This document outlines specifications for supplying a wheelchair accessible backcountry toilet building kit to Death Valley National Park. The solicitation calls for one ADA compliant shed-style outhouse with a urine-diverting conveyor toilet system, storage vault, and single pipe urine diversion drainfield. The product basis of specification is the Wishbone Toilet Building kit from Toilet Tech Solutions or approved equal. The building kit must be delivered to the Cow Creek Maintenance Yard between July 31, 2023 and October 30, 2023, with 48-hour notice provided. The related federal contract opportunity is solicitation number 140P8123Q0078 for the supply and delivery of the toilet building kit to Death Valley National Park, issued by the Department of the Interior National Park Service Pacific West Region.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS

Supply one (1) ADA wheelchair accessible backcountry toilet building kit with a behind-the-wall urine diversion conveyor system, storage vault with access hatch, and single pipe urine diversion drain-field to Death Valley National Park. Building kit to be installed and maintained at Homestake Dry Camp, a remote, difficult to access primitive campground.

Product Specifications (Basis of specification: Wishbone Toilet Building kit from Toilet Tech

Solutions OR APPROVED EQUAL

• Forest Series (shed-style roof), single-stalled, wheelchair accessible, ADA outhouse building with extension, aluminum floor and frame with recycled plastic T&G wall board.

▪ Frame and hatch colored oil rubbed bronze and the wallboard: walnut.

• Features a behind-the-wall urine-diverting conveyor toilet system with a white, fiberglass riser and foot operated conveyor advance system.

▪ The system connects to the “silver” package drain-field comprised of a urine settling tank, EZ Flow drain-field pipe and all components and parts to complete the system and connect it to the urine diversion toilet.

• Includes a vault kit (under the hatch), together with foundation, walls and floor to house Waste Away sacks (included) to catch and contain solid waste for removal.

Delivery Details:

• Delivery Location: Cow Creek Maintenance Yard, 579 Cow Creek Service Road, Furnace Creek, CA, 92328

• Delivery Contact: Brent Smith 760-786-3250 brent_smith@nps.gov

• NPS must receive 48-hour notice in advance of delivery (brent_smith@nps.gov).

• Allowable delivery Times: Monday-Thursday, 7:00 am – 3:30 pm (Pacific). No delivery on weekends (inc. Friday), government holidays, or after 3:30 pm (Pacific) will be accepted.

• The ADA wheelchair accessible backcountry toilet with a behind-the-wall urine diversion conveyor system, storage vault with access hatch, and single pipe urine diversion drain-field must be delivered to Death Valley National Park between July 31, 2023 and October 30, mailto:brent_smith@nps.gov mailto:brent_smith@nps.gov

File details come from the government source that posted it. Updated .