B. Park Entry: Vehicles associated with the Contractor shall be waived the entrance fee upon entering in a marked company vehicle or by providing the names of employees entering in personal vehicle(s). Please note that the entrance fee is waived only for the purpose of reporting directly to a specific work location. Any deviation for recreational purposes is subject to payment of required entrance fees.
1. Provide the Contracting Officer with a listing of all contract personnel and their associated vehicles entering the park on a daily basis.
2. Provide the Contracting Officer with a listing of anticipated deliveries for each week.
C. Site Access: The contractor shall access the project site as outlined on the attached site map.
Do not drive vehicles off road or access non-project areas without permission from the contracting officer or their representative.
D. Working Hours: Regular work hours shall be limited to daylight hours from 8:00 a.m. until 5:00 p.m. Monday through Friday, excluding government holidays. Work outside regular hours requires approval from the contracting officer.
E. Staging and Storage: Confine the storage of equipment and materials to the staging / lay-down / storage areas as established at the preconstruction meeting.
F. Property Damage: The Contractor is required to report missing, lost, stolen, or damaged property occurring within the park. This report must be made to a Law Enforcement Ranger or Park Dispatch at the first available opportunity.
G. No Smoking Policy: Smoking is prohibited inside or outside within 25 feet of any buildings in the park. This applies to existing buildings and buildings under construction or renovation.
Discarding of tobacco products or debris anywhere other than into designated tobacco receptacles is considered littering and subject to fines.
PART 2 – WORK RESTRICTIONS (SECTION 01 11 40)
2.1 WORK RESTRICTIONS
A. General: The Contractor must comply with the following work restrictions:
B. Vehicles / Heavy Equipment:
1. Rules of the Road: All vehicles will comply with posted traffic regulations, including speed limits and double-yellow center lane markings. Vehicles and heavy equipment shall take every safe opportunity to use paved roadside pullouts in order to allow faster moving traffic to pass. Failure to comply with traffic regulations will result in a citation being issued to the driver.
CRLA 316868 GENERAL REQUIREMENTS Page 3
2. Vehicle Parking: The contractor shall park vehicles and heavy equipment in designated areas as established at the preconstruction meeting. Vehicles are not permitted within long-term or overnight parking along park roads or in associated overlooks / pullouts.
3. Driveways and Entrances: The contractor shall keep driveways and entrances serving the premises clear and available to the government, government employees, and emergency vehicles at all times.
4. Vehicle Exhaust: All vehicles will be properly maintained to ensure that the exhaust produced is within legal limits. Effects of excessive vehicle exhaust may be subject to enforcement of State and Federal laws regarding emissions as well as those regarding threatened and endangered species.
5. Spills: The Contractor shall be responsible for any cleanup efforts required in accordance with 40 CFR and all applicable state environmental quality laws regarding disposal and cleanup of hazardous / industrial wastes. Contractor must immediately notify the Contracting Officer of spills.
6. DOT Compliance: All vehicles are to be compliant with all DOT requirements including but not limited to driver with appropriate license class, medical examiner card as appropriate with license class, carrying three (3) triangles or three (3) flares, mounted fire extinguisher, and valid DOT safety sticker.
7. Road & Weight Restrictions: All vehicle load, weight, and size limitations, as established by State law, apply to vehicles operated on the Park road (36 CFR § 4.11).
No loads heavier than the current load rating for park roads and bridges will be permitted.
C. Resource Protection:
1. General: The Park is committed to protecting natural and cultural resources found within the park and adjacent lands. The Contractor must comply with the following rules and conditions:
2. Preservation of Natural Features: Prevent damage to natural surroundings. Do not attach ropes, wires, guy lines, cables, or chains to trees or vegetation. Restore damaged areas and replace damaged trees, vegetation, and grass at no expense to the government.
3. Invasive Species: The introduction of non-native invasive species can threaten rare and endangered species or can create new populations of non-native species not traditionally found in the park. The contractor is required to inform personnel, subcontractors, and vendors to thoroughly clean all vehicles (especially the tires), equipment, tools, supplies, and materials prior to packing / loading.
4. Endangered Species: Endangered species are protected by Federal law. Obey all park regulations. Drivers must obey all traffic laws and watch for animals on or alongside
CRLA 316868 GENERAL REQUIREMENTS Page 4 road or at the jobsite. Contact Park Dispatch immediately if animal is hit or injured or will not move off the road.
The following measures are required to minimize disturbance to endangered wildlife:
a. Work shall be conducted to ensure the work area is cleaned up at the end of each work shift so that loose tools, debris, and materials are not left out in a manner that could present a hazard to a listed species.
b. Noise and vibrations of equipment shall be kept to a minimum when working in the vicinity of a listed species.
c. Hazmat spill prevention protocols shall be employed when using gas-powered equipment.
d. Tarps shall be used to contain all paint chips and building debris from exterior surfaces that may fall to the ground.
e. Ensure loose nails and screws do not make it to the ground when working on exterior surfaces as these can be detrimental to listed species.
PART 3 – PROJECT MANAGEMENT (SECTION 01 31 00)
3.1 SUBMITTALS
A. Division 01 Submittal Documents: The following documents shall be submitted a minimum of one week prior to the Preconstruction Meeting. If all these documents have not been received one week prior to the scheduled Preconstruction Meeting date, the meeting will be cancelled and the Notice to Proceed (NTP) will not be issued. Work shall not commence until written Notice to Proceed has been issued.
1. Letter designating the Project Superintendent.
2. Construction Schedule - Submit a baseline schedule with start date, end date, major work activities and durations, estimated pre-final inspection date, and other major milestones.
Provide updates to baseline schedule as needed / requested during construction.
3. Schedule of Values (SOV) – Submit a schedule of values with a breakdown of component work activities for which progress payments will be requested. The total costs for the component work activities shall equal the total contract price.
4. Accident Prevention Plan (APP) – Submit an accident prevention plan with the name of the supervisor responsible for executing the plan, a job hazard analysis for each major work activity, first aid procedures, and planning for potential emergency situations.
5. A list of Subcontractors for this project.
6. Written statements from subcontractors certifying compliance with applicable labor standard clauses.
CRLA 316868 GENERAL REQUIREMENTS Page 5
7. Satisfactory evidence of liability insurance coverage and workman’s compensation for the Contactor and all subcontractors.
B. Division 02-49 Submittal Documents: The following documents shall be submitted to the
Contracting Officer prior to construction start. If these documents have not been received and approved by the NPS prior to construction, the construction start date may be delayed.
1. Product Data – Submit product cut sheets / material data on all products to be used for approval. Indicate the size, model, or type of each recommended product.
2. Samples – When requested, submit a physical sample of a product or an array of color choices for approval.
3.2 PRECONSTRUCTION MEETING
A. Preconstruction Meeting: Before the start of construction, the Contracting Officer will arrange for a preconstruction meeting either on site or via teleconference. The meeting agenda will include the following topics:
1. NPS Roles & Responsibilities
2. Key Contractor Personnel
3. Coordination with Subcontractors
4. Correspondence & Submittal Procedures
5. Submittals
a. Status of Division 01 Submittals
b. Schedule & SOV
c. Safety & Accident Prevention Plan
d. Status of Division 02-49 Submittals
6. Park Rules & Regulations
7. Work Hours and Weekend, Holiday, and Night Work
8. Project Information
a. Park Access & Vehicle Reporting
b. Jobsite Access & Parking
c. Staging, Storage, and Lay Down Area(s)
d. Temporary Facilities & Controls
e. Jobsite Restrictions
f. Resource Protection
g. Weather, Climate, Environmental Conditions
h. Reference Documents
i. Other Contracts / Ongoing Work
9. Labor Standards Provisions
10. Labor Interviews
11. Payroll Reports
12. Payments to the Contractor
13. Change Orders / Modifications
14. Progress Meetings
15. QC Daily Reports
16. Inspections
17. Acceptance and Rejection of Work
18. Closeout Procedures & Submittals
19. Contract Period of Performance
CRLA 316868 GENERAL REQUIREMENTS Page 6
20. Notice to Proceed
3.3 REQUESTS FOR INFORMATION (RFIs)
A. General: On discovery of the need for additional information or interpretation of the Contract Documents, the Contractor shall prepare and submit a RFI utilizing the form attached.
1. Contracting Officer will only respond to RFIs submitted by the Contractor.
2. Coordinate and submit RFIs in a prompt manner to avoid delays in the work.
B. RFI Form: Include a detailed, legible description of the subject or item needing information or interpretation on the RFI Form with:
1. RFI number, numbered sequentially.
2. Date.
3. RFI subject.
4. Specification Section number and title and related paragraphs, as appropriate.
5. Drawing number and detail references, if applicable.
6. Photographs or sketches if applicable.
7. Contractor's suggested resolution. If the Contractor's suggested resolution impacts the contract time or the contract sum, Contractor shall state impact in the RFI.
C. Response to the RFI: The Contracting Officer will review each RFI, determine the action required, and respond accordingly.
PART 4 – SUBMITTAL PROCEDURES (SECTION 01 33 23)
4.1 SUBMITTAL PROCEDURES
A. CM-16 Transmittal Form: All submittals shall be transmitted using National Park Service CM- 16 form attached to the end of this specification section. No action will be taken on a submittal item unless accompanied by the CM-16 transmittal form. Complete all applicable fields, sign the form, and attach all supporting documentation.
PART 5 – SAFETY REQUIREMENTS (SECTION 01 35 23)
1.1 SAFETY REQUIREMENTS
1. First Aid Equipment: Provide adequate first aid equipment for all contract employees and the hazards associated with the types of ongoing construction work at the site.
2. First Aid Training: Provide adequate training to all Contractor personnel to ensure prompt and efficient application of first aid.
3. Personal Protective Equipment (PPE): Provide personal protective equipment (PPE) that meets applicable OSHA and ANSI standards for all contract employees.
4. Hazardous Materials: Hazardous materials are defined as explosive, flammable, poisonous, corrosive, oxidizing, irritating, or otherwise harmful substances that could cause death or
CRLA 316868 GENERAL REQUIREMENTS Page 7 injury. Store hazardous materials in accordance with manufacturer’s and OSHA recommendations. Maintain MSDS onsite for each chemical used on the jobsite.
Immediately report all spills of hazardous materials to the contracting officer.
5. Safety Meetings: At a minimum, conduct weekly "toolbox" safety meetings. These meetings shall be conducted by a foreman or supervisor and attended by all construction personnel at the worksite. Topics need to coincide with work scheduled for the week.
6. Emergency Contacts: Post telephone numbers and reporting instructions for ambulance, hospital, fire department, police, and park dispatch in conspicuous locations at the site.
7. Emergency Reporting: In the event of an emergency medical incident, the Contractor shall Dial 911 as needed. The Contractor shall also contact Park Dispatch at for any medical emergency, traffic accident, or personal injury occurring within the Park. Park Dispatch is called so that the entrance station will be prepared should any emergency vehicles need to enter the Park and so that any available Emergency Medical Services personnel in the Park might respond until such time as the ambulance arrives.
PART 6 – QUALITY REQUIREMENTS (SECTION 01 40 00)
4.1 QUALITY REQUIREMENTS
A. General: The Contractor is responsible for all quality control to guard against defects and deficiencies in the work. Inspect and test work as needed to ensure that the quality of materials, workmanship, construction, finishes, and functional performance are in compliance with applicable specifications, drawings, building codes and standards.
B. Quality Control (QC) Daily Reports: Submit quality control daily reports documenting the progress and quality of the work. The Contractor’s Quality Control Supervisor shall utilize the forms attached at the end of this Section. The submission frequency of the QC Daily Report to the contracting officer will be determined at the preconstruction meeting.
PART 7 – TEMPORARY FACILITIES & CONTROLS (SECTION 01 50 00)
7.1 TEMPORARY FACILITIES & CONTROLS
A. General: The contractor will be allowed to set up temporary facilities and controls as outlined. All temporary facilities and controls shall be removed from the site before final acceptance of the work.
B. Temporary Office: The construction of temporary office buildings or installation of trailers will not be allowed in the park. If the contractor requires office space, the park will attempt to accommodate the contractor with an existing space for administrative work.
C. Temporary Enclosures: For uncontrolled sites, the contractor shall construct an enclosure fence, barrier, or partition to prevent people and animals from entering the project site except by gates / doors.
PART 8 – EXECUTION (SECTION 01 73 40)
8.1 EXECUTION
CRLA 316868 GENERAL REQUIREMENTS Page 8
A. Examination: Examine the project area and site facilities and verify compatibility between existing conditions and the scope of work.
B. Preparation: Take field measurements or conduct surveys to verify dimensions before fabrication or installation.
C. Installation: Install all systems or components according to the specifications, manufacturer’s recommendations, permit conditions (where applicable), and local, State, and Federal codes, standards, and regulations.
D. Correction of the Work: Upon discovery of defects or damage of new work or to existing facilities damaged by new work, repair or replace damaged systems or components and restore substrates and finishes.
E. Progress Cleaning: Clean the project site and work area on a daily basis. Keep site free of waste and debris in proper containment. Properly dispose of all waste and debris offsite.
F. Final Cleaning & Waste Disposal: At the completion of the work, clean all surfaces and remove all waste materials, trash, tools, equipment, machinery, and surplus items from the project site and legally dispose of all waste items.
PART 9 – CLOSEOUT PROCEDURES (SECTION 01 77 00)
9.1 SUBSTANTIAL COMPLETION AND FINAL INSPECTION
A. When the project, or a designated portion of the project, is substantially complete, the Contractor shall request a final inspection in writing. Upon receipt of the written request that the project is substantially complete, the Contracting Officer will proceed with a final inspection within ten (10) days of receipt of request or will advise the Contractor of items that prevent the project from being designated as substantially complete.
B. If the work is determined to be substantially complete at the final inspection, the Contracting Officer will prepare a Letter of Substantial Completion with a Punch List of deficiencies to be corrected before final acceptance. The Contractor shall complete the work described in the Punch List within thirty (30) calendar days, as weather permits. If the Contractor fails to complete the work within this time frame, the Contracting Officer may either replace or correct the work with an appropriate reduction in the contract price or charge for re-inspection costs in accordance with the Inspection of Construction clause of the contract.
C. If the work is determined to be not substantially complete, the Contracting Officer will notify the Contractor in writing. The Contractor may request a new final inspection. All re-inspection costs may be charged against the Contractor in accordance with the Inspection of Construction clause of the contract.
D. After all deficiencies have been corrected and the project is complete, a Letter of Final Acceptance will be issued by the Contracting Officer.
CRLA 316868 GENERAL REQUIREMENTS Page 9
PART 10 – PHOTOS
BUILDING 1
CRLA 316868 GENERAL REQUIREMENTS Page 10
CRLA 316868 GENERAL REQUIREMENTS Page 11
CRLA 316868 GENERAL REQUIREMENTS Page 12
CRLA 316868 GENERAL REQUIREMENTS Page 13
BUILDING 3
CRLA 316868 GENERAL REQUIREMENTS Page 14
CRLA 316868 GENERAL REQUIREMENTS Page 15
BUILDING 3
BUILDING 1
BUILDING 5
CRLA - 316868 02 41 19 - 1
SELECTIVE DEMOLITION
SECTION 02 41 19 - SELECTIVE DEMOLITION
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Demolition and removal of selected portions of building or structure.
2. Demolition and removal of selected site elements.
3. Demolition and removal of previously installed temporary shoring.
4. Salvage of existing items to be reused or recycled.
1.3 DEFINITIONS
A. Remove: Detach items from existing construction and dispose of them off-site unless indicated to be salvaged or reinstalled.
B. Remove and Salvage: Detach items from existing construction, in a manner to prevent damage, and deliver to the Government ready for reuse .
C. Remove or Salvage and Reinstall: Detach items from existing construction, in a manner to prevent damage, prepare for reuse, and reinstall where indicated.
D. Existing to Remain: Leave existing items that are not to be removed and that are not otherwise indicated to be salvaged or reinstalled.
E. Dismantle: To remove by disassembling or detaching an item from a surface, using gentle methods and equipment to prevent damage to the item and surfaces; disposing of items unless indicated to be salvaged or reinstalled.
1.4 MATERIALS OWNERSHIP
A. Unless otherwise indicated, demolition waste becomes property of Contractor.
B. Historic items, relics, antiques, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, and other items of interest or value to the Government that may be uncovered during demolition remain the property of the Government.
1. Upon uncovering an item suspected of being historic, notify the Contracting Officer within 4 hours.
CRLA - 316868 02 41 19 - 2
2. The Contracting Officer, or designated representative, will determine if the item is historic.
3. Carefully salvage in a manner to prevent damage and promptly return to the Government.
1.5 PRECONSTUCTION MEETINGS
A. Predemolition Conference: Conduct conference at Project site.
1. Inspect and discuss condition of construction to be selectively demolished.
2. Review and finalize selective demolition schedule and verify availability of materials, demolition personnel, equipment, and facilities needed to make progress and avoid delays.
3. Review areas where existing construction is to remain and requires protection.
1.6 INFORMATIONAL SUBMITTALS
A. Schedule of Selective Demolition Activities: Indicate the following:
1. Detailed sequence of selective demolition and removal work, with starting and ending dates for each activity. Ensure Government's on-site operations are uninterrupted.
2. Coordination of The Government's continuing occupancy of portions of existing building and of The Government's partial occupancy of completed Work.
1.7 FIELD CONDITIONS
A. Conditions existing at time of inspection for bidding purpose will be maintained by The Government as far as practical.
B. Notify Contracting Officer of discrepancies between existing conditions and Drawings before proceeding with selective demolition.
C. Historic Areas: Demolition and hauling equipment and other materials shall be of sizes that clear surfaces within historic spaces, areas, rooms, and openings, including temporary protection, by 12 inches or more.
D. Storage or sale of removed items or materials on-site is not permitted.
1.8 COORDINATION
A. Arrange selective demolition schedule s to minimize interference with The Government's operations.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having
CRLA - 316868 02 41 19 - 3
jurisdiction.
2.2 REPAIR MATERIALS
A. Use repair materials identical to existing materials.
1. If identical materials are unavailable or cannot be used for exposed surfaces, use materials that visually match existing adjacent surfaces to the fullest extent possible.
2. Use materials whose installed performance equals or surpasses that of existing materials.
B. Comply with material and installation requirements specified in individual Specification Sections.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that utilities have been disconnected and capped before starting selective demolition operations.
B. Review Project Record Documents of existing construction or other existing condition and hazardous material information provided by The Government. The Government does not guarantee that existing conditions are same as those indicated in Project Record Documents.
C. Verify that hazardous materials have been remediated before proceeding with building demolition operations.
D. Survey of Existing Conditions: Record existing conditions by use of measured drawings preconstruction photographs or video and templates.
3.2 PROTECTION
A. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.
1. Provide protection to ensure safe passage of people around selective demolition area and to and from occupied portions of building.
2. Protect walls, ceilings, floors, and other existing finish work that are to remain or that are exposed during selective demolition operations.
B. Remove temporary barricades and protections where hazards no longer exist.
3.3 SELECTIVE DEMOLITION, GENERAL
A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:
1. Proceed with selective demolition systematically, from higher to lower level. Complete
CRLA - 316868 02 41 19 - 4
selective demolition operations above each floor or tier before disturbing supporting members on the next lower level.
2. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.
3. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain portable fire-suppression devices during flame-cutting operations.
4. Remove decayed, vermin-infested, or otherwise dangerous or unsuitable materials and promptly dispose of off-site.
5. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.
B. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
C. Work in Historic Areas: In historic spaces, areas, and rooms, or on historic surfaces, the terms "demolish" or "remove" shall mean historic "removal" or "dismantling".
D. Removed and Salvaged Items:
1. Clean salvaged items.
2. Pack or crate items after cleaning. Identify contents of containers.
3. Store items in a secure area until delivery to The Government.
4. Transport items to The Government's storage area in the park and as designated by The
Government.
5. Protect items from damage during transport and storage.
E. Removed and Reinstalled Items:
1. Clean and repair items to functional condition adequate for intended reuse.
2. Pack or crate items after cleaning and repairing. Identify contents of containers.
3. Protect items from damage during transport and storage.
4. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.
F. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by Contracting Officer, items may be removed to a suitable, protected storage location during selective demolition and cleaned and reinstalled in their original locations after selective demolition operations are complete.
3.4 SELECTIVE DEMOLITION PROCEDURES FOR SPECIFIC MATERIALS
A. Resilient Floor Coverings: Remove floor coverings and adhesive according to recommendations in RFCI's "Recommended Work Practices for the Removal of Resilient Floor Coverings." Do not use methods requiring solvent-based adhesive strippers.
CRLA - 316868 02 41 19 - 5
3.5 DISPOSAL OF DEMOLISHED MATERIALS
A. Remove demolition waste materials from Project site and recycle or dispose of them."
1. Do not allow demolished materials to accumulate on-site.
2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
3. Remove debris from elevated portions of building by chute, hoist, or other device that will convey debris to grade level in a controlled descent.
B. Burning: Do not burn demolished materials.
3.6 CLEANING
A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.
END OF SECTION 02 41 19
CRLA - 316868
06 03 12 - 1
HISTORIC WOOD REPAIR
SECTION 06 03 12 - HISTORIC WOOD REPAIR
1.1 SUMMARY
A. Work for this Project involves the restoration of a historic structure. Treat the building and site respectfully. Carefully respect existing conditions and treat existing materials as irreplaceable.
Do not remove, alter or disfigure any existing materials, elements or finishes unless indicated on the Drawings or in the Specifications. If any work impacts existing materials or finishes to remain, notify Contracting Officer in writing at least ten days in advance of the start of the work, and obtain written response prior to proceeding with the work.
B. Section includes historic treatment of wood in the form of repairing wood features as follows:
1. Repairing interior wood members/trim.
2. Replacing interior wood members/trim.
1.2 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site.
1. Review the Historic Preservation Treatment Plan that pertains to historic wood repair.
2. Review methods and procedures related to historic wood repair, including, but not limited to, the following:
a. Personnel, equipment, and facilities needed to make progress and avoid delays.
b. Materials, material application, sequencing, tolerances, and required clearances.
c. Fire-protection plan.
d. Wood Historic Treatment Program.
1.3 SEQUENCING AND SCHEDULING
A. Perform historic wood repair in the following sequence, which includes work specified in this and other Sections:
1. Before removing wood components for on-site or off-site repair, tag each component with location-identification numbers. Indicate on tags and building plans the locations of each component, such as "Baseboard on North Side of Room 101."
2. Dismantle hardware and tag with location-identification numbers.
3. In the shop, label each repaired component and whole or partial replacement with permanent location-identification number in inconspicuous location and remove site-applied tags.
4. Sort units by condition, separating those that need extensive repair.
5. Clean surfaces.
6. General Wood-Repair Sequence:
a. Remove paint or stain and varnish to bare wood.
CRLA - 316868 06 03 12 - 2
b. Repair wood by consolidation, replacement, partial replacement, and patching.
c. Sand, prime, fill, sand again, and prime surfaces again for refinishing.
7. Reinstall components.
8. Apply finish coats.
1.4 ACTION SUBMITTALS
A. Product Data: For each type of product.
1. Include recommendations for product application and use. Include test data substantiating that products comply with requirements.
B. Sustainable Design Submittals:
1. Product Certificates: For regional materials, indicating location of material manufacturer and point of extraction, harvest, or recovery for each raw material. Include distance to Project and cost for each regional material.
2. Chain-of-Custody Certificates: For wood certified by the Forest Stewardship Council (FSC), Sustainable Forestry Institute (SFI), American Tree Farm System (ATFS), or Program for the Endorsement of Forest Certification (PEFC). Include statement of costs.
3. Chain-of-Custody Qualification Data: For manufacturer and vendor.
C. Shop Drawings:
1. Include plans, elevations, and sections showing locations and extent of repair and replacement work, with enlarged details of replacement parts indicating materials, profiles, joinery, reinforcing, method of splicing or attaching wood members to other surfaces, accessory items, and finishes.
2. Include field-verified dimensions and the following:
a. Full-size shapes and profiles with complete dimensions for replacement components and their jointing, showing relationship of existing components to new components.
b. Templates and directions for installing anchorages.
c. Identification of each new unit and its corresponding location in the building on annotated plans and elevations.
D. Samples for Verification: For the following products in manufacturer's standard sizes unless otherwise indicated, finished as required for use in the Work:
1. Replacement Wood: 12-inch-long, full-size molding sections with applied finish.
a. Additional Samples of replacement members that show fabrication techniques, materials, and finishes as requested by Contracting Officer.
2. Repaired Wood: Prepare Samples using existing wood removed from site, repaired, and prepared for refinishing.
3. Refinished Wood: Prepare Samples using existing wood removed from site, repaired, and refinished.
06 03 12 - 3
1.5 INFORMATIONAL SUBMITTALS
A. Qualification Data: For historic treatment specialist including workers and wood-repair-material manufacturer.
B. Wood Historic Treatment Program: Submit before work begins.
1.6 DELIVERY, STORAGE, AND HANDLING
A. Pack, deliver, and store products in suitable packs, heavy-duty cartons, or wooden crates;
surround with sufficient packing material to ensure that products will not be deformed, broken, or otherwise damaged.
B. Until installed, store products inside a well-ventilated area and protect from weather, moisture, soiling, abrasion, extreme temperatures, and humidity, and where environmental conditions comply with manufacturer's requirements.
1.7 FIELD CONDITIONS
A. Weather Limitations: Proceed with historic wood repair only when existing and forecasted weather conditions are within the environmental limits set by each manufacturer's written instructions and specified requirements.
PART 2 - PRODUCTS
2.1 HISTORIC WOOD REPAIR, GENERAL
A. Quality Standard: Comply with applicable requirements in Section 12, "Historic Restoration Work," and related requirements in AWI/AWMAC/WI's "Architectural Woodwork Standards" for construction, finishes, grade rules, and other requirements unless otherwise indicated.
1. Exception: Industry practices cited in Section 12, Article 1.5, "Industry Practices," of the Contracting Office Rural Woodwork Standards do not apply to the work of this Section.
2.2
REPLICATED WOOD ITEMS
A. Replicated Wood Member/Trim: Custom-fabricated replacement wood units and components.
1. Joint Construction: Joints matching existing joints.
2. Wood Species: Match species and grain of existing wood.
3. Wood Cut: Match cut of existing wood.
4. Wood Member and Trim Profiles: Match profiles and detail of existing.
2.3 WOOD-REPLACEMENT MATERIALS
A. Wood, General: Clear fine-grained lumber; kiln dried to a moisture content of 6 to 12 percent at time of fabrication; free of visible finger joints, blue stain, knots, pitch pockets, and surface checks
06 03 12 - 4 larger than 1/32 inch deep by 2 inches wide.
1. Species: Match species and grain of each existing type of wood component or assembly unless otherwise indicated.
a. Most common existing species is Douglas Fir VG #1.
B. Interior and Exterior Member/Trim: Match existing species and grain.
1. Most common existing species is Douglas Fir VG #1.
2.4 WOOD-REPAIR MATERIALS
A. Source Limitations: Obtain wood consolidant and wood-patching compound from single source from single manufacturer.
B. Wood Consolidant: Ready-to-use product designed to penetrate, consolidate, and strengthen soft fibers of wood materials that have deteriorated due to weathering and decay and designed specifically to enhance the bond of wood-patching compound to existing wood.
1. Manufacturers: Subject to compliance with requirements, provide products manufactured by one of the following:
a. Gougeon Brothers, Inc.; “West System 105 Epoxy Resin,” with hardener as recommended by manufacturer for use in specified applications.
b. ConServ Epoxy; “ConServ Flexible Epoxy Consolidant 100 Original Slow Curing Formula.”
c. Abatron, Inc.; “LiquidWood”
d. Or approved equal.
C. Wood-Patching Compound: Two-part, epoxy-resin, wood-patching compound; knife-grade formulation as recommended in writing by manufacturer for type of wood repair indicated, tooling time required for the detail of work, and site conditions. Compound shall be designed for filling voids in damaged wood materials that have deteriorated due to weathering and decay.
Compound shall be capable of filling deep holes and spreading to featheredge.
1. Manufacturers: Subject to compliance with requirements, provide products manufactured by one of the following:
a. ConServ Epoxy; “ConServ Flexible Wood Filler/Patch 200.”
b. Advanced Repair Technology, Inc; ART’S Epoxy Repair System.
c. Abatron, Inc.; “WoodEpox”.
d. Or approved equal.
2.5 MISCELLANEOUS MATERIALS
A. Borate Preservative Treatment: Inorganic, borate-based solution, with disodium octaborate tetrahydrate as the primary ingredient; manufactured for preserving weathered and decayed wood from further damage caused by fungi and wood-boring insects; complying with AWPA P5;
containing no boric acid.
06 03 12 - 5
1. Manufacturers: Subject to compliance with requirements, provide one of the following:
a. Abatron, Inc.
b. Nisus Corporation.
c. System Three Resins, Inc.
d. Or approved equal.
B. Cleaning Materials:
1. Detergent Solution: Solution prepared by mixing 2 cups of tetrasodium pyrophosphate (TSPP), 1/2 cup of laundry detergent that contains no ammonia, 5 quarts of 5 percent sodium hypochlorite bleach, and 15 quarts of warm water for each 5 gal. of solution required.
2. Mildewcide: Commercial, proprietary mildewcide or a solution prepared by mixing 1/3 cup of household detergent that contains no ammonia, 1 quart of 5 percent sodium hypochlorite bleach, and 3 quarts of warm water.
C. Adhesives: Wood adhesives with minimum 15- to 45-minute cure at 70 deg F, in gunnable and liquid formulations as recommended in writing by adhesive manufacturer for each type of repair and exposure condition.
D. Fasteners: Use fastener metals that are noncorrosive and compatible with each material joined.
1. Match existing fasteners in material and type of fastener unless otherwise indicated.
2. Use concealed fasteners for interconnecting wood components.
3. Use concealed fasteners for attaching items to other work.
2.6 WOOD FINISHES
A. Unfinished Replacement Units: Provide exposed interior wood surfaces of replacement units unfinished; smooth, filled, and suitably prepared for on-site finishing.
PART 3 - EXECUTION
3.1 PREPARATION
A. Protect adjacent materials from damage by historic wood repair.
B. Clean wood of mildew, algae, moss, plant material, loose paint, grease, dirt, and other debris by scrubbing with bristle brush or sponge and detergent solution. Scrub mildewed areas with mildewcide. After cleaning, rinse thoroughly with fresh water. Allow to dry before repairing or painting.
C. Condition replacement wood members and replacement units to prevailing conditions at installation areas before installing.
3.2 HISTORIC WOOD REPAIR, GENERAL
CRLA - 316868 06 03 12 - 6
A. Historic Treatment Appearance Standard: Completed work is to have a uniform appearance as viewed by Contracting Officer from 5 feet away for interior work.
B. General: In treating historic items, disturb them as minimally as possible and as follows:
1. Stabilize and repair wood to reestablish structural integrity and weather resistance while maintaining the existing form of each item.
2. Remove coatings and apply borate preservative treatment before repair.
3. Repair items in place where possible.
4. Install temporary protective measures to protect wood-treatment work that is indicated to be completed later.
5. Refinish historic wood according to Section 09 90 00 "Painting" or Section 09 93 00
“Staining and Transparent Finishing” unless otherwise indicated.
C. Mechanical Abrasion: Where mechanical abrasion is needed for the work, use only the gentlest mechanical methods, such as scraping and natural-fiber bristle brushing, that will not abrade wood substrate, reducing clarity of detail. Do not use abrasive methods, such as sanding, wire brushing, or power tools, except as indicated as part of the historic treatment program and as approved by Contracting Officer.
D. Repair Wood: Match existing materials and features, retaining as much original material as possible to perform repairs.
1. Unless otherwise indicated, repair wood by consolidating, patching, splicing, or otherwise reinforcing wood with new wood matching existing wood or with salvaged, sound, original wood.
2. Where indicated, repair wood by limited replacement matching existing material.
E. Replace Wood: Where indicated, duplicate and replace units with units made from salvaged, sound, original wood or with new wood matching existing species and grain of wood. Use surviving prototypes to create patterns for duplicate replacements.
1. Do not use substitute materials unless otherwise indicated.
2. Compatible substitute materials may be used.
F. Identify removed items with numbering system corresponding to item locations, to ensure reinstallation in same location. Key items to Drawings showing location of each removed unit.
Permanently label units in a location that will be concealed after reinstallation.
3.3 WOOD PATCH-TYPE REPAIR
A. General: Patch wood that exhibits depressions, holes, or similar voids, and that has limited amounts of rotted or decayed wood.
1. Verify that surfaces are sufficiently clean and free of paint residue prior to patching.
2. Treat wood with wood consolidant prior to application of patching compound. Coat wood surfaces by brushing, applying multiple coats until wood is saturated and refuses to absorb more. Allow treatment to harden before filling void with patching compound.
3. Remove rotted or decayed wood down to sound wood.
B. Apply borate preservative treatment to accessible surfaces either before applying wood
06 03 12 - 7 consolidant or after removing rotted or decayed wood. Apply treatment liberally by brush to joints, edges, and ends; top, sides, and bottom. Allow treatment to dry.
C. Apply wood-patching compound to fill depressions, nicks, cracks, and other voids created by removed or missing wood.
1. Prime patch area with application of wood consolidant or manufacturer's recommended primer.
2. Mix only as much patching compound as can be applied according to manufacturer's written instructions.
3. Apply patching compound in layers as recommended in writing by manufacturer until the void is completely filled.
4. Sand patch surface smooth and flush with adjacent wood, without voids in patch material, and matching contour of wood member.
5. Clean spilled compound from adjacent materials immediately.
3.4 WOOD-REPLACEMENT REPAIR
A. General: Replace parts of or entire wood items at locations where damage is too extensive to patch.
1. Remove surface-attached items from wood surface before performing wood-replacement repairs unless otherwise indicated.
2. Verify that surfaces are sufficiently clean and free of paint residue prior to repair.
3. Remove broken, rotted, and decayed wood down to sound wood.
4. Custom fabricate new wood to replace missing wood; either replace entire wood member or splice new wood part into existing member.
5. Secure new wood using finger joints, multiple dowels, or splines with adhesive and nailing to ensure maximum structural integrity at each splice. Use only concealed fasteners. Fill nail holes and patch surface to match surrounding sound wood.
B. Apply borate preservative treatment to accessible surfaces after replacements are made. Apply treatment liberally by brush to joints, edges, and ends; top, sides, and bottom.
C. Repair remaining depressions, holes, or similar voids with patch-type repairs.
D. Clean spilled materials from adjacent surfaces immediately.
E. Reinstall items removed for repair into original locations.
3.5 ADJUSTMENT
A. Adjust existing and replacement operating items, hardware, and accessories for a tight fit at contact points and for smooth operation and tight closure. Lubricate hardware and moving parts.
3.6 CLEANING AND PROTECTION
A. Protect wood surfaces from contact with contaminating substances resulting from construction
06 03 12 - 8 operations. Monitor wood surfaces adjacent to and below exterior concrete and masonry during construction for presence of dirt, scum, alkaline deposits, stains, or other contaminants. If contaminating substances contact wood surfaces, remove contaminants immediately.
B. Clean exposed surfaces immediately after historic wood repair. Avoid damage to coatings and finishes. Remove excess sealants, patching materials, dirt, and other substances.
3.7 HISTORIC WOOD-REPAIR SCHEDULE
A. Members/Trim:
1. Interior: Base that is damaged as a result of carpet replacement.
END OF SECTION 06 03 12
CRLA - 316868 09 68 13 - 1
TILE CARPETING
SECTION 09 680 13 – TILE CARPETING
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2
SUMMARY
A. Section Includes:
1. Modular carpet tile.
B. Related Requirements:
1. Section 02 41 19 "Selective Demolition" for removing existing floor coverings.
2. Section 09 65 13 "Resilient Base and Accessories" Section 09 65 19 "Resilient Tile
Flooring" for resilient wall base and accessories installed with carpet tile.
1.3
DEFINITIONS
A. Pile Thickness: Yarn Tuft heights above top surface of backing.
1.4
PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site.
1. Review methods and procedures related to carpet tile installation including, but not limited to, the following:
a. Review delivery, storage, and handling procedures.
b. Review ambient conditions and ventilation procedures.
c. Review subfloor preparation procedures.
1.5 ACTION SUBMITTALS
A. Product Data: For each type of product.
1. Include manufacturer's written data on physical characteristics, durability, and fade resistance.
2. Include manufacturer's written installation recommendations for each type of substrate.
B. Sustainable Design Submittals:
CRLA - 316868 09 68 13 - 2
1. Product Data: For adhesives, indicating VOC content.
2. Laboratory Test Reports: For adhesives, indicating compliance with requirements for low-emitting materials.
C. Samples: For each of the following products and for each color and texture required. Label each Sample with manufacturer's name, material description, color, pattern, and designation indicated on Drawings and in schedules.
1. Carpet Tile: Full-size Sample.
2. Exposed Edge, Transition, and Other Accessory Stripping: 12-inch long Samples.
D. Product Schedule: Submit a schedule showing daily work plans for the duration of the project.
Indicate what rooms will be carpeted on individual days.
1.6 INFORMATIONAL SUBMITTALS
A. Qualification Data: For Installer.
B. Product Test Reports: For carpet tile, for tests performed by a qualified testing agency.
C. Sample Warranty: For special warranty.
1.7 CLOSEOUT SUBMITTALS
A. Maintenance Data: For carpet tiles to include in maintenance manuals. Include the following:
1. Methods for maintaining carpet tile, including cleaning and stain-removal products and procedures and manufacturer's recommended maintenance schedule.
2. Precautions for cleaning materials and methods that could be detrimental to carpet tile.
1.8 MAINTENANCE MATERIAL SUBMITTALS
A. Furnish extra materials, from the same product run, that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.
1. Carpet Tile: Full-size units equal to 5 percent of amount installed for each type indicated, but not less than 10 sq. yd.
1.9 QUALITY ASSURANCE
A. Installer Qualifications: An experienced installer who is certified by the International Certified Floorcovering Installers Association at the Commercial II certification level.
1.10 DELIVERY, STORAGE, AND HANDLING
A. Comply with the Carpet and Rug Institute's CRI 104.
http://www.arcomnet.com/sustainable_design.aspx?topic=11
CRLA - 316868 09 68 13 - 3
1.11 FIELD CONDITIONS
A. Comply with the Carpet and Rug Institute's CRI 104 for temperature, humidity, and ventilation limitations.
B. Environmental Limitations: Do not deliver or install carpet tiles until spaces are enclosed and weathertight, wet-work in spaces is complete and dry, and ambient temperature and humidity conditions are maintained at levels planned for building occupants during the remainder of the construction period.
C. Do not install carpet tiles over concrete slabs until slabs have cured and are sufficiently dry to bond with adhesive and concrete slabs have pH range recommended by carpet tile manufacturer.
D. Where demountable partitions or other items are indicated for installation on top of carpet tiles, install carpet tiles before installing these items.
1.12 WARRANTY
A. Special Warranty for Carpet Tiles: Manufacturer agrees to repair or replace components of carpet tile installation that fail in materials or workmanship within specified warranty period.
1. Warranty does not include deterioration or failure of carpet tile due to unusual traffic, failure of substrate, vandalism, or abuse.
2. Failures include, but are not limited to, the following:
a. More than 10 percent edge raveling, snags, and runs.
b. Dimensional…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .