ML DIST. OFFICE ROOF REPAIR & REPLACE
Solicitation number
140P5225R0001
Issued by

About this file

This is a Statement of Work detailing requirements for roof repair and replacement at the Meriwether Lewis District Office and Equipment Storage buildings at the Natchez Trace Parkway in Tennessee. The project involves demolition and replacement of existing roofing systems and failed components, including an estimated 40% replacement of flat roof decking and some support structure joists.

The work requires installing 25-year or better asphalt shingles on sloped portions to match existing color, and light-colored EPDM roofing systems with associated insulation, adhesive layer, fasteners and plates on flat sections. Solar panels and mounting hardware must be removed and reinstalled by certified electricians/installers. Key specifications include 75-mil EPDM membrane, polyisocyanurate insulation with minimum R-value of 36, pre-finished sheet metal flashing/trim with 20-year warranty, and new gutters/downspouts. Work hours are 6:30 AM to 4:30 PM Monday-Friday, with coordination required to maintain district maintenance operations. The contractor must provide portable toilets, follow strict safety protocols, and implement waste management/recycling practices. All materials and workmanship carry a 2-year contractor guarantee, with various manufacturer warranties ranging from 20-30 years for different components.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

MERIWETHER LEWIS DISTRICT

OFFICE ROOF REPAIR &

REPLACEMENT PMIS 321759

TABLE OF CONTENTS

Section 01 01 10

01 11 00 – General Overview 01 11 40 – Park Regulations 01 26 00 – Contract Modification Procedures 01 27 00 – Definition of Contract Price Items 01 31 00 – Project Management and Coordination 01 32 16 – Construction Schedule 01 32 23 – Submittal Procedures 01 35 23 – Safety Requirements 01 40 00 – Quality Requirements 01 42 00 – References 01 57 19 – Indoor Air Quality Management 01 57 20 – Noise & Acoustics Management 01 67 00 – Product Requirements 01 73 29 – Cutting & Patching 01 73 40 – Execution 01 74 19 – Construction & Waste Management & Disposal 01 77 00 – Closeout Procedures 01 78 23 – Operations and Maintenance Data 01 81 13 – Sustainable Design Requirements for Non-LEED Projects 01 91 13 – General Commissioning Requirements

Table of Contents

Section 06 01 10

06 10 53 – Miscellaneous Rough Carpentry 07 05 05 – Selective Demolition for Thermal & Moisture Protection 07 22 00 – Roof & Deck Insulation 07 31 13 – Asphalt Shingles 07 53 23 – EPDM Roofing 07 62 00 – Sheet Metal Flashing & Trim 07 71 23 – Manufactured Gutters & Downspouts 07 90 00 – Joint Sealer

08 01 01 – Photographs of Meriwether Lewis Maintenance Buildings

This page left blank intentionally.

ROOF REPAIR AND REPLACEMENT SERVICES

MERIWETHER LEWIS(TN)

NATCHEZ TRACE PARKWAY

SECTION 01 11 00

PART 1 – GENERAL

1.1 SUMMARY

A. This Section includes the following:

1. Work covered by the Contract Documents.

2. Work phases.

3. Contractor use of the site.

4. Public use of the site.

5. Buildings.

6. Work Restrictions.

7. Special Construction Requirements.

8. Work under other contracts.

9. Government Furnished Materials.

10. Occupancy requirements for buildings.

11. Additional Reports.

1.2 WORK COVERED BY CONTRACT DOCUMENTS

A. Project Location: This project is located at the Meriwether Lewis Site in TN. Meriwether Lewis is located Mile Post 385 on the Natchez Trace Parkway and intersects with Highway 20, or Summertown Highway. There is an entrance into Meriwether Lewis area off the Summertown Highway and it’s the preferred entrance for equipment and material delivery.

B. The work consists of the following:

1. The project consists of the demolition and replacement of the existing roofing systems and failed components.

It’s estimated that 40% of the flat roof decking is estimated to need replacing along with some of the support structure joists as well. The preferred alternatives consist of a traditional, 25-year or better asphalt shingle, replacing in kind or better and matching the color as close to the current color as possible for those sections on the sloped portion of the office building. Removing material to the deck, replacing any bad deck, and finishing with new Ice & Water Barrier, Moisture Barrier, Drip Edge, Shingles, and Flashing, the preferred alternative for the flat sections would be a light-colored EPDM roofing system on the office and equipment storage roof with associated insulation, adhesive layer, fasteners, and plates.

2. Solar Panels will need to be removed from some roof sections along with some sections of their mounting hardware, both sloped and flat, where they are currently attached. The contractor shall have a certified electrician or certified solar installer disconnect the current panels, ensuring removal can be done safely. The contractor shall then have a certified electrician or certified solar installer reconnect all solar panels once the roofing project is complete.

C. The project will be constructed under a single prime contract.

D. Project Contacts:

1. Contracting Officer (CO): TBD; Interior Region, South Atlanta Gulf

2. Contracting Officer’s Representative and Project Manager; will be Steven "Mark" Holley; Natchez Trace Parkway, 2680 Natchez Trace Parkway, Tupelo, MS 38804; (662) 680-4054; Steven_Holley@nps.gov

3. Park Civil Engineer Contact: TBD but currently Steven Mark Holley, 2680 Natchez Trace Parkway, Tupelo, MS 38804; Office

(662) 680-4054, Steven_Holley@nps.gov.

4. Park Safety and Occupational Health Manager; Myranda Spear, 2680 Natchez Trace Parkway, Tupelo, MS, 38804; Office (662) 680-4010; Myranda_spear@nps.gov

5. Natchez Trace Parkway Emergency Dispatch; (662) 680-4002.

1.3 WORK PHASES

A. General: Contractor shall have use of the site for construction operations. Limited use of premises to areas within the Contract limits indicated. Do not disturb portions of the Project site beyond areas in which the Work is indicated.

1. Limits: Confine construction operations within the designated perimeter of the site (pavement areas) unless otherwise instructed.

2. Utilities to support construction activities by the contractor:

a. Water: Contractor may use water from the existing facility by coordinating with the district supervisor. All water use must be directly associated with a necessary need to complete the contract.

b. Power: The contractor may use power from existing facilities by coordinating with the district supervisor. Acceptable uses are for equipment associated with the direct construction of the project. The objective of allowing the contractor to utilize power at facilities is to limit the use of portable generators, when possible, to reduce noise and greenhouse gases (carbon footprint of the project).

3. Restrooms: The contractor is required to provide Portable Toilets for their staff. The interior restrooms are not available for contractor employees. Location of the portable toilets will be determined by the district supervisor of Meriwether Lewis or the Contracting Officers Representative.

B. Storage of Materials: Confine storage of materials to areas defined by the Contracting Officers Representative, at the direction of the district supervisor of Meriwether Lewis. Depending on the amount of storage needed, this location will be determined at the Pre-con.

C. Preservation of Natural Features:

1. Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees, landscape, and any plants or shrubs, at no additional expense to the Government.

2. Provide temporary barriers to protect surrounding landscape where necessary.

3. Do not fasten ropes, cables, or guys to existing trees, shrubs, or to any landscape feature.

4. Erosion control measures will be following the approved UPPP when necessary.

D. Driveways and Entrances: Keep driveways and entrances serving premises clear and available to Government, Government employees, and emergency vehicles. Do not use these areas for parking or storage of materials. There may be times when the work area next to the building will need to be utilized for equipment, ladders, etc. Limited access to this area can be arranged with prior approval from the Contracting Officers Representative or the District Supervisor of Meriwether Lewis. All ABA designated entrances will need to remain accessible but can be temporarily closed to ensure the safety of anyone using that entrance.

1. Schedule deliveries to minimize the use of driveways and entrances.

2. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

mailto:Myranda_spear@nps.gov https://www.nps.gov/dscw/upload/UnderAnAcre-UPPP_Guideline_3-30-16_AF_120417.pdf

E. Construction Camp or Employee Housing: The establishment of a camp within the park will not be permitted even though the Meriwether Lewis campground is near the construction site. The campground is for visitor use only and is primitive in nature. There is no temporary housing available at Meriwether Lewis.

F. Hauling Restrictions: Comply with all legal load restrictions in the hauling of materials. Load restrictions on park roads are as follows –

a. When hauling on National Park Service roads, do not exceed the following load restrictions:

Single Units Gross Vehicle Weight –Lbs.

2 axles 40,000 3 axles 48,000 4 or more axles 52,000 Combination Units 3 axles 57,000 4 axles 62,000 5 or more axles 66,000

Haul vehicles shall turn around only at intersections and parking areas and avoid vegetation or grassy areas. Any damage to these areas will be fixed by the contractor at the direction of Contracting Officers Representative.

b. Operate loaded vehicles hauling material at speeds not exceeding 40 MPH and spaced at 500-foot minimum intervals. On bridges, speeds shall not exceed 25 MPH and not more than one loaded hauling vehicle shall be allowed on any bridge at one time. Hauling of materials, supplies, and equipment over the park road, other than within the limits of the project, shall not be permitted without prior approval of the Contracting Officer. Trucks and other heavy equipment shall be confined to the limits of the project on at the Meriwether Lewis site. Hauling of materials, supplies, and equipment over the park road, other than within the limits of the project, shall not be permitted except as is necessary to perform the required work and the contractor shall be required to haul on non-Parkway roads to the maximum extent possible. Permission must be received if the Parkway will need to be utilized.

1.4 CONTRACTOR USE OF SITE

A. General: The contractor shall have full use of the site for construction operations during the construction period unless otherwise specified. The contractor's use of the site is limited only by the Government's right to perform work or to retain other contractors on portions of the project or any other ongoing projects.

B. Site Access: The contractor shall access the project site from Highway 20, otherwise known as Summertown Highway. The contractor shall not drive vehicles off-road or access non-project areas without permission from the contracting officer or the contracting officer’s representative. The contractor will maintain a list of contracted personnel with phone contact information in case there is a weather-related emergency or any other emergency that would require immediate notification. This area is prone to tornados and storm shelter information can be found - Known Storm Shelter Natchez Trace Parkway (nps.gov) https://www.nps.gov/natr/planyourvisit/upload/Tornado-Shelters-by-County-and-milepost-revised-1-2019.pdf https://www.nps.gov/natr/planyourvisit/upload/Tornado-Shelters-by-County-and-milepost-revised-1-2019.pdf

C. Construction Time Period: Timing of work shall be coordinate with the Contracting Officer and follow the approved Contractor’s work schedule. Hours of construction are 6:30 AM to 4:30 PM, Monday thru Friday. The Park facilities will be closed on Federal Holidays.

D. No Smoking Policy: Smoking is prohibited inside or outside within 25 feet of any buildings. This applies to existing buildings, buildings under construction, and buildings under renovation. Discarding tobacco products or debris anywhere other than into designated tobacco receptacles is considered littering and subject to fines.

E. Staging and Storage: Confine storage of equipment and materials to the staging/lay-down/storage areas identified within the area designated by the Contracting Officer or their representative, as established at the preconstruction meeting. The contractor is responsible for protecting the existing asphalt pavement in the storage areas. Pads/cushions are to be placed under dumpsters or tracked equipment to protect the asphalt surface area if temperatures dictate the need to protect the pavement as this area is prone to hot temperatures and direct sunlight during the summer months.

F. Driveways and Entrances: Keep driveways and entrances serving premises clear and available to Government, Government employees, and emergency vehicles. Do not use these areas for parking or storage of materials.

1. Schedule deliveries to minimize the use of driveways and entrances.

2. Schedule deliveries to minimize space and time requirements for the storage of materials and equipment on-site.

G. Preservation of Natural Features:

1. Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged landscape or features, at no additional expense to the Government.

2. Provide temporary barriers to protect surrounding landscape and/or work zones.

3. Do not fasten ropes, cables, or guys to existing trees or any landscape feature.

4. Prevent damage to natural surroundings or historic features such as buildings and other structures that remain in the area near construction work zones.

H. Construction Camp: The establishment of a camp within the park will not be permitted even though the Meriwether Lewis campground is near the construction site. The campground is for visitor use only and is primitive in nature. There is no temporary housing available at Meriwether Lewis.

1.5 GOVERNMENT-FURNISHED ITEMS

A. The Government will not be furnishing any items for this project. The government will however provide certain utilities as identified in Section 1.3; A2.

1.6 PUBLIC USE OF THE SITE

A. General: All construction work including any or all related construction activities shall enable employees to conduct their daily activities with minimal impact and or disruption. The contractor shall coordinate all construction work including any or all related construction activities at least seventy-two (72) hours in advance that have potential for impacts upon the facility operations with the Contracting Officer to avoid potential negative impacts to the district maintenance operations. This area is utilized 7 days a week, with normal NPS working hours from 6:00 AM to 4:30 PM. On occasion, after hours emergency response will access this area. A large portion of the construction area is secured by fence and government buildings are alarmed.

1.7 BUILDINGS

A. Existing Buildings

1. Partial Government Occupancy: Cooperate with Government staff and visitors during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with the Government’s staff and visitors’ operations. Maintain existing exits, unless otherwise indicated. a. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from the Contracting Officer.

1.8 SPECIAL CONSTRUCTION REQUIREMENTS

A. Limited Access: The contractor shall coordinate the scheduling of construction activities regarding limited access to the site with the Contracting Officer before and during construction.

1.9 REFERENCE DOCUMENTS/REPORTS. (Not Used)

1.10 OCCUPANCY REQUIREMENTS FOR BUILDINGS. (Not Used)

1.11 WORK UNDER OTHER CONTRACTS. (Not Used)

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION

SECTION 01 11 40

1.1 PARK REGULATIONS

A. General: The Contractor must comply with the following rules and conditions:

1. Ensure personnel (contractors or subcontractors) working in the park become familiar with and obey all park regulations, wear hard hats in designated areas, high visibility clothing, and do not enter any restricted areas unless required to do so and until cleared for such entry.

2. Ensure equipment is conspicuously marked for identification.

3. The Contractor shall restrict non-employees/non-representatives to the worksite and control travel directly to and from the worksite. The worksite is located in an area not open to the public.

4. The Contractor shall restore all signs and markings to their original form if such signs/markings are defaced or deleted during construction/repair.

5. Control of Contractor-owned equipment and materials at the worksite. This means ensuring equipment is properly secured when not in use. Report immediately missing/lost/stolen property to the Contracting Officers Representative and NPS law enforcement at (662) 680-4002.

6. Please note that there is no entrance fee specific to this work location.

a. The contractor will provide the Contracting Officer or NPS Law Enforcement with a listing of its subcontractors and their associated vehicles upon request.

7. Vehicles/Heavy Equipment:

a. Rules of the Road: All vehicles and heavy equipment will comply with posted traffic regulations, including speed limits. Failure to comply with traffic regulations will result in a citation being issued to the driver.

b. Vehicle Parking: Vehicles are not permitted within long-term or overnight parking along park roads or in associated overlooks/pullouts. Vehicles and heavy equipment will be permitted at designated parking areas only or as established at the preconstruction meeting.

c. Vehicle Exhaust: All vehicles and equipment will be properly maintained to ensure that the exhaust produced is within legal limits. Effects of excessive vehicle exhaust may be subject to enforcement of State and Federal laws regarding emissions as well as those regarding threatened and endangered species.

d. Vehicle Condition – All vehicles and equipment shall not leak any fluid on paved or unpaved portions of the Natchez Trace Parkway landscape. It will be the contractor’s responsibility to clean any foreign material or liquid from the traffic or non-traffic surface that originated from contractor owned equipment, sub-contractor owned equipment, or rental equipment.

d. Spills: The contractor shall be responsible for any cleanup efforts required by 40 CFR and all applicable state environmental quality laws regarding disposal and cleanup of hazardous/industrial wastes. The contractor must immediately notify the Contracting Officer and the Natchez Trace Parkway emergency dispatch of spills.

e. Commercial Vehicle Safety Inspections: The Contractor, employees, contractors, and subcontractors shall fully cooperate regarding safety inspections of commercial vehicles within the park should the need arise.

f. DOT Compliance: All vehicles and operators are to be compliant with all DOT requirements.

g. Slow Vehicles: Will not impede traffic flow for employees or visitors to the Natchez Trace Parkway.

h. Oversized Vehicles: Are not allowed on the Parkway.

i. Road Work: N/A on this project.

j. Law Enforcement: Law enforcement will intervene if they perceive any unsafe or unlawful activity. The contractor must immediately comply with any instructions issued by a park law enforcement ranger.

k. Road & Weight Restrictions: All vehicle load, weight, and size limitations, as established by State law, apply to vehicles operated on the park road. Comply with all legal load restrictions in the hauling of materials as listed in Section 1.3 “Work Phases”: F.

8. Emergency Medical and Accident Reporting:

a. The Contractor or subcontractor shall contact the Emergency number first, 911. The Contracting Officer’s Representative and Occupational Health and Safety Manager is to be contacted next for any medical emergency or traffic accident occurring within the park.

Emergency number: Dial 911 as needed.

Natchez Trace Emergency Dispatch – (800) 300-7275 or (662) 680-4002.

b. The Contractor or subcontractor is required to report ANY personal injury and/or property damage incident occurring within the park. This report must be made to a contracting officer representative and the park Safety & Occupational Health Manager the first available opportunity before leaving the Park.

B. Site Access

1. The contractor shall access the project site from Highway 20, otherwise known as Summertown Highway.

The contractor shall not drive vehicles off-road or access non-project areas without permission from the Contracting Officer or the Contracting Officers Representative.

1.2 RESOURCE PROTECTION

A. General: The park is committed to protecting natural and cultural resources found within the park and adjacent lands.

The Contractor must comply with the following rules and conditions:

1. Soundscape / Noise: The contractor shall minimize noise levels at the project site to protect the soundscape of the park. Perform noise-producing work in less sensitive hours of the day or week or as directed by the Contracting Officer of their Representative.

2. Obey all park regulations. Drivers must obey all traffic laws and keep an eye out for animals, pedestrians, or bicyclists on or alongside the road.

3. Endangered Species: Endangered species are protected by Federal law. Obey all park regulations. Drivers must obey all traffic laws and keep an eye out for animals on or alongside the road. Contact Park dispatch at (662) 680-4002 immediately if the animal is hit or injured or will not move off the road.

1.3 WORK RESTRICTIONS

A. On-Site Work Hours: Work shall be generally performed during the hours of 6:30AM to 4:30 PM Monday through Friday, except when otherwise indicated. The Park facilities will be closed on all Federal Holidays.

1. Weekend Hours: Same as On-Site Work Hours but weekend work must be requested in advance and approved by the Contracting Officer or the Contracting Officers Representative.

2. Early Morning Hours: Same as On-Site Work Hours

B. Existing Utilities

1. Existing Utilities: Notify the Contracting Officer and local utility companies of proposed locations and times for service interruptions.

2. The contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government.

3. If damage occurs to an unknown utility, repair utility, an equitable adjustment will be made per the changes clause of the contract.

4. Restrooms: The contractor is required to provide Portable Toilets for their staff. The interior restrooms are not available for contractor employees. A portable toilet location will be made available and agreed upon by the NPS Meriwether Lewis supervisor and the contractor prior to the delivery of the portable toilet. The location will need to be convenient for the contractor, accessible for a pumper truck, and out of the way of the daily operations of the active maintenance yard.

C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions:

1. Notify Contracting Officer and their Representative not less than (5) five days in advance of proposed utility interruptions.

2. Do not proceed with utility interruptions without Contracting Officer’s written permission.

3. Hours for Utility Shutdowns: The existing utility systems may be non-operational, when required, upon specific approval of the Contracting Officer or their Representative for a maximum of (4) four consecutive hours. Shutdowns shall be scheduled to occur mid-day (9 am – 2 pm), if possible as this is when most NPS employees are working in the field.

D. No Smoking Policy: Smoking is prohibited inside or outside within 25 feet of any buildings in the park. This applies to existing buildings, buildings under construction, and buildings under renovation. Discarding of tobacco products or debris anywhere other than into designated tobacco receptacles is considered littering and subject to fines.

E. Hot Permits: Any use of open flame or welding will need require pre-approval from the Health and Safety Manager of Natchez Trace Parkway to ensure appropriate precautions are taken around structures and sensitive landscapes. This includes but is not limited to, Brazing, Cutting, Grinding, Soldering, Thawing Pipe, Torch-Applied Roofing, and Welding.

CONTRACT MODIFICATION PROCEDURES

PART 1 - GENERAL

SECTION 01 26 00

A. The work of this section consists of administrative and procedural requirements for contract modifications.

1.2 DEFINITIONS AND ALLOWANCES

A. Home Office Overhead: Those costs incurred in support of all contractor’s projects and not attributable to a specific job. The cost for home office overhead is only allowed as a percentage of all direct work excluding profit. The following items represent allowable home office overhead costs identified in Part 31 of the Federal Acquisition Regulation (FAR):

1. Rent

2. Utilities

3. Furnishings

4. Office equipment

5. Executive and management staff not exclusively assigned to the project

6. Support, accounting, and administrative staff

7. Preparation of cost proposals, estimating, and schedule analyses connected with Modifications

8. Estimating and preconstruction services

9. Mortgage costs

10. Real estate and corporate taxes

11. Automobile maintenance and travel costs for home office personnel

12. Home office insurances i.e., structure, automotive, umbrella, flood, etc.

13. Depreciation of equipment and other assets

14. Home office supplies (paper, staples, etc.)

15. Legal services

16. Accounting and data processing

17. Professional fees/registration

B. General Conditions (Field Office Overhead): Management and administrative costs incurred on-site for the designated project. Costs associated with the preparation of modifications will not be allowed. The costs for these items are to be included only in the general conditions of the modification estimate. Only in the case of a contract time extension are additional general conditions included in modifications. The following items, if applicable, are considered allowable costs for calculating General Conditions:

1. Contracting Officer, Contracting Officer Representative

2. Superintendent, Assistant Superintendent

3. Quality Control, Safety Officer, Environmental Manager, etc.

4. Engineers

5. Travel, lodging, and per diem (as established by Federal Travel Regulations)

6. Scheduling

7. Field Office Trailers and associated temporary utilities

8. Field office supplies a. Mailing and couriers

b. Reproduction costs

c. Storage

d. Phones

e. Computers

f. Copiers

9. Personal vehicles i.e., Superintendent pickup trucks.

C. General Requirements: These are costs directly associated with the project and are necessary to perform the actual work of the modification. These costs shall be shown as direct costs in the estimate. The following items, if applicable, are considered allowable costs:

1. Hoisting

2. Material handling

3. Temporary fencing

4. Port-a-lets

5. Trash removal, dumpsters

6. Barricades

7. Small tools

8. Safety supplies

9. Scaffolding

10. Daily cleaning

11. Traffic control

12. Temporary signage

13. Temporary heating and power

D. Personnel Costs: Costs included in the modification must only be for General Conditions, staff and workers present and working on the project site. Modification costs for salaried workers are only allowed within the structure of a forty

(40) hour week and no overtime or holiday pay will be allowed.

1. Worker Hourly Rates are costs directly associated with the individual worker and consist of the following:

a. Base Rate: This is the hourly rate paid directly to the worker.

b. Labor Burden: Employer payments of all applicable burdens, this includes insurance and taxes that the business must pay on behalf of the worker to government entities and educational forums, such as:

1) Social Security

2) Medicare

3) Workers Comp – Policy and company calculation to be made available.

4) FUTA – Cap Rate and percentage to be proportionally allocated over one year.

5) SUTA – Cap Rate and percentage to be proportionally allocated over one year.

6) Union agreement costs – Other costs required under an enforceable collective bargaining agreement.

c. Fringe Benefits: Various non-wage compensations provided to employees such as: 1) Health Care Insurance Premiums

2) Cell Phone

3) Clothing

4) 401K and Pensions

5) Vehicle allowances

6) Gas allowance

7) Life insurance premiums

8) Disability insurance

9) Other Fringe Benefits required under an enforceable collective bargaining agreement

E. Bonuses or Deferred Compensation: No Bonus or Deferred Compensation will be allowed within any components of pricing including Home Office Overhead, General Conditions, General Requirements, Hourly Worker Rates, or the direct costs of work.

F. General Liability Insurance: An insurance policy that protects the contractor from claims resulting from bodily injury or property damage to a third party. Include this as a separate line item within all modification proposals and provide a current insurance quote upon request.

G. Performance and Payment Bonds: A performance bond is a surety bond issued by an insurance company or bank to guarantee the satisfactory completion of a project. The Payment Bond guarantees that the contractor will pay the labor and material costs they have incurred. Banks and Insurance companies charge a premium for each project based on a sliding scale which relates to the size of the project. Include this as a separate line item in modification proposals and provide current company bonding rates upon request.

H. Builder’s Risk Insurance: This covers the contractor’s loss due to fire, high winds, or other natural forces. This is not reimbursed by the National Park Service (NPS) and shall not be included in modification proposals.

1.3 MODIFICATION PROPOSAL PRICING REQUIREMENTS

A. General:

1. Your proposal must be received in the format and within the time frame specified in the Request for Proposal letter.

Costs or delays resulting from the failure of the contractor to submit within the time frame specified will not be compensable.

2. The proposal must be detailed with itemized lists of equipment, materials, labor, production rates, overhead, profit, and bond markup for each item. Labor costs must be itemized by craft and hourly rate, including Fringe Benefits and Labor, Burden. If the costs of Fringe Benefits and Labor Burden are not itemized, it is assumed that they are included in the hourly rate shown, or the contractor is not requesting reimbursement. The contractor may utilize the government provided Contractor Estimate Form or their form if it contains the same information and level of detail as the Government provided form.

3. Requests for extensions of contract time because of this change, must be justified with a Time Impact Analysis (TIA).

Refer to Division 01 Specification, “Construction Schedule”, for time impact analysis requirements. TIA and associated costs must be received with the proposal by the date shown within the Request for Proposal letter. The contractor’s failure to submit within the specified time frame will be construed as the Contractor waiving the right for additional time and no time extension will be allowed.

4. All supporting documentation used to justify the proposed modification will be made available to the Contracting Officer upon request.

5. The contractor must review and approve all subcontractor/supplier pricing in detail for proper format, scope, production rates, and pricing before submission to the NPS. All delay costs associated with not reviewing and approving subcontractor/supplier pricing will be borne by the Contractor.

6. All pricing and production rates within the estimate must be based on fair and reasonable pricing and cannot include a built-in contingency.

B. Labor:

1. The contractor shall estimate the cost of labor by itemizing each craft involved, indicating worker hourly rate (base rate + labor burden + fringe benefits) for each, and itemizing the hours required for each craft that will be directly engaged in modification work. Any work proposed that will require overtime work or premium pay shall be itemized separately. All rates shall be following the Davis-Bacon Act as incorporated herein. Labor Burden may include payroll taxes, Social Security, unemployment insurances, workers compensation insurance, FICA, FUTA, and other direct costs resulting from Federal, State, or local laws.

https://www.nps.gov/dscw/publicforms.htm

2. Itemize labor costs for equipment operators separate from equipment costs.

3. The labor cost for foremen shall only be costs for related work required for the modification.

C. Materials:

1. The estimated cost for materials shall include quotes from multiple sources. Material prices must include all applicable fees and credits, including but not limited to, sales tax, freight and delivery charges, and tax rebates.

2. No markup shall be applied to any material provided by the NPS.

D. Equipment:

1. Equipment used for the project must be appropriately sized for the work being performed.

2. Do not include costs for “miscellaneous tools and equipment”, in your proposal for a replacement value of five hundred dollars ($500) or less. Costs shown over five hundred dollars ($500) must be broken out separately.

3. Regardless of ownership, the rates to be used in determining equipment rental costs shall be the lowest cost from one of the following sources: a. U.S. Army Corps of Engineers, Ownership and Operating Expense Schedule (use the latest edition and applicable region).

b. Construction Blue Book.

c. Local equipment rental rates, documented by actual invoice charges, or itemized vendor quotes.

4. The estimated rental rates shall include the cost of all fuel, oil, lubrication, supplies, small tools, necessary attachments, ground engaging components, tires & tracks, routine repairs, and maintenance (cost of a major overhaul is not included), depreciation, storage, insurance, and all incidentals. Mobilization, if applicable, may be included for equipment solely used on the modification work but must be listed separately.

5. Estimate the full rate for equipment only for the duration that the equipment will be utilized to accomplish the work of the modification.

6. Standby unit rates used are to be following paragraph 1.3, D, 2, above. If the US Army Corp of Engineers is utilized, then their standby rates prevail. If Bluebook or local equipment pricing is accepted, then one half (½) of the equipment costs minus any operating costs will be accepted.

7. If the equipment is in standby mode due solely to a documented NPS delay, the established standby rate shall apply from the first day of the delay.

8. Equipment that is not used and on the job site for up to five consecutive days may be classified at standby rates, provided that the equipment is or has been used solely to perform work on the modification and will be necessary to complete additional modification work. Equipment that is still on the job site but not in use after five consecutive days will not be considered in the modification pricing.

9. Requests for compensation for equipment stand by time must be justified, documented, and itemized separately.

10. The estimated timeframe (daily, weekly, monthly) for use of the equipment must reflect the lowest cost to the

Government.

E. Establishment and Application of Overhead and Profit Percentages:

1. Home Office Overhead and Profit (OH&P) shall be applied to direct costs only. Profit shall not be applied to overhead amounts; and overhead shall not be applied to profit. Home office overhead shall contain only allowable, allocable, and reasonable costs per the contract documents and FAR Part 31. Profit percentages are based on risk factors found in the FAR Part 31which have been applied to the specific type of work included in this project. The following percentages establish the maximum allowable markups (OH&P) for contractor self-performed work:

Overhead………………10% Profit…………………..10%

2. The total aggregate limit of markup (OH&P) for contractors and subcontractors on modification work shall not exceed twenty percent (20%). The NPS will not be responsible for the allocation of percentages between contractors and subcontractors.

3. If contractors form a partnership, then the partnership may only receive home office overhead and profit in the same amount as an individual contractor (refer to par 1.3, E,1 above). It is the responsibility of the partners to decide on the division of revenue.

4. Combined Increases and Decreases: On proposals involving both increases and decreases in the Contract Price, the overhead and profit mark-ups are required on the net increases and deducted on net decreases.

5. At no time can profit be calculated on Overhead or itself, it must be calculated on direct costs of work only.

PART 2 - PRODUCTS (not used)

PART 3 - EXECUTION (not used)

DEFINITION OF CONTRACT PRICE ITEMS

SECTION 01 27 00

A. This section intends to explain, in general, what is and what is not included in a contract line item, and the limits or cut-off points where one item ends, and another begins.

B. If no contract line item exists for a portion of the work, include the costs in a related item.

1.2 QUALITY ASSURANCE

A. Contract line items for roofing, modification to existing roofing systems, and provision/installation of the new roof systems shall involve materials, equipment, that are thoroughly inspected and approved by the Contracting Officer or their Representative to ensure no defects exist prior to installation.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 LIST OF CONTRACT LINE ITEMS

A. Contract Price Item No.1 – Sloped Roof Area Re-roof

1. This price item consists of furnishing all materials, equipment, and labor for the removal of existing roofing systems and re-roofing of the Sloped Roof Area of the Meriwether Lewis District office, Natchez Trace Parkway.

2. No separate measurement will be made.

3. Payment will be made at the contract unit price, Lump Sum.

B. Contract Price Item No.2 – Sloped Roof Solar Panel Removal and Replacement

1. This price item consists of furnishing all materials, equipment, and labor for the removal of all solar panels and associated roof securement hardware on portions of the existing sloped roof of the Meriwether Lewis District Maintenance Office. The district office roof has approximately 154 solar panels and associated mounting hardware, consisting of two banks of 77 each.

2. Measurement will be made per the Square Foot Basis (SF).

3. Payment will be made at the contract unit price, Square Foot (SF).

C. Contract Price Item No.3 – Flat Roof Area Re-roof

1. This price item consists of furnishing all materials, equipment, and labor for the removal of existing roofing systems and re-roofing of the Flat Roof Area of Meriwether Lewis District Office and Equipment Storage Roof.

2. No separate measurement will be made.

3. Payment will be made at the contract unit price, Lump Sum.

D. Contract Price Item No.4 – Flat Roof Solar Panel Removal and Replacement

1. This price item consists of furnishing all materials, equipment, and labor for the removal of all solar panels and associated roof securement hardware on portions of the existing flat roof of the Meriwether Lewis District Maintenance Office and Equipment Storage Roof. This roof consists of approximately 105 solar panels and associated mounting hardware.

2. Measurement will be made per the Square Foot Basis (SF).

3. Payment will be made at the contract unit price, Square Foot (SF).

PROJECT MANAGEMENT AND COORDINATION

SECTION 01 31 00

A. This Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following where applicable:

1. Construction Coordination.

2. Coordination Drawings.

3. Submittals

4. Requests for Information (RFIs).

5. Project meetings.

6. Environmental Coordination.

B. Related Requirements:

1. Section 01 32 16 “Construction Schedule” for preparing and submitting the Contractor’s construction schedule.

2. Section 01 73 40 “Execution” for procedures for coordinating general installation and field-engineering services, including the establishment of benchmarks and control points.

3. Section 01 77 00 “Closeout Procedures” for coordinating closeout of the Contract.

1.2 CONSTRUCTION COORDINATION

A. Coordination: Coordinate construction operations included in different Sections of the Specifications to ensure the efficient and orderly installation of each part of the work. Coordinate construction operations, included in different Sections, which depend on each other for proper installation, connection, and operation.

1. Schedule construction operations in the sequence required to obtain the best results where installation of one part of the work depends on the installation of other components, before or after its installation.

2. Coordinate the installation of different components with other Contractors to ensure maximum accessibility for required maintenance, service, and repair.

3. Make adequate provisions to accommodate items scheduled for later installation.

4. Where availability of space is limited, coordinate the installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair of all components, including mechanical and electrical.

B. Prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required, notices, reports, and a list of attendees at meetings.

C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities and activities of other contractors to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:

1. Preparation of Contractor's Construction Schedule.

2. Preparation of the Schedule of Values.

3. Installation and removal of temporary facilities and controls.

4. Delivery and processing of submittals.

5. Progress meetings.

6. Pre-installation conferences.

7. Project closeout activities.

8. Commissioning activities.

1.3 SUBMITTALS

A. Division 01 documents: The following items shall be submitted a minimum of one (1) week before the Preconstruction Conference where applicable. Contracting Officer will notify the Contractor of the tentative date for the Pre-Construction Conference.

1. The letter designating Project Superintendent.

2. Construction Schedule.

3. A comprehensive breakdown of the Schedule of Values.

4. Accident Prevention Plan.

5. A list of Subcontractors for this project. Contractor shall provide SF1413 form for all subcontractors.

6. Written statements from subcontractors certifying compliance with applicable labor standard clauses.

7. Satisfactory evidence of liability insurance coverage and workman’s compensation for the Contactor and all subcontractors.

8. Waste Management Plan.

9. Quality Control Plan.

10. Storm Water Pollution Prevention Plan.

11. Indoor Air Quality (IAQ) Management Plan.

12. Contractors Commissioning Plan.

13. List of Required Construction Permits. Include the following information for each permit:

a. Name of Permit.

b. The Agency(ies) with Jurisdiction issuing the permit.

c. Information required from the Government to complete the permit application.

B. All items listed must be provided to the Contracting Officer before the Pre-Construction Conference is held. If all these documents have not been received one week before the scheduled Pre-Construction Conference date, the conference will be canceled, Notice to Proceed will not be issued, and the Contracting Officer will consider other contractual remedies. Work shall not commence until written Notice to Proceed has been issued.

C. Contracting Officer’s Action: Contracting Officer will review each RFI, determine the action required, and respond. Contracting Officer will determine the critical nature of each RFI and issue a response accordingly.

D. The following are not considered to be RFIs and will receive no action: a. Requests for approval of submittals.

E. Requests for approval of substitutions.

F. Requests for approval of the Contractor's means and methods.

G. Requests for coordination information already indicated in the Contract Documents.

H. Requests for adjustments in the Contract Time or the Contract Sum.

I. Requests for interpretation of the Architect's actions on submittals.

J. Incomplete RFIs or inaccurately prepared RFIs.

2. Contracting Officer's action may include a request for additional information, in which case time for response will date from the time of receipt of additional information.

3. Contracting Officer's action on RFIs may result in the need for a change to the Contract Time or the Contract Sum. All contract changes will be processed following the terms and conditions of the contract.

1.5 PROJECT WEB SITE (NOT USED)

1.6 PROJECT MEETINGS

A. Preconstruction Conference: Before the start of construction, the Contracting Officer will arrange an on-site or virtual meeting with the Contractor. The meeting agenda will include the following as a minimum:

1. Roles & Responsibilities/ Lines of Authority.

2. Park rules and regulations.

3. Jobsite Safety.

4. Resolution of comments on required Division 01 documents.

5. Coordination of Subcontractors.

6. Labor law application.

7. Modifications.

8. Payments to Contractor.

9. Payroll reports.

10. Contract time.

11. Liquidated damages.

12. Contractor Performance Evaluation.

13. Display of required posters.

14. Notice to proceed.

15. Correspondence procedures.

16. Acceptance/rejection of work.

17. Progress meetings.

18. Submittal procedures.

19. NPS Final Accessibility Inspection.

20. Environmental requirements.

21. As-constructed drawings/operation and maintenance (O&M) manuals.

22. Saturday, Sunday, holiday, and night work.

23. Reference materials.

24. Value engineering.

B. Progress Meetings: The Contractor will schedule weekly meetings with the Contracting Officer, COR, and Project Team. The Contractor will be responsible for maintaining and distributing agendas and notes form the progress meetings.

1. Attendees: In addition to Government Representatives, each Contractor, Subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these meetings. All participants at the meeting shall be familiar with the Project and authorized to conclude matters relating to the work.

2. Agenda: Review and correct or approve minutes of previous progress meeting. Review other items of significance that could affect progress. The meeting agenda will include the following: a. Approval of minutes of previous meetings.

b. Submittal status.

c. Review of off-site fabrication and delivery schedules.

d. Requests for information (RFI) and other issues.

e. Modifications.

f. Work in progress and projected.

g. Status of required inspections (Special Inspections, Accessibility, etc.)

h. Inspections of work in progress and projected (Special inspections)

i. Construction Schedule update (provide updated CPM).

j. Status of Project Record Drawings and O&M manuals.

k. Any other business relating to work.

C. Pre-installation Conferences: Conduct a pre-installation conference at the Project site before each construction activity that requires coordination with other construction.

1. Attendees: Installer and representatives of manufacturers and fabricators involved in or affected by the installation and its coordination or integration with other materials and installations that have preceded or will follow, shall attend the meeting. Advise Contracting Officer of scheduled meeting dates.

2. Agenda: Review progress of other construction activities and preparations for the activity under consideration, including requirements for the following: a. Contract Documents.

b. Options.

c. Related RFIs.

d. Related Change Orders.

e. Purchases.

f. Deliveries.

g. Submittals.

h. Possible conflicts.

i. Compatibility requirements.

j. Time schedules.

k. Weather limitations.

l. Manufacturer's written instructions.

m. Warranty requirements.

n. Compatibility of materials.

o. Acceptability of substrates.

p. Temporary facilities and controls.

q. Space and access limitations.

r. Regulations of authorities having jurisdiction.

s. Testing and inspecting requirements.

t. Installation procedures.

u. Coordination with other work.

v. Required performance results.

w. Protection of adjacent work.

x. Protection of construction and personnel.

3. Record significant conference discussions, agreements, and disagreements, including required corrective measures and actions.

4. Reporting: Distribute minutes of the meeting to each party present and other parties requiring information.

5. Do not proceed with the installation if the conference cannot be successfully concluded. Initiate whatever actions are necessary to resolve impediments to the performance of the Work and reconvene the conference at the earliest feasible date.

1.7 ENVIRONMENTAL COORDINATION

1. Qualifications: Minimum three (3) years Construction experience on projects of similar size and scope; with environmental procedures like this project; [familiarity with Environmental Management Systems (EMSs) such as ISO 14001]; must be familiar with environmental regulations applicable to construction operations.

2. Responsibilities: Responsibilities shall include:

a. Compliance with applicable Federal, State, and local environmental regulations, including maintaining required documentation.

b. Implementation of the Waste Management Plan (WMP).

c. Implementation of the Indoor Air Quality (IAQ) Management Plan.

d. Implementation of the Storm Water Pollution Prevention Plan (SWPPP) where applicable.

e. Present an overview of environmental issues and summarize site-specific procedures relating to management plans at the Preconstruction conference.

f. Training for Contractor personnel per their position requirements.

g. Monitoring and documentation of environmental procedures.

B. Perform project quality control following requirements where specified in Related Sections, including:

1. Quality Requirements.

2. Regulatory Requirements.

3. Indoor Air Quality (IAQ) Management.

4. Noise & Acoustics Management.

5. Temporary Storm Water Pollution Prevention Environmental Management.

6. Construction Waste Management.

C. Contractor’s Environmental Training Program: The contractor shall provide environmental training for workers performing work on the project site. Training shall include the following:

1. Overview of environmental issues related to the building industry.

2. Overview of environmental issues related to the Project.

3. Review of site-specific procedures and management plans:

a. Construction Waste Management.

b. Indoor Air Quality (IAQ) Management.

c. Noise & Acoustics Management.

d. Temporary Storm Water Pollution Prevention.

4. Pollution Prevention (P2) practices: Submit evidence of P2 training, participation in P2 programs, and familiarity with P2 practices.

5. Compliance with environmental regulations: As specified in Regulatory Requirements. Submit Contractor 40 CFR employee training records upon request of the Contracting Officer.

D. Provide…

This is the start of the file's text. The full file is on GovTribe.