This is a Statement of Work for commercial HVAC services at D.C. Booth National Fish Hatchery in Spearfish, South Dakota (PR Number: 0044053473).

The contractor must furnish and install a replacement air conditioning system, specifically a Carrier 12-ton unit with a minimum 12 SEER rating (brand name or equal). The existing compressor, installed in 1995 and over 30 years old, has failed, causing interior temperatures to exceed 94°F and threatening historical artifacts in the Administration/Archives Building. The contractor shall supply all labor, materials, equipment, and supervision necessary to remove the existing HVAC equipment and provide complete installation of a new compressor, coil, and line set compatible with existing infrastructure. Work scope includes testing and confirming electrical circuits and breakers, updating the evaporator coil line set and condensing unit to comply with Clean Air Act sections 608 and 609, performing all required plumbing and electrical work per code, repairing any wall or building finishes disturbed during installation, and properly disposing of existing equipment per environmental regulations. The contractor must possess all State of South Dakota licenses and certifications required for commercial HVAC installation and repair, and all work must comply with applicable federal, state, and local laws, regulations, and codes.

Performance shall occur at the hatchery location, with normal duty hours Monday through Friday 8:00 a.m. to 4:30 p.m., and work must be completed as soon as practicable after award. Deliverables include the installed compressor meeting or exceeding specified requirements, all procured components for system installation, and testing documentation of final system configuration. The contractor must provide a one-year warranty covering labor and equipment defects. Government acceptance is contingent upon U.S. Fish and Wildlife Service representatives confirming proper installation per contract requirements, removal and disposal of existing equipment, and provision of warranty documentation and operating manuals. The primary technical coordinator is Carlos Martinez, Project Leader at 605.642.7730 x223, with secondary coordination through Kristopher Johnson, Facility Management Coordinator, at 435-299-5150.

View the file

Other files for this federal contract opportunity

Other files attached to SD - D. C. Booth Historic NFH - AC Replacement, newest first.
File Type Posted
Sol_140FS226Q0147_Amd_0002.pdf PDF
B09_-_Supplemental_Information_for_Quoters_0002_0002.pdf PDF
A04_-_Statement_of_Work___AC_Compressor_Replacement_-_0001_0001.pdf PDF
Sol_140FS226Q0147_Amd_0001.pdf PDF
Sol_140FS226Q0147.pdf PDF
B03_-_Service_Contract_Act_WD___2015-5377_-_Rev_31.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Commercial Service

Air Conditioning (AC) Compressor Replacement Administration/Archives Building

PR Number: 0044053473

1. General:

1.1 D.C. Booth National Fish Hatchery (NFH), 423 Hatchery Circle, Spearfish, SD 57783- 2643. Service, Air Conditioning (AC) Compressor replacement.

1.2 Purpose/End Application: The purpose of this project is to restore reliable climate control for building occupants and to protect historical artifacts housed within the Administration/Archives Building. Interior temperatures have exceeded 94°F due to the failure of the existing HVAC system. Installed in 1995, the current compressor failed and was over 30 years old. Repairing the current unit is not practical as it is obsolete. The Contractor shall furnish and install a new compressor, coil, and line set (brand name or equal) including all associated components required for a complete and operational installation. The new system shall connect to the existing HVAC, electrical, and piping infrastructure and utilize EPA-compliant refrigerant in accordance with current regulations.

1.3 Contractor Qualifications: The Contractor shall possess all licenses and certifications required by the State of South Dakota to perform commercial HVAC installation and repair. All work shall be performed by qualified personnel and comply with applicable manufacturer requirements and industry standards.

1.4 Other: The Contractor shall comply with all applicable Federal, State, and local laws, regulations, codes, and permit requirements.

2. Place of Performance and Period of Performance

2.1 Work is to be performed at D.C. Booth National Fish Hatchery (NFH), 423 Hatchery Circle, Spearfish, SD 57783-2643.

2.2 The Contractor shall complete all work as soon as practicable after award in accordance with the contract period of performance.

2.3 Normal duty hours Monday through Friday 8:00 a.m. - 4:30 p.m. or additional time frames with prior approval from the station. In the event of emergencies, Contractor shall provide contact information.

2.4 Nonduty hours include week nights, weekends, and Government holidays (New Year’s Day, Martin Luther King Jr’s Birthday, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day, Christmas Day).

3. Scope

The Contractor shall furnish all labor, supervision, equipment, materials, transportation, and incidentals necessary to remove the existing HVAC equipment and provide a complete installation of a new AC compressor, coil, and line set.

3.1 The contractor shall replace AC compressor and associated devices.

3.1.2 The contractor shall furnish and install one (1) Carrier, 12 ton, minimum 12 SEER Air Conditioning (AC) brand name or equal. The replacement compressor shall meet or exceed the performance, capacity, and operational requirements of the existing unit shown in the photograph below. The Contractor shall verify existing site conditions and provide a compatible replacement unit capable of integration with the existing HVAC system. The Contractor shall include all labor, materials, equipment, removal, installation, startup, and testing required for a complete and operational system. meeting or exceeding the minimum requirements specified in this Statement of Work and connect to existing HVAC system.

3.1.3 The contractor shall test and confirm circuits and breakers in existing control panel.

3.1.4 The contractor shall update evaporator coil line set and condensing unit to comply with the applicable requirements of sections 608 and 609 of the Clean Air Act.

3.1.5 All plumbing and electrical as required by code

3.1.6 Repair any wall or building finishes disturbed during installation, including patching and painting to match existing surfaces as closely as practical.

3.1.7 Remove and properly dispose of the existing air conditioning equipment in accordance with all applicable environmental regulations.

4. Deliverables and/or Delivery Schedule:

4.1 (1) new compressor meeting or exceeding the minimum requirements specified in this Statement of Work

4.2 The contractor shall procure all components required for the installation of a new AC compressor unit, associated devices, and connection to existing HVAC system.

4.3. Testing documentation of final system installation and configuration.

4.4 Contractor shall provide a one-year warranty that the system will be free of defects: labor and equipment.

5. Government-Furnished Equipment (GFE) / Government-Furnished Information (GFI)

5.1 DC Booth NFH will provide restrooms, electricity, and water for the contractor to using while the contracted work is being completed.

7. Evaluation and Acceptance

7.1 The contractor will be evaluated as detailed herein. Government acceptance is contingent upon designated U.S. Fish and Wildlife Service representative(s) determining the HVAC system has been completely installed in accordance with the contract requirements, the existing equipment has been removed and properly disposed of, and warranty documentation, operating manuals, and other required closeout documentation have been provided.

8. Quality Control/Quality Assurance:

8.1 The Contractor shall maintain a quality control program sufficient to ensure all work complies with contract requirements, applicable building codes, manufacturer installation instructions, and industry standards. The Government reserves the right to inspect work at any time. Any deficiencies identified shall be corrected by the Contractor at no additional cost to the Government.

9. Technical Coordinator:

9.1 Primary individual responsible for the final product or service.

Carlos Martinez Project Leader 423 Hatchery Circle Spearfish, SD 57783-2643 Office: 605.642.7730 x223 carlos_martinez@fws.gov

9.2 Secondary individual responsible for the final product or service.

Kristopher “Kris” Johnson Facility Management Coordinator (FMC) Asset Management Coordinator (AMC) U.S. Fish and Wildlife Service Fish and Aquatic Conservation (FAC) 1380 South 2350 West Vernal, UT 84078 Cell: 435-299-5150 mailto:carlos_martinez@fws.gov

Office: 435-789-0351 ext. 16 kristopher_b_johnson@fws.gov

Image: Current AC compressor unit requiring replacement mailto:kristopher_b_johnson@fws.gov

File details come from the government source that posted it. Updated .