A04_Statement_of_Work_Attachments_(to_be_included).pdf
PDF 18 MB Posted
- Attached to
- SD-SAND LAKE NWR-ASBESTOS ABATEMENT
- Solicitation number
- 140FS225Q0022
About this file
The provided file appears to be just a template document title or placeholder named "A04_Statement_of_Work_Attachments_(to_be_included).pdf" and does not contain any actual content to summarize. The file is associated with a Fish and Wildlife Service contract opportunity for asbestos abatement work at Sand Lake National Wildlife Refuge in South Dakota (Solicitation #140FS225Q0022).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140FS225Q0022.pdf | ||
| A03_Statement_of_Work.pdf | ||
| B03_Wage_Determination_Brown_County__SD_12_13_24.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachments:
1. Specifications
2. Building Locations Map
3. Hazardous Materials Survey Report, Sand Lake NWR, Columbia
SD
DESCRIPTION/SPECIFICATIONS
ASBESTOS ABATEMENT
AT
SAND LAKE NWR, COLUMBIA SD
SPECIFICATION INDEX
DIVISION 1 - GENERAL REQUIREMENTS
011100 SUMMARY OF WORK
012900 PAYMENT PROCEDURES
013100 PROJECT MANAGEMENT AND COORDINATION
013233 PHOTOGRAPHIC DOCUMENTATION
013300 SUBMITTAL PROCEDURES
013310 SUBMITTAL COVER TEMPLATE
014000 QUALITY REQUIREMENTS
015000 TEMPORARY FACILITIES AND CONTROLS
017700 CLOSEOUT PROCEDURES
DIVISION 2 – EXISTING CONDITIONS
028233 REMOVAL AND DISPOSAL OF ASBESTOS CONTAINING
MATERIALS
SUMMARY 011000 - 1
SECTION 011000 - SUMMARY
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Project information.
2. Project background.
3. Work covered by Contract Documents.
4. Work under separate contracts.
5. Access to site.
6. Coordination with occupants.
7. Coordination with local utilities.
8. Work restrictions.
9. Permits and Fees.
10. Applicable codes, standards, and specifications.
11. Means and methods.
12. Safety.
13. Environmental Protection.
B. Related Requirements:
1. Section 015000-Temporary Facilities and Controls for limitations and procedures governing temporary use of Government's facilities.
1.2 PROJECT INFORMATION
A. Project Location:
USFWS Sand Lake NWR 39650 Sand Lake Dr Columbia, SD 57433
B. Station Contact Information:
Shilo Comeau, Station Manager Phone: 605-546-8912
Email: shilo_comeau@fws.gov
1.3 PROJECT BACKGROUND
Three building are scheduled for removal from Sand Lake NWR, and have been deter-mined to contain asbestos containing materials (ACM).
SUMMARY 011000 - 2
1.4 WORK COVERED BY CONTRACT DOCUMENTS
Project is to abate asbestos containing materials (ACMs) in three structures prior to build-ing removal or demolition. Site is at Sand Lake National Wildlife Refuge (NWR), near Columbia SD.
1.5 WORK UNDER SEPARATE CONTRACTS
A. General: In the event there is work being performed under a separate contract the Contractor shall cooperate fully with separate contractors so work on those contracts may be carried out smoothly, without interfering with or delaying work under this Contract or other contracts.
Coordinate the Work of this Contract with work performed under separate contracts.
1.6 ACCESS TO SITE
A. All operations of the Contractor (including storage of materials) upon Government premises shall be confined to areas authorized or approved by the Contracting Officer.
B. Limit use of Project site areas within the Contract limits indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.
1.7 COORDINATION WITH OCCUPANTS
A. Full Government Occupancy: Government will occupy site and existing adjacent building(s) during entire project period. Cooperate with Station Manager during operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with Government's day-to-day operations. Maintain existing exits unless otherwise indicated.
1. Notify Station Manager not less than 48 hours in advance of activities that will affect Station operations.
1.8 WORK RESTRICTIONS
A. Work Restrictions, General: Comply with restrictions on operations. Comply with limitations on use of public streets and with other requirements of authorities having jurisdiction.
B. On-Site Work Hours: Limit work in the existing buildings to normal Refuge business working hours Monday through Friday, unless otherwise indicated.
1. Work on weekends will be restricted to Contracting Officers approval and at the Station Managers discretion.
2. No work will take place over Federally observed holidays.
C. Existing Utility Interruptions: Do not interrupt utilities serving occupied facilities unless permitted under the following conditions and then only after providing temporary utility services according to requirements indicated:
SUMMARY 011000 - 3
1. Notify Station Manager not less than 48 hours in advance of proposed utility interruptions.
D. Noise, Vibration, and Odors: Coordinate operations that may result in high levels of noise and vibration, odors, or other disruptions to the Government.
1. Notify Station Manager not less than 48 hours in advance of proposed disruptive operations.
E. Nonsmoking Building: Smoking is not permitted within any buildings or within 25 feet (8 m) of any entrances, operable windows, or outdoor-air intakes.
1.9 COORDINATION WITH LOCAL UTILITIES
A. Not applicable.
1.10 PERMITS AND FEES
A. The Contractor shall be responsible for obtaining all necessary local, State, and Federal permits and licenses, and payment of related fees, per the Contract Clauses.
1.11 APPLICABLE CODES, STANDARDS AND SPECIFICATIONS
A. All work shall comply with the codes and standards applicable to each type of work as listed in individual Sections of these Specifications.
B. Where a conflict occurs between a referenced document and the Project Specifications, the Project Specifications govern.
C. Where a conflict occurs between referenced documents, the document containing the most stringent requirements governs.
D. Where referenced documents are not specified by date, the document current at the bid opening applies.
E. Materials, applications, and tests specified by reference to published standards of society, association, code, or other published standards are included in the specifications as if written in their entirety.
F. Conform to all regulations and statutes of the State of South Dakota and to all Federal Regulations which apply.
1.12 MEANS AND METHODS
A. Means and methods of work shall be such as the Contractor or subcontractors may choose;
subject, however, to the Contracting Officer's right to reject means and methods proposed which:
1. Constitute a hazard to the work, persons, or property.
2. Will not produce finished work in accordance with terms of the contract.
SUMMARY 011000 - 4
3. Are contrary to specified means or methods included in the contract.
B. The right to reject means and methods of the Contractor or subcontractor shall not be construed or interpreted as acceptance of control of means and methods by the Contracting Officer.
C. The Contracting Officer's approval of means and methods or failure to exercise right to reject means and methods shall not relieve the Contractor of the obligation to complete the work required by the contract.
D. Total responsibility for control of all means and methods lies with the Contractor for all work.
1.13 SAFETY
A. The Contractor shall provide, erect and maintain all necessary barricades, suitable and sufficient flasher lights, flagmen, danger signals and signs, and shall take all necessary precautions for the protection of the work and the safety of the public. All ponds and water control structures shall remain accessible by vehicle. Roads closed to traffic shall be protected by effective barricades and shall be placed with acceptable warning signs. All barricades and obstructions shall be illuminated at night and all lights shall be kept burning from sunset until sunrise. Install appropriate traffic signs at crossroads and approaches to site as needed to direct affected public traffic. Specific signs and barricade requirements are detailed in the U.S. Department of Transportation, "Manual on Uniform Traffic Control Devices".
B. The Contractor shall assume full responsibility and liability for compliance with all applicable Federal, State, and local regulations pertaining to the protection of workers, visitors to the site, and persons occupying areas adjacent to the site, including the provisions of 29CFR1910 and 29CFR1926 of the Code of Federal Regulations. The Contractor shall hold harmless the Government for failure to comply with any applicable safety or health regulation on the part of himself, his employees, or his subcontractors.
C. Provide personal safety equipment and training commensurate with the hazards which may exist at the work site. The personal safety equipment and training shall be determined by a thorough hazard analysis of all work site areas. The safety program available at all work sites shall include a minimum of:
1. One nonfreezing-type fire extinguisher in each workshop and shed used for storage of materials at the work site. Place in location readily accessible to contract personnel.
2. A first aid kit for use of contract personnel commensurate with size of project with items necessary for first aid treatment of all injuries.
3. The Contractor shall conduct regular onsite safety inspections and all contract personnel shall receive a safety orientation.
4. Post telephone numbers of nearest hospital, ambulance service or flight for life, and fire station in conspicuous location. Advise all workers of location of telephone numbers.
1.14 ENVIRONMENTAL PROTECTION
A. The Contractor shall abate and control all environmental pollution arising from activities by complying with all applicable Federal, State, and local laws and regulations concerning environmental pollution control and abatement, as well as the specified requirements in this
SUMMARY 011000 - 5
contract. Compliance with this requirement by subcontractors will be the responsibility of the Contractor.
B. Fossils and Artifacts
1. Should the Contractor discover any human remains, fossils or artifacts during operations, such objects shall become the property of the Government. The Contractor shall cease operations in the area of the "find," and immediately notify the Refuge Manager, COR, or Contracting Officer. The Contracting Officer will notify the Regional Archaeologist.
Operations may proceed in other areas not affected by this clause. Care shall be exercised by the Contractor not to damage any human remains, fossils or artifacts uncovered during excavation operations.
2. Failure to comply with this requirement may be considered a violation of the Archeological Resources Protection Act of 1979 as amended, or the Native American Graves Protection and Repatriation Act of 1990. Destruction of historic and prehistoric sites and/or unauthorized collection of cultural materials can result in criminal and/or civil penalties. Penalties can include fines, prison sentences, and/or confiscation of equipment.
3. If the Contractor uses fill from a nongovernmental source to perform work that is required under this project, and a new borrow site is opened or an existing borrow area is expanded as part of this project, then the Contractor needs to inform the Refuge Manager, COR, or CO. The Regional Archaeologist will be informed, and a Section 106 consultation will be required and conducted by USFWS prior to use of the new or expanded borrow site.
C. Abatement of Air Pollution
1. The Contractor shall comply with applicable Federal, State, and local laws and regulations concerning the prevention and control of air pollution.
2. Activities shall be performed in such a manner that air pollution will be held to a minimum.
3. Burning of materials, trees and brush, combustible materials, and rubbish will not be permitted. Debris shall be disposed of at a location designated by the Contracting Officer or hauled off the Station to an approved disposal site.
Prevention of Water Pollution
1. The Contractor is responsible for implementing the terms and requirements of the South Dakota storm water discharge permit, as issued to the State under the National Pollution Discharge Elimination System (NPDES) by the Environmental Protection Agency (EPA).
The Contractor shall apply for and execute all permits as required by the State of South Dakota regarding storm water discharge from the site. The Contractor shall submit to the Contracting Officer a copy of all permit applications and a copy of all approvals from the State. Allow the Government 10 days for review of the application package prior to submission.
2. During operations, the Contractor shall comply with all applicable Federal, State, and local laws and regulations concerning the control and abatement of water pollution.
3. The Contractor's activities shall be performed by methods that will prevent entrance or accidental spillage of solid matter, contaminants, debris, and other objectionable pollutants and wastes into streams, flowing or dry water-courses, lakes, ponds, and underground water sources. The Contractor shall dispose of all pollutants such as petroleum products, SUMMARY 011000 - 6 rubbish, cement, concrete, etc., and objectionable material at a jurisdictionally accepted waste management facility.
4. Sanitary facilities, such as chemical toilets shall be located far enough from wells, live streams, or ponds to prevent pollution of the water.
5. Dewatering work for structure foundations or earthwork operations adjacent to or encroaching on streams or watercourses shall be conducted in a manner that prevents muddy water and eroded materials from entering streams or watercourses. This shall be accomplished by intercepting ditches, bypass channels, barriers, settling ponds, or other approved means. Excavated material shall not be placed in or adjacent to watercourses where it can be washed away by high water or storm runoff.
E. Prevention of site contamination
1. The purpose of this section is to prevent invasive species from being introduced to the project work sites. This includes both plant and animal species. Invasive species can have long last detrimental effects at project sites at US Fish and Wildlife Service lands.
2. Prior to entrance to the work site, all equipment brought on site will be thoroughly washed to remove dirt, seeds, and plant parts. Any equipment that has been any body of water within the past 30 days will be thoroughly cleaned with hot water greater than 140-degree F (typically the temperature found at commercial truck washes) and dried for a minimum of five days before being used at this project site. In addition, before transport-ing equipment from the project site all visible mud, plants and fish/animals will be re-moved, all water will be eliminated, and the equipment will be thoroughly cleaned. Any-thing that came in contact with water will be cleaned and dried following the above pro-cedure.
F. Environmental Litigation: Time lost due to work stoppage because of failure of the Contractor to comply with these requirements may not be the subject of a claim for extension of time, for additional costs, or damages.
END OF SECTION 011000
PAYMENT PROCEDURES 012900 - 1
SECTION 012900 – PAYMENT PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative and procedural requirements necessary to prepare and process Applications for Payment.
1.2 SCHEDULE OF VALUES
A. Coordinate preparation of the schedule of values with preparation of Contractor's schedule.
Submit the schedule of values to Contracting Officer at earliest possible date but no later than ten
(10) days before the date scheduled for submittal of initial Application for Payment.
1.3 APPLICATIONS FOR PAYMENT
A. Each Application for Payment shall be consistent with previous applications and payments as certified by Contracting Officer.
B. Payment Application Times: The date for each progress payment is indicated in the Agreement between Government and Contractor.
C. Initial Application for Payment: Administrative actions and submittals that must precede or coincide with submittal of first Application for Payment include the following:
1. Schedule of values.
2. Submittal schedule (preliminary if not final).
D. Final Payment Application: After completing Project closeout requirements, submit final Application for Payment with releases and supporting documentation not previously submitted and accepted, including, but not limited, to the following:
1. Evidence of completion of Project closeout requirements.
2. Written guarantees, warranties, and certificates.
3. All test reports.
END OF SECTION 012900
PROJECT MANAGEMENT AND COORDINATION 013100 - 1
SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative provisions for coordinating operations on Project including, but not limited to, the following:
1. Coordination drawings.
2. Requests for Information (RFIs).
3. Project meetings.
1.2 DEFINITIONS
A. RFI: Request from Government or Contractor seeking information required by or clarifications of the Contract Documents.
1.3 INFORMATIONAL SUBMITTALS
A. Subcontract List: Prepare a written summary identifying individuals or firms proposed for each portion of the Work, including those who are to furnish products or equipment fabricated to a special design. Include the following information in tabular form:
1. Name, address, and telephone number of entity performing subcontract or supplying products.
2. Number and title of related Specification Section(s) covered by subcontract.
3. Drawing number and detail references, as appropriate, covered by subcontract.
1.4 GENERAL COORDINATION PROCEDURES
A. Coordination: Coordinate operations included in different Sections of the Specifications to ensure efficient and orderly installation of each part of the Work.
1. Provide a schedule noting activities, as needed to convey coordination information to the Contacting Officer, Contacting Officer’s Representative (COR), Government Inspector as well as local staff.
B. Prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings.
PROJECT MANAGEMENT AND COORDINATION 013100 - 2
C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other activities as well as any activities of other contractors to avoid conflicts and to ensure orderly progress of the Work.
1.5 REQUESTS FOR INFORMATION (RFIs)
A. General: Immediately on discovery of the need for additional information or interpretation of the Contract Documents, Contractor shall prepare and submit an RFI in the form specified.
1. The Government will return RFIs as submitted to the Government by other entities controlled by Contractor with no response. RFI’s must come directly from the Contractor.
2. Coordinate and submit RFIs in a prompt manner so as to avoid delays in Contractor's work or work of subcontractors.
B. Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following:
1. Project name.
2. Project number.
3. Date.
4. Name of Contractor.
5. RFI number, numbered sequentially.
6. RFI subject.
7. Specification Section number and title and related paragraphs, as appropriate.
8. Field dimensions and conditions, as appropriate.
9. Contractor's suggested resolution. If Contractor's solution(s) have an impact the Contract
Time or the Contract Sum, Contractor shall state impact in the RFI.
10. Contractor's signature.
11. Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop
Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.
C. The Governments Action: The Government will review each RFI, determine action required, and respond. Allow seven working days for the Government’s response for each RFI. RFIs received after 1:00 p.m. will be considered as received the following working day.
1. The following RFIs will be returned without action:
a. Requests for approval of submittals.
b. Requests for approval of substitutions.
c. Requests for coordination information already indicated in the Contract
Documents.
d. Requests for adjustments in the Contract Time or the Contract Sum.
e. Incomplete RFIs or inaccurately prepared RFIs.
f. Request For Information submitted by a sub-contractor to the Contractor.
2. The Government’s action may include a request for additional information, in which case the time for response will date from time of receipt of additional information.
PROJECT MANAGEMENT AND COORDINATION 013100 - 3
3. The Government’s action on RFIs that may result in a change to the Contract Time or the Contract Sum may be eligible for Contractor to submit Change Proposal.
a. If Contractor believes the RFI response warrants change in the Contract Time or the Contract Sum, notify Contacting Officer and COR in writing within 10 days of receipt of the RFI response.
D. RFI Log: Prepare, maintain, and submit a tabular log of RFIs organized by the RFI number.
Submit log with not less than the following information:
1. Project name.
2. Name and address of Contractor.
3. Name and address of Contacting Officer and COR.
4. RFI number including RFIs that were dropped and not submitted.
5. RFI description.
6. Date the RFI was submitted.
7. Date the Contacting Officer’s response was received.
E. On receipt of the Government’s action, update the RFI log and immediately distribute the RFI response to affected parties. Review response and notify the Government within seven days if Contractor disagrees with response.
1. Identification of related Minor Change in the Work, Change Directive, and Proposal Request, as appropriate.
2. Identification of related Field Order, Work Change Directive, and Proposal Request, as appropriate.
1.6 PROJECT MEETINGS
A. General: The contractor shall coordinate, schedule and conduct regular progress meetings as needed.
1. Attendees: Inform participants and others involved, and individuals whose presence is required, of date and time of each meeting. Notify the Refuge Manager, the Contracting Officer or Specialist and the COR of scheduled meeting dates and times.
2. Agenda: Prepare the meeting agenda. Distribute the agenda to all invited attendees.
3. Minutes: Record significant discussions and agreements achieved. Distribute the meeting minutes to everyone concerned, including the Contracting Officer or Specialist and the COR, Refuge Manager, and other FWS personnel, within three days of the meeting.
B. Pre-Abatement Conference: The Contracting Officer or Specialist will schedule a teleconference before starting abatement actions, at a time convenient to the Contracting Officer, COR, Refuge staff, and Contractor.
1. Attendees: Authorized representatives of the Contracting Officer, COR/Government Project Manager, Refuge staff, and their consultants; Contractor and its superintendent;
major subcontractors; suppliers; and other concerned parties shall attend the conference.
PROJECT MANAGEMENT AND COORDINATION 013100 - 4
Participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work.
2. Agenda: Discuss items of significance that could affect progress, including the following:
a. Tentative schedule.
b. Phasing.
c. Critical work sequencing.
d. Designation of key personnel and their duties.
e. Procedures for processing field decisions and Change Orders.
f. Procedures for RFIs.
g. Procedures for testing and inspecting.
h. Procedures for processing Applications for Payment.
i. Distribution of the Contract Documents.
j. Submittal procedures.
k. Preparation of record documents.
l. Use of the premises and existing buildings.
m. Work restrictions.
n. Working hours.
o. Owner's occupancy requirements.
p. Responsibility for temporary facilities and controls.
q. Procedures for moisture and mold control.
r. Procedures for disruptions and shutdowns.
s. Waste management and disposal.
t. Parking availability.
u. Office, work, and storage areas.
v. Equipment deliveries and priorities.
w. First aid.
x. Security.
y. Progress cleaning.
3. Minutes: The Contracting Officer or Specialist shall be responsible for conducting meeting, recording minutes and distributing the meeting minutes.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 013100
PHOTOGRAPHIC DOCUMENTATION 013233 - 1
SECTION 013233 - PHOTOGRAPHIC DOCUMENTATION
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative and procedural requirements for the following:
1. Pre-abatement photographs.
2. Completion photographs.
B. Related Requirements:
1. Section 017700-Closeout Procedures for submitting photographic documentation as Project Record Documents at Project closeout.
1.2 INFORMATIONAL SUBMITTALS
A. Digital Photographs: Submit unaltered, original, full-size image files within 5 days of taking photographs.
1. Digital Camera: Minimum sensor resolution of 8 megapixels.
2. Digital photographs to be submitted in the order in which they were taken with the photograph “name” as given by the device used to take to photo.
3. Identification: Provide the following information with each image description in file metadata tag:
a. Date and time photograph was taken
b. Unique photograph number
1.3 QUALITY ASSURANCE
A. Photographs to be clear, focused, level, have proper exposure settings (not over exposed or under exposed), and clearly show and document the subject matter. Detail photographs (close-ups) to be preceded by a larger overall view of the area being documented.
1.4 USAGE RIGHTS
A. If a professional photographer is used for this requirement, obtain and transfer copyright usage rights from photographer to Owner for unlimited reproduction of photographic documentation.
PHOTOGRAPHIC DOCUMENTATION 013233 - 2
PART 2 - PRODUCTS
2.1 PHOTOGRAPHIC MEDIA
A. Digital Images: Provide images in JPG format, with minimum size of 8 megapixels.
PART 3 - EXECUTION
3.1 PHOTOGRAPHS
A. Photographer: to be qualified to take progress photographs. An individual familiar with and able to produce clear, focused photographs of the subject area with good reference points.
B. General: Take photographs using the maximum range of depth of field, and that are in focus, to clearly show the Work. Photographs with blurry or out-of-focus areas will not be accepted.
C. Digital Images: Submit digital images exactly as originally recorded in the digital camera, without alteration, manipulation, editing, or modifications using image-editing software.
1. Date and Time: Include date and time in file name for each image.
D. Pre-Abatement Photographs: Before commencement of abatement, take photographs of Project locations.
1. Take minimum of 10 photographs, or as needed, to show existing conditions before starting the Work.
E. Periodic Photographs: Take photographs as needed to fully document the progress. Try to retake progress photos from the same vantage points when possible.
F. Final Completion Photographs: Take color photographs at Substantial Completion for submission as Project Record Documents.
G. Additional Photographs: The Government may request photographs in addition to periodic photographs specified as needed to verify progress or to verify work completion accuracy.
1. Three days' notice will be given, where feasible.
2. In emergency situations, take additional photographs within 24 hours of request.
3. Circumstances that could require additional photographs include, but are not limited to, the following:
a. Special events planned at Project site.
b. Immediate follow-up when on-site events result in damage or losses.
c. Photographs to be taken at fabrication locations away from Project site. These photographs are not subject to unit prices or unit-cost allowances.
d. Substantial Completion of a major phase or component of the Work.
e. Extra record photographs at time of final acceptance.
f. Owner's request for special publicity photographs.
END OF SECTION 013233
SUBMITTAL PROCEDURES 013300 - 1
SECTION 013300 – SUBMITTAL PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes requirements for the submittal schedule and administrative and procedural requirements.
1.2 DEFINITIONS
A. Action Submittals: Written and graphic information and physical samples that require Contracting Officer responsive action.
B. Informational Submittals: Written and graphic information and physical samples that do not require Contracting Officer responsive action. Submittals may be rejected for not complying with requirements.
1.3 ACTION SUBMITTALS
A. Submittal Schedule: Submit a schedule of submittals, arranged in chronological order by dates required. Include time required for review, and additional time required for making corrections or revisions.
1.4 SUBMITTAL ADMINISTRATIVE REQUIREMENTS
A. Coordination: Coordinate preparation and processing of submittals with performance of activities.
1. Coordinate each submittal with related activities that require sequential activity.
2. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.
a. Contracting Officer reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.
B. Processing Time: Allow time for submittal review, including time for resubmittals, as follows.
Time for review shall commence on Contracting Officer receipt of submittal. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing, including resubmittals. Submittals received after 1:00 PM will be considered to having arrived the following day.
1. Initial Review: Allow 10 working days for initial review of each submittal. Allow additional time if coordination with subsequent submittals is required. Contracting Officer will advise Contractor when a submittal being processed must be delayed for coordination.
SUBMITTAL PROCEDURES 013300 - 2
2. Intermediate Review: If intermediate submittal is necessary, process it in same manner as initial submittal.
3. Resubmittal Review: Allow 10 working days for review of each resubmittal.
C. Electronic Submittals: Identify and incorporate information in each electronic submittal file as follows:
1. Name file with submittal number or other unique identifier, including revision identifier.
a. File name shall use a sequential submittal number followed by station initials and Specification Section number (Submittal 001-(Item Name)-(CSI Number)).
Resubmittals shall include a numeric suffix after the submittal number (e.g., Submittal 001-R1-(Item Name)-(CSI Number)).
2. Transmittal Form for Electronic Submittals: Use FWS transmittal form. This form will be made available in PDF.
D. Options: Identify options requiring selection by the Government.
E. Deviations: Identify deviations from the Contract Documents on submittals.
F. Resubmittals: Make resubmittals in same form and number of copies as initial submittal.
1. Note date and content of previous submittal.
2. Note date and content of revision in label or title block and clearly indicate extent of revision.
3. Resubmit submittals until they are marked with approval notation from Contracting
Officer’s action stamp.
4. The contractor is allowed (2) resubmittals for any one item or group of related items for a total of (3) reviews of any given item or group of items. If at that time the contractor has not provided the required, requested information, the Government shall be allowed a credit for additional review time and associated costs.
G. Distribution: Furnish copies of final submittals to others as necessary for performance of activities. Show distribution on transmittal forms.
H. Retain complete copies of submittals on project site. Use only final action submittals that are marked with approval notation from Contracting Officer’s action stamp.
PART 2 - PRODUCTS
2.1 SUBMITTAL PROCEDURES
A. General Electronic Submittal Procedure Requirements:
1. Submit electronic submittals via email as PDF electronic files.
2. PDF files shall be formatted as an 8.5x11 or 11x17 size “sheet” to allow readability and reduce file size.
SUBMITTAL PROCEDURES 013300 - 3
3. Contracting Officer’s Representative, through the Contracting Officer, will return annotated file by e-mail. Annotate and retain one copy of file as an electronic Project record document file.
B. Application for Payment and Schedule of Values: Comply with requirements specified in Section 012900-Payment Procedures.
C. Test and Inspection Reports and Schedule of Tests and Inspections Submittals: Comply with requirements specified in Section 014000-Quality Requirements and complying with requirements in the Contract Documents.
D. Closeout Submittals: Comply with requirements specified in Section 017700-Closeout Procedures.
E. Schedule of Tests and Inspections: Comply with requirements specified in Section 014000- Quality Requirements and complying with requirements in the Contract Documents.
F. Field Test Reports: Submit written reports indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final location, for compliance with requirements in the Contract Documents.
PART 3 - EXECUTION
3.1 CONTRACTOR'S REVIEW
A. Action and Informational Submittals: Review each submittal and check for coordination with other Work of the Contract and for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to Contracting Officer.
B. Project Closeout Submittals: See requirements in Section 017700-Closeout Procedures.
C. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.
3.2 CONTRACTING OFFICER AND CONTRACTING OFFICER’S REPRESENTATIVE
ACTION
A. General: Contracting Officer’s Representative will not review submittals that do not bear Contractor's approval stamp and will return them without action.
B. Action Submittals: Contracting Officer’s Representative will review each submittal, make marks to indicate corrections or revisions required, and return it. Contracting Officer’s Representative will stamp each submittal with an action stamp and will mark stamp appropriately to indicate action as follows:
1. A: Approved as submitted.
2. B: Approved, except as noted. Resubmission not required.
3. C: Approved, except as noted. Resubmission required.
SUBMITTAL PROCEDURES 013300 - 4
4. D: No action taken. See comments on reverse. Resubmission required.
5. E: Disapproved.
6. Other: (comments as noted)
C. Informational Submittals: Contracting Officer’s Representative will review each submittal and will not return it, or will return it if it does not comply with requirements. Contracting Officer’s Representative will forward each submittal to appropriate party.
D. Incomplete submittals are unacceptable, will be considered nonresponsive, and will be returned for resubmittal without review.
E. Submittals not required by the Contract Documents may not be reviewed and may be discarded.
END OF SECTION 013300
U.S. FISH & WILDLIFE SERVICE
Mountain-Prairie Region 6
TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL, SAMPLES,
MANUFACTURER’S CERTIFICATES OF COMPLIANCE FOR REVIEW.
ONLY ONE SPECIFICATION SECTION NUMBER ALLOWED PER SUBMITTAL TRANSMITTAL.
Date Submittal No.
Section I (Contractor) CONTRACTOR SHALL EXPLICITLY INDICATE ANY REQUESTED DEVIATIONS OR SUBSTITUTIONS FROM THE CONTRACT REQUIRMENTS.
To: From: Contract No.:
Previously Submitted on Transmittal No.______________ Edward J Dunn, PE
US Fish & Wildlife Service Regional Engineer Region 6-Division of Engineering
Project and Location:
25-019A Asbestos Abatement at Three Buildings Sand Lake National Wildlife Refuge
It em
N o.
Description (Include Brand or Manufacturer’s Name)
Identify Submittal
No. of Copies
Contract Specification
Para. No.
Contract
Drawing No.
Reg’n Engr Use Only
Action Code*
Name:
(Contractor Project Manager) Contractor certifies s/he has reviewed the plans and specifications, the submittal is in accordance with the contract documents or deviations are clearly identified; individual product characteristics and assemblies have been coordinated with actual field conditions; systems are complete; system and system components can be installed and will function as intended.
Comments: Date Received:
Reviewed By: Signature: Approving Authority: COR - COTR Date:
Action Codes:
A - Approved as Submitted B - Approved As Noted - Resubmission Not Required
C - Approved As Noted - Resubmission Required D - No Action Taken - See Comments, Resubmission Required.
E - Rejected – See Comments, Resubmission Required.
O - Other: ___________________________
Distribution: Regional Engineer/Contract File Inspector’s File Contractor
FORM NUMBER R1-67, REVISED 10/93
QUALITY REQUIREMENTS 014000 - 1
SECTION 014000 - QUALITY REQUIREMENTS
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative and procedural requirements for quality assurance and quality control.
B. Testing and inspecting services are required to verify compliance with requirements specified or indicated. These services do not relieve Contractor of responsibility for compliance with the Contract Document requirements.
1. Specified tests, inspections, and related actions do not limit Contractor's other quality-assurance and -control procedures that facilitate compliance with the Contract Document requirements.
2. Requirements for Contractor to provide quality-assurance and -control services required by Contracting Officer or authorities having jurisdiction are not limited by provisions of this Section.
3. Specific test and inspection requirements are not specified in this Section.
1.2 DEFINITIONS
A. Quality-Assurance Services: Activities, actions, and procedures performed before and during execution of the Work to guard against defects and deficiencies and substantiate that proposed work will comply with requirements.
B. Quality-Control Services: Tests, inspections, procedures, and related actions during and after execution of the Work to evaluate that actual products incorporated into the Work and completed work will comply with requirements. Services do not include contract enforcement activities performed by Contracting Officer.
C. Field Quality-Control Testing: Tests and inspections that are performed on-site for installation of the Work and for completed Work.
D. Testing Agency: An entity engaged to perform specific tests, inspections, or both. Testing laboratory shall mean the same as testing agency.
E. Installer/Applicator/Erector: Contractor or another entity engaged by Contractor as an employee, Subcontractor, or Sub-subcontractor, to perform a particular operation, including installation, erection, application, and similar operations.
F. Experienced: When used with an entity or individual, "experienced" means having successfully completed a minimum of five previous projects similar in nature, size, and extent to this Project;
being familiar with special requirements indicated; and having complied with requirements of authorities having jurisdiction.
QUALITY REQUIREMENTS 014000 - 2
1.3 CONFLICTING REQUIREMENTS
A. Referenced Standards: If compliance with two or more standards is specified and the standards establish different or conflicting requirements for minimum quantities or quality levels, comply with the most stringent requirement. Refer conflicting requirements that are different, but apparently equal, to Contracting Officer for a decision before proceeding.
B. Minimum Quantity or Quality Levels: The quantity or quality level shown or specified shall be the minimum provided or performed. The actual installation may comply exactly with the minimum quantity or quality specified, or it may exceed the minimum within reasonable limits.
To comply with these requirements, indicated numeric values are minimum or maximum, as appropriate, for the context of requirements. Refer uncertainties to Contracting Officer for a decision before proceeding.
1.4 INFORMATIONAL SUBMITTALS
A. Testing Agency Qualifications: For testing agencies specified in "Quality Assurance" Article to demonstrate their capabilities and experience. Include proof of qualifications in the form of a recent report on the inspection of the testing agency by a recognized authority.
1.5 REPORTS AND DOCUMENTS
A. Test and Inspection Reports: Prepare and submit certified written reports specified in other Sections. Include the following:
1. Date of issue.
2. Project title and number.
3. Name, address, and telephone number of testing agency.
4. Dates and locations of samples and tests or inspections.
5. Names of individuals making tests and inspections.
6. Description of the Work and test and inspection method.
7. Identification of product and Specification Section.
8. Complete test or inspection data.
9. Test and inspection results and an interpretation of test results.
10. Record of temperature and weather conditions at time of sample taking and testing and inspecting.
11. Comments or professional opinion on whether tested or inspected Work complies with the
Contract Document requirements.
12. Name and signature of inspector.
13. Recommendations on retesting and reinspecting.
B. Permits, Licenses, and Certificates: For Owner's records, submit copies of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, correspondence, records, and similar documents, established for compliance with standards and regulations bearing on performance of the Work.
QUALITY REQUIREMENTS 014000 - 3
1.6 QUALITY ASSURANCE
A. General: Qualifications paragraphs in this article establish the minimum qualification levels required; individual Specification Sections specify additional requirements.
B. Specialists: Certain Specification Sections require that specific activities shall be performed by entities who are recognized experts in those operations. Specialists shall satisfy qualification requirements indicated and shall be engaged for the activities indicated.
1. Requirements of authorities having jurisdiction shall supersede requirements for specialists.
C. Testing Agency Qualifications: An NRTL, an NVLAP, or an independent agency with the experience and capability to conduct testing and inspecting indicated and with additional qualifications specified in individual Sections; and, where required by authorities having jurisdiction, that is acceptable to authorities.
1. NRTL: A nationally recognized testing laboratory according to 29 CFR 1910.7.
2. NVLAP: A testing agency accredited according to NIST's National Voluntary Laboratory
Accreditation Program.
D. Contractor Responsibilities: Tests and inspections not explicitly assigned to Government are Contractor's responsibility. Perform additional quality-control activities required to verify that the Work complies with requirements, whether specified or not.
1. Where services are indicated as Contractor's responsibility, engage a qualified testing agency to perform these quality-control services.
a. Contractor shall not employ same entity engaged by Owner, unless agreed to in writing by Owner.
2. Notify testing agencies at least 24 hours in advance of time when Work that requires testing or inspecting will be performed.
3. Where quality-control services are indicated as Contractor's responsibility, submit a certified written report, in duplicate, of each quality-control service.
4. Testing and inspecting requested by Contractor and not required by the Contract Documents are Contractor's responsibility.
E. Retesting/Reinspecting: Regardless of whether original tests or inspections were Contractor's responsibility, provide quality-control services, including retesting and reinspecting, for actions that replaced Work that failed to comply with the Contract Documents.
F. Testing Agency Responsibilities: Cooperate with Contracting Officer and Contractor in performance of duties. Provide qualified personnel to perform required tests and inspections.
1. Notify Contracting Officer and Contractor promptly of irregularities or deficiencies observed in the Work during performance of its services.
2. Determine the location from which test samples will be taken and in which in-situ tests are conducted.
3. Conduct and interpret tests and inspections and state in each report whether tested and inspected work complies with or deviates from requirements.
QUALITY REQUIREMENTS 014000 - 4
4. Submit a certified written report, in duplicate, of each test, inspection, and similar quality-control service through Contractor.
5. Do not release, revoke, alter, or increase the Contract Document requirements or approve or accept any portion of the Work.
6. Do not perform any duties of Contractor.
G. Associated Services: Cooperate with agencies performing required tests, inspections, and similar quality-control services, and provide reasonable auxiliary services as requested. Notify agency sufficiently in advance of operations to permit assignment of personnel.
H. Coordination: Coordinate sequence of activities to accommodate required quality-assurance and -control services with a minimum of delay and to avoid necessity of removing and replacing work to accommodate testing and inspecting.
1. Schedule times for tests, inspections, obtaining samples, and similar activities.
1.7 SPECIAL TESTS AND INSPECTIONS
A. Special Tests and Inspections: Conducted by a qualified testing agency or special inspector as required by authorities having jurisdiction, as indicated in individual Specification Sections and as follows:
1. Verifying that manufacturer maintains detailed fabrication and quality-control procedures and reviews the completeness and adequacy of those procedures to perform the Work.
2. Notifying Contracting Officer and Contractor promptly of irregularities and deficiencies observed in the Work during performance of its services.
3. Submitting a certified written report of each test, inspection, and similar quality-control service to Contracting Officer with copy to Contractor and to authorities having jurisdiction.
4. Submitting a final report of special tests and inspections at Substantial Completion including a list of unresolved deficiencies.
5. Interpreting tests and inspections and stating in each report whether tested and inspected work complies with or deviates from the Contract Documents.
6. Retesting and reinspecting corrected work.
7. Any other tests that were performed for the project.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 TEST AND INSPECTION LOG
A. Test and Inspection Log: Prepare a record of tests and inspections. Include the following:
1. Date test or inspection was conducted.
2. Description of the Work tested or inspected.
3. Date test or inspection results were transmitted to Contracting Officer.
QUALITY REQUIREMENTS 014000 - 5
4. Identification of testing agency or special inspector conducting test or inspection.
B. Maintain log at Project site. Post changes and revisions as they occur. Provide access to test and inspection log for Architect's reference during normal working hours.
3.2 REPAIR AND PROTECTION
A. General: On completion of testing, inspecting, sample taking, and similar services, repair damages and restore substrates and finishes.
1. Provide materials and comply with installation requirements specified in other Specification Sections or matching existing substrates and finishes. Restore patched areas and extend restoration into adjoining areas with durable seams that are as invisible as possible. Comply with the Contract Document requirements for cutting and patching as per the specifications.
B. Protect construction exposed by or for quality-control service activities.
C. Repair and protection are Contractor's responsibility, regardless of the assignment of responsibility for quality-control services.
END OF SECTION 014000
TEMPORARY FACILITIES AND CONTROLS 015000 - 1
SECTION 015000 – TEMPORARY FACILITIES AND CONTROLS
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes requirements for temporary utilities, support facilities, and security and protection facilities.
B. Related Requirements:
1. Section 011000-Summary for work restrictions and limitations on utility interruptions.
1.2 USE CHARGES
A. General: Installation and removal of and use charges for temporary facilities shall be included in the Contract Sum unless otherwise indicated. Allow other entities to use temporary services and facilities without cost, including, but not limited to testing agencies, and authorities having jurisdiction.
B. Water and Sewer Service from Existing System:
1. Potable and Non-potable water from Governments existing water system is available for use without metering and without payment for uses directly related to the project. Provide connections and extensions of services as required for operations.
2. Sanitary Facilities: Use of Government existing toilet facilities will be permitted.
Contractor shall comply with the requirements within this section for temporary sanitary facilities.
C. Electric Power Service from Existing System:
1. Electric power from Stations existing system is available for use without metering and without payment for use directly related to the project. Provide connections and extensions of services as required for operations.
1.3 QUALITY ASSURANCE
A. Electric Service: Comply with NECA, NEMA, and UL standards and regulations for temporary electric service. Install service to comply with NFPA 70.
B. Tests and Inspections: Arrange for authorities having jurisdiction to test and inspect each temporary utility before use. Obtain required certifications and permits.
C. Accessible Temporary Egress: Comply with applicable provisions in the U.S. Architectural & Transportation Barriers Compliance Board's ADA-ABA Accessibility Guidelines and
ICC/ANSI A117.1.
TEMPORARY FACILITIES AND CONTROLS 015000 - 2
1.4 PROJECT CONDITIONS
A. Temporary Use of Permanent Facilities: Engage Installer of each permanent service to assume responsibility for operation, maintenance, and protection of each permanent service during its use before Governments acceptance, regardless of previously assigned responsibilities.
PART 2 - PRODUCTS
2.1 TEMPORARY FACILITIES
A. Field Offices, General: Prefabricated or mobile units with serviceable finishes, temperature controls, and foundations adequate for normal loading.
B. Storage and Fabrication Sheds: Provide sheds sized, furnished, and equipped to accommodate materials and equipment for operations.
2.2 EQUIPMENT
A. Fire Extinguishers: Portable, UL rated; with class and extinguishing agent as required by locations and classes of fire exposures.
PART 3 - EXECUTION
3.1 INSTALLATION, GENERAL
A. Locate facilities where they will serve Project…