A04_Specifications.pdf

PDF 116 KB Posted

Attached to
SUPPLY ADA BACKCOUNTRY TOILET BUILDING KIT - Death
Solicitation number
140P8123Q0078
Issued by

About this file

This document outlines specifications for a federal contract solicitation. The National Park Service Pacific West Region is soliciting bids to supply one ADA wheelchair accessible backcountry toilet building kit with a behind-the-wall urine diversion conveyor system, storage vault with access hatch, and single pipe urine diversion drain-field to be installed at Homestake Dry Camp in Death Valley National Park. The kit must meet specified product requirements and be delivered between July 31, 2023 and October 30, 2023 to the Cow Creek Maintenance Yard in Furnace Creek, California. The delivery contact is Brent Smith who can be reached at 760-786-3250 or brent_smith@nps.gov and requires 48-hour advance notice. Delivery is only allowed Monday through Thursday between 7:00 am to 3:30 pm Pacific time, excluding weekends, holidays and after 3:30 pm.

View the file

Other files

File Type Posted
Sol_140P8123Q0078.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS

Supply one (1) ADA wheelchair accessible backcountry toilet building kit with a behind-the-wall urine diversion conveyor system, storage vault with access hatch, and single pipe urine diversion drain-field to Death Valley National Park. Building kit to be installed and maintained at Homestake Dry Camp, a remote, difficult to access primitive campground.

Product Specifications (Basis of specification: Wishbone Toilet Building kit from Toilet Tech

Solutions OR APPROVED EQUAL

• Forest Series (shed-style roof), single-stalled, wheelchair accessible, ADA outhouse building with extension, aluminum floor and frame with recycled plastic T&G wall board.

▪ Frame and hatch colored oil rubbed bronze and the wallboard: walnut.

• Features a behind-the-wall urine-diverting conveyor toilet system with a white, fiberglass riser and foot operated conveyor advance system.

▪ The system connects to the “silver” package drain-field comprised of a urine settling tank, EZ Flow drain-field pipe and all components and parts to complete the system and connect it to the urine diversion toilet.

• Includes a vault kit (under the hatch), together with foundation, walls and floor to house Waste Away sacks (included) to catch and contain solid waste for removal.

Delivery Details:

• Delivery Location: Cow Creek Maintenance Yard, 579 Cow Creek Service Road, Furnace Creek, CA, 92328

• Delivery Contact: Brent Smith 760-786-3250 brent_smith@nps.gov

• NPS must receive 48-hour notice in advance of delivery (brent_smith@nps.gov).

• Allowable delivery Times: Monday-Thursday, 7:00 am – 3:30 pm (Pacific). No delivery on weekends (inc. Friday), government holidays, or after 3:30 pm (Pacific) will be accepted.

• The ADA wheelchair accessible backcountry toilet with a behind-the-wall urine diversion conveyor system, storage vault with access hatch, and single pipe urine diversion drain-field must be delivered to Death Valley National Park between July 31, 2023 and October 30, mailto:brent_smith@nps.gov mailto:brent_smith@nps.gov

File details come from the government source that posted it. Updated .