A04_SOW_Revised.docx
DOCX document 17 KB Posted
- Solicitation number
- 140L1221Q0028
About this file
This scope of work document outlines requirements for a federal contract to deliver 52,000 tons of aggregate base material to three sites within the Imperial Sand Dunes Recreation Area in California. The Bureau of Land Management seeks a qualified contractor to furnish labor, equipment, supplies and materials to produce and transport Class II aggregate road base by bottom dump trucks at a rate of 1,500 to 1,625 tons per day in five daily delivery rounds. The performance period requires all aggregate to be delivered within 28 consecutive calendar days beginning on an anticipated start date of July 12, 2021, with no weekend delivery. The contractor must provide weighmaster certificates to the BLM point of contact for each load.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B08_SOW_0001.docx | DOCX document | |
| A06_Road_Location_Map.pdf | ||
| Sol_140L1221Q0028.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work or Services:
OBJECTIVE:
The Bureau of Land Management (BLM) seeks a qualified contractor/vendor to deliver natural aggregate road base material for Wash Road Re-surfacing Project and Campground pads along Gecko Road. Gecko Road is a paved road while Wash Road is an aggregate/natural surfaced roadway. The supplies to be delivered, and all related work to be accomplished, under this contract includes all labor, supervision, transportation, equipment, tools, supplies, and materials necessary for producing and delivering 52,000 tons of aggregate base as specified.
A. Description of Work: Furnishing labor, equipment, supplies, and material, to complete the necessary work as described.
1) Class II aggregate road base meeting Caltrans Standard Specification Section 26 – Aggregate Base (3/4 minus). Natural aggregate road base only.
2) Deliver 1,500 to 1,625 tons per day. Each delivery round consists of 12 to 13 trucks, departing rock quarry two (2) mins apart, a total of five (5) delivery rounds per day.
A. Site #1 - 14,500 tons B. Site #2 - 4,750 tons C. Site #3 - 3,275 tons
3) Deliver aggregate road base by bottom dump trucks.
4) The contractor shall provide the weighmaster certificate tickets to BLM Point of Contact (POC)
PERFORMANCE PERIOD:
Contractor will have 28 consecutive calendar days to deliver all aggregate road base with NO weekend delivery. The anticipated work is planned for Monday July 12th, 2021. The BLM will coordinate with the contractor for starting site and time.
LOCATION: