This document is a Statement of Work (SOW) for the solicitation to supply and install flooring in Building 750 Bunkhouse in the Heart O Hills area of Olympic National Park.
The key requirements are to install high-traffic carpet in bedrooms, hallway, living room, and dining room, and luxury vinyl plank flooring in the kitchen, bathrooms, and utility room, over the existing asbestos tile flooring. The contractor shall verify quantities, provide flooring samples, and complete the installation. The period of performance is 9/15/2024 - 11/15/2024. A site visit is scheduled for 8/20/2024, and work hours are 7:00am to 7:00pm Monday through Friday, excluding federal holidays. The contracting agency is the Department of the Interior National Park Service Pacific West Region.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P8324Q0082_Amd_0001.pdf | ||
| Sol_140P8324Q0082.pdf | ||
| B03_Wage_Determination_OLYM_Bunkhouse_Flooring.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. 140P8324Q0082 Supply and Install Bunkhouse Flooring Olympic National Park
Supply and Installation of High-Traffic Carpeting and Luxury Vinyl Flooring
Heart O Hills Bunkhouse – Building #750
Solicitation # 140P8324Q0082
Developed By
Facility Management
600 East Park Ave Port Angeles, WA
June 2024
Description:
1. Install high traffic carpet and vinyl flooring in the 1400 square-foot Building 750 Bunkhouse in the Heart O Hills area of Olympic National Park. Current flooring in the entire unit is asbestos tile. This requirement is to install carpet and vinyl over all the asbestos tile; there is no asbestos remediation or abatement required.
a. Carpeting: High traffic style carpet to be installed in all bedrooms and associated closets, hallway and associated closets, living room and associated closet and dining room.
b. Vinyl flooring: Luxury vinyl plank flooring to be installed in the kitchen, bathrooms, and utility room.
c. Please see attached Legend for floor layout.
d. Government will provide removal of the following before work starts to ensure rooms are empty for installation of the flooring:
i. All furniture
ii. All interior doors
iii. Hot water tank/water closets
iv. Stove
v. Fridge
vi. Washer/Dryer
e. The contractor shall:
i. Verify appropriate quantities of carpet, vinyl plank flooring, transition products, transition strips for transitions between carpet and tile, tack strip, adhesive and any other flooring accessories and incidentals required to complete installation.
ii. Provide minimum of three (3) carpet samples and (3) vinyl samples to Park staff in various Earth Tone colors to choose final colors from.
NOTE: Contractor shall deliver samples to Park staff no later than Friday, September 27, 2024.
iii. Supply all equipment, labor, and materials required to complete the installation.
iv. At work completion, clean work area of all scraps, remnants and other debris created during work execution.
v. Coordinate work schedule with the Contracting Officer’s Representative (COR). COR, or designated Park staff, will inspect installation for acceptance for the entire building upon completion of work.
Period of Performance:
The Period of Performance for this requirement is 9/15/2024 – 11/15/2024.
Site-Visit:
A site-visit will be available between 2p-3p PDT, on Tuesday, August 20th for vendors interested in taking measurements. Please RSVP to Dave_Weaver@nps.gov with your name, company name, and phone number.
Work hours:
Access to building 750 will be from 7:00am to 7:00pm Monday through Friday, excluding Federal Holidays. Coordinate work-start schedule at minimum 2 days in advance with the COR.
Location:
The Heart O Hills Bunkhouse building 750 is located approximately 5.1 miles up Hurricane Ridge Rd. from Port Angeles. Follow Mt. Angeles Rd to Hurricane Ridge Rd, take Hurricane Ridge Road for approximately 5.1 miles and turn Right onto Lake Angeles Heather’s Park Trail Road, immediately before the entrance station to Hurricane Ridge. Building 750 will be on the right in the parking lot. Building 750 is located within the highlighted area on the map below, and is marked “750”.