This document outlines the scope of work for a federal contract to test and maintain fire hydrants within Lake Mead National Recreation Area. The contract requires testing 99 fire hydrants across three locations according to NFPA 25 standards, maintaining hydrant components as needed, exercising hydrant valves, removing vegetation and debris, cleaning and lubricating hydrant threads, and submitting test reports. The contractor must complete all work within 90 calendar days. Key responsibilities include testing hydrant pressure and flow, inspecting and servicing hydrant caps, valves and other components, and reporting findings on hydrant status, maintenance performed, and any repairs required. The solicitation for this contract opportunity was issued by the National Park Service's Pacific West Region to fulfill the scope of work described in the document.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B09_Question_and_Answer_0001.docx | DOCX document | |
| Sol_140P8121Q0104_Amd_0001.pdf | ||
| Combined_RFQ_140P8121Q0104.pdf | ||
| B03_SCA_Wage_Rate_2015-5593_Clark_County__Nevada.pdf | ||
| B03_SCA_Wage_Rate_2015-5467_Mohave_County__Arizona.pdf | ||
| Sol_140P8121Q0104.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LAKE 249129 Page 1 of 11
LAKE MEAD NATIONAL RECREATION AREA
BOULDER CITY, NEVADA
TEST AND MAINTAIN HYDRANTS AT BOULDER BEACH, KATHERINE LANDING
AND LAS VEGAS BAY
LAKE – 249129
PROJECT SPECIFICATIONS
NATIONAL PARK SERVICE
August 10, 2021
LAKE 249129 Page 2 of 11
DIVISION 1 GENERAL REQUIREMENTS
SECTION 01110 SUMMARY OF WORK
1.1 EXISTING CONDITIONS
The Project location is the Lake Mead National Recreation Area. The site is located in the Boulder Beach and Las Vegas Bay area located near Boulder City, Nevada and Katherine Landing area located near Bullhead City, Arizona.
1.2 GENERAL PROJECT STATEMENT
A. The project requires hydrant testing and valve exercising hydrants.
B. Report shall be provided of test results.
C. Perform maintenance as needed on Fire Hydrants.
D. See maps for project locations.
1.3 SCOPE OF WORK
The scope of work for this contract consists of:
A. Test hydrants per National Fire Protection Association (NFPA) Section 25 (Standard for the Inspection, Testing and Maintenance of Water Based Fire Protection Systems) 2020 Edition.
B. Report of Findings for each hydrant:
1. Prepare report for submission to the NPS.
2. See example report for information needed. Example attached.
3. Required but not limited to: location Number, Static Pressure, Residual Pressure, Fire flow available, Manufacturer, diameter, Residual Flow, any required maintenance or repair to bring component into compliance and a general checklist.
C. The number of hydrants to be tested are:
1. Boulder Beach – 53 sites.
Sites – FH1, FH2, FH3, FH4, FH5, FH6, FH7, FH7A, FH8, FH9, FH10, FH11, FH12,FH13, FH14, FH15, FH16, FH17, FH18, FH19, FH20, FH20A, FH21, FH22, FH23, FH24, FH25, FH26, FH27, FH28, FH29, FH30, FH31, FH32, FH33, FH34, FH35, FH36, FH37, Fh38, FH39, FH40, FH41, FH42, FH42A, FH43, Fh44, FH45, Fh46, FH47, FH48, FH49, FH50
2. Las Vegas Bay – 16 sites
Sites – FH1, FH2, FH4, FH6, FH7, FH8, FH9, FH10, Fh11, FH12, FH13, FH14, FH15, FH16, FH17, FH18, LAKE 249129 Page 3 of 11
3. Katherina Landing – 30 sites Sites – FH1, FH1A (not on Map, located at the Water Treatment Plant yard), FH2, FH3, FH4, FH5, FH5A, FH6, FH7, FH8, FH9, FH9A, FH10, FH11, FH12, FH13, FH14, FH15, FH16, FH17, FH18, FH19, FH20, FH21, FH22, FH23, FH24, FH25, FH26, FH28
D. Exercise the valves that operate the hydrant. Exercise the hydrant lateral valve and lubricate hydrant apparatus.
E. Contractor shall remove vegetation growth to allow access to the fire hydrant being inspected. Cuttings may be disposed of in a NPS trash dumpster.
F. Contractor shall remove hydrant caps, degrease and clean the threads of the hydrant and cap, lubricate the threads and reassemble. See attached report for examples of current state of park fire hydrants.
1. Threads shall be cleaned using a NSF rated product: Hydra-Kleen or equal product.
2. Threads shall be wire brushed and wiped clean.
3. Threads shall be lubricated with anti-seize using a NSF prated product: Hydra-Eze or equal product.
G. Contractor shall submit a report of their findings and effort accomplished.
4. Contractor shall submit a PDF copy of the report.
5. Contractor shall submit 3 copies of hard copy report.
6. Report shall be in a 3-ring binder containing hard copy printouts of the report sheets.
7. Sheets shall be single sided and 8 ½ x 11” in size.
8. Tabs shall be used to separate the reports for the different park areas.
H. Contractor Use of Site.
1. General: Contractor shall have use of the site for installation. Limit use of premises to work in areas indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.
2. Contractor shall use equipment when flushing and operating the hydrants to not cause scoured soil or erosion in the surrounding areas of the hydrants.
I. Other Items related to the Operation:
1. Notify the COR of schedule.
LAKE 249129 Page 4 of 11
1.4 LOCATION
The Project location is the Lake Mead National Recreation Area. The site is located in the Boulder Beach and Las Vegas Bay area located near Boulder City, Nevada and Katherine Landing area located near Bullhead City, Arizona.
1.5 PERFORMANCE PERIOD: The project schedule is based on calendar days from the signature of the contract award.
The total performance period for this project is 90 calendar days.
1.6 FIELD VERIFICATION
A. The Contractor shall field verify all new and existing dimensions affecting the work in this contract before ordering any materials, equipment or parts.
1.7 CONTRACTOR'S USE OF PREMISES
A. The site is located in public areas.
A. Contractor shall at all times conduct his operations to ensure the least inconvenience to the recreation area visitors and employees.
B. The contractor shall at all times make the job site safe to the public.
C. Preservation of Natural Features: Confine all operations to work limits of the project.
Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.
F. Work Limits: The Contractor shall be confined to conduct his work to job site area and work limits as shown on drawings or approved by the Contracting Officer. Contractor shall be responsible to pay for rehabilitation work for any resource damage outside authorized work limits.
1.8 HOURS OF OPERATION
A. Hours of operation shall be Monday through Friday between the hours of 7:00 AM and 5:00 PM unless alternate hours are approved by the Contracting Officer and the Contracting Officers Representative (COR). Requests for changes shall be submitted to the COR.
B. Requests for alternate work hours will need to be submitted to the CO and the COR, the COR will review and make a recommendation to the CO to approve the alternate work hours. Alternate work hours may not be used as a way to accelerate the schedule.
Contractors that voluntarily schedule an acceleration are responsible for the costs of those accelerations. Government acceptance of Contractor's voluntary schedule acceleration does not commit the Government to additional costs that result in Contractor's acceleration of the schedule. Voluntary acceleration of work needs to be identified and writing and request shall be reviewed by the COR and is only subject to CO approval.
1.9 SPECIAL PROVISIONS
A. Time Constraints:
LAKE 249129 Page 5 of 11
1. Quiet Hours in the park are from 10:00 PM until 6:00 AM. The Contractor shall not operate equipment or make loud noise between these hours.
2. No work will be performed on weekends or on federal holidays without the advanced, written authorization of the CO.
3. Any request to work outside of normal working days and hours shall be submitted to the CO and COR at least 3 business days before the requested event for authorization.
B. Park Regulations:
1. Ensure all personnel (contractors, subcontractors, and vendors) entering or working in the park are familiar with and obey all park regulations. Law enforcement rangers will intervene if they perceive any unsafe or unlawful activity.
C. Emergency Medical and Accident Reporting:
1. All accidents and incidents shall be reported to the CO and COR.
a. The Contractor or subcontractor shall contact Park Dispatch for any medical emergency or traffic accident occurring within the Park.
Emergency number: Dial 911 as needed.
Park Dispatch: 702-293-8932 EMERGENCY Park Dispatch is called so that the entrance station will be prepared should any emergency vehicles (e.g. ambulance) need to enter the Park and so that any available Emergency Medical Services personnel in the Park might respond until such time as the ambulance arrives.
b. The Contractor or subcontractor is required to report ANY personal injury and / or property damage incident occurring within the park. This report must be made to a Law Enforcement Ranger at the first available opportunity before leaving the park:
Park Dispatch: 702-293-8998 NON-EMERGENCY
D. Logistics:
1. The public access in the public areas shall always be maintained. NPS Employee access should be maintained to all facilities during testing/servicing.
E. Environmental Compliance Requirements:
1. The Contractor and all employees working on the Project will be required to take “Desert Tortoise Awareness Training” which will be provided by the Government at no cost to the Contractor. This training will take approximately 30 minutes or less.
2. The Contractor’s employees shall never handle a desert tortoise.
3. The Contractor and employees shall immediately report the presence of any desert tortoise to the COR.
LAKE 249129 Page 6 of 11
4. Herbicides shall not be used in or around the Project site.
5. The environmental compliance contact for this project is Toshi Yoshida. For questions or additional information, contact Toshi at: 702-293-8849.
1.11 DESIGNATED OFFICIALS
A. The NPS Project Manager (PM) and Contracting Officer's Representative (COR) will be:
Carl Bush PE, Lake Mead NRA Telephone: 702-293-8735 (w) 702-859-0194 (cell) E-mail: carl_bush@nps.gov
B. The Contracting Officer (CO) will be: TBD
END OF SECTION 01010
LAKE 249129 Page 7 of 11
LAKE MEAD NATIONAL RECREATION AREA
FIGURE 1
Project Sites
LAKE 249129 Page 8 of 11
LAKE MEAD NRA DISTANCE CHART
FIGURE 2
LAKE 249129 Page 9 of 11
SECTION 01270 DEFINITION OF BID ITEMS
1.1 DESCRIPTION
A. The intent of this section is to explain, in general, what is and what is not included in a bid item, and the limits or cut-off points where one bid item ends and another begins.
B. If no bid item exists for a portion of the work, include the costs in a related bid item.
1.2 LIST OF ANTICIPATED BID ITEMS
A. BID ITEM No. 01 – Test and Maintain Fire Hydrants, as specified.
1. UNIT – lump sum
2. DEFINITION – Unit price includes all necessary labor, materials, and equipment to test and maintain the fire hydrants.. Unit price also includes all necessary material, labor, and equipment required to exercise and test the fire hydrants and submit report of the findings.
END OF SECTION 01270
LAKE 249129 Page 10 of 11
SECTION 01310 PROJECT MANAGEMENT AND COORDINATION
1.1 SUMMARY
A. This Section includes administrative provisions for coordinating testing/servicing operations on this project including, but not limited to the following:
1. Supervisory and administrative personnel.
2. Coordination procedures.
1.2 SUPERVISORY AND ADMINISTRATIVE PERSONNEL
A. General: In addition to the project superintendent, the Contractor shall provide other supervisory and administrative personnel as required for proper work performance. This may include special personnel required for coordination of operations with subcontractors and material suppliers.
1.3 COORDINATION PROCEDURES
A. Coordination: Coordinate the testing/servicing operations identified in the various Sections of this Specification to ensure the efficient installation of all materials and equipment.
1. Schedule testing/servicing operations in the proper sequence required to obtain the best results where installation of one part of the Work depends on installation of other components before or after its own installation.
2. Coordinate installation of different components with subcontractors and Government personnel to ensure maximum accessibility for required maintenance, service, and repair.
3. Make adequate provisions to accommodate items scheduled for later installation.
1.4 SCHEDULE OF VALUES
A. Submit a schedule of dollar values based on the Contract Bid Schedule. Include insurance costs, mobilization, general condition costs, overhead, and profit in the total dollar value of unit price items and in the component parts of Work for each lump-sum item as described below. Do not include mobilization, general condition costs, overhead, or profit as separate items.
B. Break down each lump sum Bid Item into component parts of Work for which progress payments may be requested. The total costs for the component parts of work shall equal the bid amount for the lump-sum item. The Contracting Officer may request data to verify accuracy of dollar values.
C. The total cost of all items shall equal the contract total, or 100%. The Schedule of Values will form the basis for progress payments. Each progress payment request shall include the overall percentage complete to that date.
END OF SECTION 01310
LAKE 249129 Page 11 of 11
SECTION 01360 ACCIDENT PREVENTION
1.1 QUALIFICATION OF EMPLOYEES
A. Ensure that employees are physically qualified to perform assigned duties in a safe manner.
B. Do not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.
C. Operators of vehicles, mobile equipment, hoisting equipment, and hazardous plant equipment shall be able to understand signs, signals, and operating instructions, and be capable of operating such equipment. Provide operating instructions for all equipment.
1.2 ACCIDENT REPORTING
A. Reportable Accidents: A reportable accident is defined as death, occupational disease, traumatic injury to employees or the public, fires, and property damage by accident in excess of $100. Notify Contracting Officer immediately in the event of a reportable accident. Within 7 days of a reportable accident, fill out and forward to Contracting Officer an Accident/Property Damage Report (Form CM-22). Form may be obtained from the Contracting Officer.
B. All Other Accidents: The Contractor shall report all other accidents to the Contracting Officer as soon as possible and assist the Contracting Officer and other officials as required in the investigation of the accident.
1.3 PERSONNEL PROTECTIVE EQUIPMENT
A. Meet requirements of National Institute for Occupational Safety and Health (NIOSH) and
OSHA.
B. Inspect personal protective equipment daily and maintain in a serviceable condition.
Clean, sanitize, and repair, as appropriate, personal items before issuing them to another individual.
C. Inspect and maintain other protective equipment and devices before use and on a periodic basis to ensure safe operation.
D. It is the Contractor's responsibility to require all those working on or visiting the site to wear necessary protective equipment at all times.
1.4 FIRST AID FACILITIES
A. Provide adequate facilities for the number of employees and the hazards associated with the types of ongoing testing/servicing work at the site.
END OF SECTION 01360
cbush Text Box Example Report Page
Garrett Mincey
SCA Structure Fire Intern
NPS LAKE
6/18/2021
Hydrant Cap Check Report
Summary:
During a fire training in late May of 2021, a 4” fire hydrant cap was seized when undergoing the first run through of the training. The seize took up to ten minutes to resolve and broke a hydrant wrench in the process. It was determined that other hydrant caps in the
Boulder Basin area should be checked for the same issue. Over the past two weeks, 53 hydrants in the area have been checked, with the conclusion being that many caps require service for residue buildup, rust, and gasket damage.
Process:
The process at each hydrant began with a general check over of hydrant location and accessibility based on provided hydrant maps. This was followed by the removal of each of the three caps on the hydrants. Any seizures were documented and then resolved, primarily by striking the sides of the caps with a rubber mallet several times. Once the caps had been removed, threads were inspected as well as the gaskets for residue buildup, rust, and damage to gaskets. Caps were then replaced hand tight. Findings were documented in the comments section of the excel report.
Findings:
Out of 159 caps removed, both the center 4” cap and two 2 ½” side caps on each hydrant, 16 were found to be seized. Seizures were defined as the inability to remove the cap under strenuous effort using a hydrant wrench, requiring additional remedial measures to operate the cap. This equates to about 10.06% of all caps. Some were unable to be screwed in all the way flush with their threads, creating potential for leaks during operation. In addition, out of 53 hydrants, it was found that 10 were obstructed, ranging from completely inaccessible to increased difficulty of access/operation. Out of these 10, 3 were completely inaccessible due to plant overgrowth, and are therefore labeled as unknown for seizures and condition not recorded. (See Figures 6‐7) Residue buildup, rust, and gasket damage were found on over 50% of all hydrants. Residue buildup on the threads was prevalent, often visibly falling off when unscrewing caps, and sometimes causing difficulty in removing them. High amounts of rust were present on the interior of many of the caps as well as some threads. Gasket damage was common throughout all caps, ranging from light wear to heavy damage, such as deformation and tearing. (See Figures 1‐5)
Conclusion:
In conclusion, the risk of complete seizure by a hydrant cap is low, coming in at only
10.06% of all caps tested. However, given the effect this would have on response time if it was to occur on scene, it is something that should be addressed. Many of the seizures were likely a result of the high buildup of residue and rust on both cap and outlet threads and interior. A thorough cleaning and lubing (anti‐seize) of these threads/caps, a quick and easy task, would go a long way in preventing seizures and securing ease of opening and closure. This process could be delegated to a private company or done by NPS maintenance (see video link.) In addition, hydrants that were marked as obstructed should be addressed and remedied as soon as possible to secure ease of access in the event of an emergency. Most of these cases are related to plant growth surrounding the hydrants that could be altered easily.
Appendix
Figure 1: Figure 2:
Figure 3: Figure 4:
Highly damaged Gasket; Tearing 2” Heavy Interior Rust and Gasket Damage 2”
Rust Chipping Collected in 4” Outlet Heavy Interior Rust 4”
Figure 5: Figure 6:
Figure 7:
Rust on Threads and Gasket Damage 2”
Hydrant FH26; Obstructed by Cactus Overgrowth
Hydrant FH2; Obstructed by Thorn Covered Bush
Links
Example of Hydrant Cleaning/Lubrication Process https://www.youtube.com/watch?v=9eYS_kNEHf4
Recommended Degreaser (Super Clean Foaming) https://www.amazon.com/Foaming‐Multi‐Surface‐Degreaser‐Biodegradable‐
Concentrate/dp/B008RHFU6W/ref=sr_1_22?dchild=1&keywords=foaming%2Bind ustrial%2Bdegreaser&qid=1624469815&s=hpc&sr=1‐22&th=1
Note: Super Clean Foaming is strong yet biodegradable and phosphate free, making it easier on the environment.
Fire Hydrant Checks‐Boulder Beach
Seized: Obstructed Comments
Hydrant Number Center Cap Left Cap Right Cap Yes No FH1 No No No X Lightly obscured/obstructed by shrubs FH2 Unk. Unk. Unk. X Unable to access, thorn covered overgrowth FH3 N/A N/A N/A N/A N/A Could not locate, may have been removed FH4 N/A N/A N/A N/A N/A Could not locate, may have been removed FH5 N/A N/A N/A N/A N/A Could not locate, may have been removed FH6 N/A N/A N/A N/A N/A Could not locate, may have been removed FH7 Yes No No X Lightly seized FH7A No No No X Okay condition FH8 No No No X Okay condition FH9 No No No X Okay condition FH9A Yes No No X High rust amount on cap interior FH10 Yes No No X High rust amount on cap interior FH11 No No No X Still accessable, brush reduction recommended FH12 No No No X Okay condition FH13 No No No X Still accessable, brush reduction recommended FH14 No No Yes X Right seized and difficult to screw, leaking FH15 No No Yes X Seized after using recently at training FH16 No No No X Okay condition FH17 No No No X Boats, trailers, vehicles parked in front FH18 No No No X Okay condition FH19 No No No X Okay condition FH20 No No No X Damaged gasket FH20A No No No X Okay condition FH21 Yes Yes No X Center gasket rotting; high rust FH22 No No No X Okay condition FH23 No No No X Okay condition FH24 No No Yes X Cannot screw right side all the way on FH25 No No No X High residue FH26 Unk. Unk. Unk. X Obstructed by cactus overgrowth FH27 No No No X High residue FH28 No No No X Damaged gaskets, high residue FH29 No No No X Right cap obstructed by bush; gasket damage FH31 No No No X High gasket damage and residue FH32 Unk. Unk. Unk. X Obstructed by bush FH33 No No No X High gasket damage and residue FH34 Yes No No X Major seize on center cap due to high rust FH35 No No No X Some gasket damage and residue FH36 Yes No No X Light seize on center cap FH37 No No No X Highly damaged gaskets FH38 No No No X Okay condition FH39 No No No X Gasket damage, high rust on center cap threads FH40 No Yes No X Lightly seized left side; damaged gaskets & residue FH41 Yes No Yes X High gasket damage FH42 No No No X Gasket damage and high residue FH42A No No No X High residue; no seize but difficult to turn FH43 No No No X Gasket damage, high residue FH44 No No No X High rust build up FH45 Yes No No X Lightly seized, encroaching cactus; high gasket damage FH46 No No No X High residue and gasket damage FH47 No No No X Okay condition FH48 Yes No No X Heavy rust, damaged gaskets FH49 No Yes No X Damaged gasket, light brush obstructing FH50 No No No X High interior and exterior rust; damaged gaskets