About this file

This statement of work outlines requirements for uninterrupted power supply unit service. The contractor shall inspect all components of one Galaxy 3000 UPS unit located at the Carson City District Office, replace batteries if needed, and return the system to full functionality. The performance period is 30 days from award with an option to extend an additional month. Work must be completed during normal business hours excluding federal holidays. The contractor must remove all equipment and debris upon job completion and is responsible for providing all necessary parts and labor as the government will not furnish any property.

View the file

Other files for this federal contract opportunity

Other files attached to CCDO UNINTERRUPTED POWER SUPPLY (UPS) UNIT SERVICE, newest first.
File Type Posted
B12_Q_A_TO_SOLICITATION_140L3923Q0153_0001.docx DOCX document
Sol_140L3923Q0153_Amd_0001.pdf PDF
Sol_140L3923Q0153.pdf PDF
B03_Service_Contract_Act_WD_2015-5591.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW)

AND TECHNICAL SPECIFICATONS

FOR

Title of Requirement

AT

Carson City District Office 5665 Morgan Mill Road Carson City, NV. 89701

Date 09/07/2022

(NOTE TO THE WRITER: TAILOR THIS SOW TO YOUR LOCATION AND THE UNIQUE REQUIREMENTS AND QUANTITIES FOR YOUR WORKLOAD ESTIMATES. GRAY HIGHLIGHTS INDICATE WHERE YOUR INPUT IS REQUIRED. WHEN TAILORED SOW IS COMPLETE, DELETE ALL RED NOTATIONS.)

TABLE OF CONTENTS

SECTION PAGE

1. DESCRIPTION OF SERVICES 3

2. GENERAL INFORMATION 3

3. SERVICE SUMMARY 4

4. GOVERNMENT FURNISHED PROPERTY AND SERVICE 4

5. APPENDICES (AS APPLICABLE) 5

Statement of Work For Carson City District Uninterrupted Power Supply

DESCRIPTION OF SERVICES: Provide all necessary labor, equipment, and materials to Perform annul service MGE Galaxy 3000 Uninterrupted Power Supply (UPS) unit. Replace batteries if needed.

Period Of Performance: Performance period for this contract will be no more than 30 days from the date of award and will run continuously for 2 months with the provision for 1 extension(s) of this contract for an additional 1-month period.

Place Of Performance: Carson City District Office, 5665 Morgan Mill Road, Carson City NV. 89701

Specific Requirements: The contractor shall perform the following tasks:

Inspect all circuit boards, and connections Inspect all power connections Inspect all subassemblies, bridges, and legs for signs of defects and/or stress Inspect all DC and AC capacitors for leakage Inspect all batteries for leakage, low voltage.

Replace any batteries that is deemed no longer serviceable and recycle non-serviceable batteries according to applicable laws and regulations.

Low Battery alarm

Power down UPS Unit. Inspect batteries and other electrical components. Replace batteries if needed. Bring system back on-line.

Fully functional UPS Unit.

GENERAL INFORMATION:

Shipping and Delivery:

Hazardous Materials: The Contractor is required to submit hazardous materials data whenever the supplies being acquired are identified as hazardous materials. The latest version of Federal Standard No. 313 (Material Safety Data Sheet, Preparation and Submission of) includes criteria for identification of hazardous materials. Hazardous material data (Material Safety Data Sheets (MSDS)) shall be submitted by the Contractor prior to contract award if hazardous materials are expected to be used during contract performance.

1.1. Schedule: The Contractor shall work during normal duty hours between 0800 – 1630 Monday- Friday. The Contractor shall not work during Federal holidays as listed below, if the holiday falls on a Saturday, it is observed on Friday. The Contractor shall not work when Carson City District Office is officially closed by the District Manager or their acting, or under an emergency, or special event service.

Labor Day, September 7, 2015 Columbus Day, October 12, 2015 Veterans Day, November 11, 2015 Thanksgiving Day, November 26, 2015 Christmas Day, December 25, 2015 New Year’s Day, January 1, 2016 Birthday of Martin Luther King, Jr., January 18, 2016 Washington’s Birthday, February 15, 2016 Memorial Day, May 30, 2016 Independence Day, July 4, 2016

Site Clean-Up and Restoration: The contractor shall ensure the work site areas and around the work site are free of any debris and materials upon completion of work each day, as well as at the completion of the job. The Contractor shall remove and properly dispose of all materials and equipment at the completion of the job.

GOVERNMENT FURNISHED PROPERTY (GFP) AND SERVICES:

No Government furnish property. Contractor will provide all parts and labor.

APPENDICES:

A. Photo of Battery Compartment Door with UPS Unit information.

B. Picture of current batteries installed in the unit.

Photo “A”

Photo “B”

Measurements Workload estimates image1.png image2.png